Experience
Senior IT Project Manager
Rail-Flow GmbH
The client operates a SaaS platform for managing rail and intermodal transport (Rail-Flow Transport Management Platform).
For two of its customers, it was looking for a 3-month project management replacement. Both customers offer rail and intermodal transport services. Implementation progress differs: one customer is already live and wanted its Phase 2 enhancements implemented; the other customer is implementing its MVP and entering an intensive testing phase.
As part of the assignment, project management was taken over, including management of the internal development team (offshore Turkey).
- Took over complete project management for 2 customer projects, including the roles of Product Owner and Co-Scrum Master
- Managed agile implementation teams consisting of business analysts, implementation consultants, developers (offshore) and QA staff
- Ensured compliance with and further development of project governance
- Planning and rollout management: creation and maintenance of project and rollout plans as well as coordination of role assignments with the client’s management
- Requirements and change management: management of contractual requirements, bugs and changes
- Customer and project communication: organization and moderation of status meetings and steering committees
- Identification of project risks, initiation of countermeasures and escalation
- Ensured correct and timely invoicing for project services together with Finance
Methods: Scheduling (forward- and backward-based), including milestone planning, structured interviews, multi-project management (in English)
Tools / Technologies: Jira, Confluence / Atlas, Claude (Skills, Artifacts), MS Outlook
Interim Head of PMO
RAILPOOL GmbH
Due to the continued growth of the customer organization and the resulting increase in the number of projects in various areas such as digitalization, investments and finance, demands on the projects are rising. Projects are often started but not completed within the planned timeframe, resources are not clearly assigned and value creation is not clearly demonstrated.
The aim of the assignment was to move an existing project organization from the CDO area to the management level. It was important for governance to be pragmatic, easy to understand and simple to implement in daily project work. Tasks and roles had to be defined and anchored within the organization. In addition, this strategic PMO was to be supported by an IT solution, which had to be selected and introduced.
In addition, all ongoing projects were to be gradually transferred to PMO governance and project management centralized.
- Analysis of the existing PMO framework in the CDO area
- Identification of existing tasks and roles
- Design of a clear division of responsibilities for the new central PMO, including the definition of roles and organizational anchoring
- Coordination of the design with management and other stakeholders
- Selection and implementation of a tool for managing the project portfolio
- Migration of projects to the new PMO structure
- Management of digitalization projects and other strategic initiatives
Methods: Analysis of existing infrastructure data, structured interviews, logically structured documentation of results, multi-project management
Tools / Technologies: MS Office, MS Outlook, MS Planner and Accelerator
Senior IT Business Analyst
TÜV Süd AG
- Supported the team in the Scheduling Optimization area of the newly established Digital Hub to anchor the digitalization strategy.
- Identified, documented and created transparency across the group’s entire IT application landscape in the area of scheduling.
- Conducted and documented market research on scheduling applications.
- Analyzed the existing Application Compass and created a sub-list of scheduling applications.
- Identified contacts and planned and conducted interviews with 5 Lead IT Architects per business unit.
- Planned and conducted approximately 40 interviews with the identified application owners according to priority.
- Technically evaluated the interviews and prepared a management presentation.
- Analyzed existing infrastructure data and created logically structured documentation of results.
- Methods: Analysis of existing infrastructure data, structured interviews, logically structured documentation of results, multinational project management.
- Tools / Technologies: MS Office, MS Outlook.
Migration Project Manager
DB InfraGo AG
- As part of consolidating its IT landscape, DB InfraGo AG wanted to harmonize its software for construction project management.
- A new software solution is currently being developed based on SharePoint, with the aim of replacing as many legacy applications as possible in the three business areas DB Fahrweg, DB Personenbahnhöfe and DB Energie.
- Took over overall rollout management for this software and managed the migration from 3 existing systems with more than 3,000 users.
- Ensured system availability in compliance with construction operations regulations and coordinated the handover to operations.
- Planned the entire rollout for 3 existing systems with more than 5,000 users.
- Clarified the migration methodology and coordinated exports with external suppliers, drove functional mapping and managed implementation planning with Sharegate and PowerShell.
- Involved the communications department and synchronized with the DevOps teams.
- Stakeholder management and preparation of the migration concept, including testing and soft launch.
- Applied structured interviews, Jira, Confluence, Miro, SAFe and Kanban.
- Roadmap and milestone planning as well as business process mapping.
- Analyzed the IT landscape with a focus on software, including data mapping.
- Change management according to Kübler-Ross and Kotter.
- Technologies: MS Outlook, MS Planner, Sharegate, Jira and Confluence with SAFe, Miro.
Post Merger Integration Project Manager
4JET Group
The 4JET Group (Alsdorf) acquired Corning Laser Technologies GmbH (Krailing) at the end of 2024. As head of the PMI (Post-Merger Integration) project, I manage all workstreams, advise on the design of the target organization, and actively lead the IT workstream (including CutOver) and change management.
- Managed the PMI project following 4JET Group’s acquisition of Corning Laser Technologies GmbH.
- Managed the entire post-merger integration (full integration).
- Managed all workstreams, advised on the design of the target organization and actively led the IT workstream, including CutOver and change management.
- Supported negotiations with the works council and the preparation of a reconciliation of interests and social compensation plan.
- Responsible for the focus area of IT applications, including analysis of the IT landscape after the acquisition and selection and implementation of core systems.
- Created an integration plan defining integration priorities.
- Identified, implemented and monitored cost savings and efficiency gains.
- Captured and analyzed the IT landscape and derived implementation proposals for the integration.
- Managed the IT CutOver.
- Ensured a smooth transition without impacting ongoing business.
- Ensured clear and transparent communication with employees and managers and managed resistance and cultural challenges.
- Identified and managed risks.
Methods: Multinational project management, structured interviews, planning and conducting workshops, Target Operating Model (TOM), PMI frameworks, roadmap and milestone planning, business process mapping, analysis of the IT landscape (focus on software), including data mapping, change management according to Kübler-Ross and Kotter, stakeholder management (up to C-level), decision papers (up to C-level).
Tools / Technologies: MS Office, MS Outlook.
IT Sourcing Project Manager
Verwaltungs-Berufsgenossenschaft (VBG)
Due to the current demographics of its workforce, VBG (statutory accident insurance) faces the challenge that 10% of its employees will retire within the next 2 years and nearly 25% within the next 5 years.
To meet this challenge, nearly all processes at the client must be optimized and assessed for potential automation within the next 18 months. The task involves the classic mapping and optimization of end-to-end processes down to level 3-4 (SAP Signavio), as well as identifying and implementing automation opportunities. This includes selecting an RPA application and a suitable IT service provider through a public EU-wide tender (public sector).
- Revision of the market analysis for RPA applications
- Creation of the “RPA Implementation” roadmap
- Preparation of tender documents in coordination with the departments, Procurement and Tendering
- Coordination of RPA use cases with departments and managers
- Publication of the RPA tender, including communication with providers
- Creation of a criteria-based evaluation scheme
- Active evaluation and decision-making
- Service provider management as part of the tender
- Conducting process mapping sessions
- Documentation of processes in SAP Signavio
- Support in organizing the new QM department and using Signavio workflows
Methods: Process mapping interviews, evaluation matrix for RPA providers, roadmap, presentation of RPA use cases, tenders, evaluation of IT applications, evaluation of IT implementation partners
Tools / Technologies: RPA / AI, SAP Signavio, MS DevOps, WebEx, MS Office, MS Outlook
ERP Consultant
BTE Stelcon GmbH
- Support for the implementation of Microsoft Dynamics 365 Finance & Operations as part of the group-wide IT strategy.
- Responsibility for planning, execution and documentation in the areas of training, support, migration and testing.
- Execution of system tests and reporting of results to the implementation partner.
- Support for change management throughout all project phases.
- Introduction of a Community of Practice, provision of learning materials and establishment of a support structure.
- Familiarization with customer-specific adaptations and configuration of the D365 installation.
- Detailed planning of task areas while taking the overall project plan into account.
- Conducting key user training sessions and workshops, as well as creating training videos.
- Support in creating test cases, as well as managing and supporting the test phases (module and overall integration).
- ERP service provider management.
- Methods: Multinational project management, sub-project initiation, training planning, training delivery, training videos, customized workshop modules, test planning, test documentation, migration planning, consulting on tailored ITIL, stakeholder management (up to C-level), decision papers (up to C-level).
- Technologies: MS Dynamics 365 (F&O), MS Teams, MS Office, MS Sharepoint, MS Outlook.
IT Project Manager / CRM Consultant
value AG
- Support for the relaunch of the Microsoft Dynamics 365 Sales CRM application to optimize and digitize the sales department.
- Mapping of core processes and technical configuration of the application using an agile approach.
- Implementation of incremental changes and simple improvements in the form of an MVP.
- Introduction of a Community of Practice, provision of learning materials and establishment of a support structure.
- Definition of the scope in relation to the process area, as well as conducting process mapping and optimization workshops.
- Establishment and management of an agile implementation backlog (process-related and tool-related).
- Configuration of views, dashboards, workflows, roles and permissions in Dynamics 365.
- Testing and acceptance of backlog items, as well as training and communication on new functionalities.
- Methods: Project initiation, individual interviews, analysis workshops, IT requirements gathering, process mapping workshops, process interviews, process documentation, workshop planning and delivery, agile project management, stakeholder management (up to C-level), decision papers (up to C-level).
- Technologies: MS Dynamics 365 (Sales), MS Teams, MS Office, MS Sharepoint, MS Outlook.
Strategy Consultant / Co-Project Manager Post-Merger Integration
TX Logistik AG
- Operational project management and leadership of the Project Office during the post-merger integration of Exploris Holding Deutschland GmbH.
- Consulting in the areas of production, human resources and IT to support the integration of the new company.
- Initial project setup and in-depth analysis of the departments on the buyer and seller sides.
- Assessment of integration readiness following a reorganization and detailed analysis of the new company's operations.
- Stakeholder management at all levels, from clerks to the Management Board, including consideration of the Italian owner.
- Establishment of the project organization, including regular meetings, project plan and reporting.
- Definition and coordination of work packages, as well as delimitation of the scope of work.
- Analysis of structures, processes and costs through interview series and workshops in the areas of production, IT and human resources.
- Hypothesis-based work to develop revenue, efficiency and cost targets.
- Development of a target organization and coordination with C-level.
- Methods: Multinational project management, individual interviews, project initiation, analysis workshops, IT requirements catalog, process mapping workshops, process interviews, process documentation, workshop planning and delivery, stakeholder management (up to C-level), decision papers (up to C-level).
- Technologies: MS Teams, MS Office.
IT Product Manager
DB Fernverkehr AG
- Interim product management for the train components Vehicle Information System and Reservation System during the transition from project to operations.
- Request and substantive and formal review of offers.
- Monitoring the further development of system components (mini-project), including test planning and commissioning on the train.
- Coordination of incident and problem management between internal departments and suppliers.
- Documentation of processes in the areas of operations and further development.
- Risk and change management, including the creation of Change Requests (CR), as well as serving as the central contact for both system components.
- Creation of annual roadmaps and coordination of budget approval with the client's decision-makers.
- Service provider management: 2 system suppliers for various display devices.
- Conducting supplier workshops, process interviews and using Kanban methods.
- Methods: IT requirements catalog, process interviews, process documentation, workshop planning and delivery, Kanban, supplier workshops.
- Technologies: Jira and Confluence, MS Teams, MS Project, MS Office.
IT Strategy Consultant
Ginkgo Management Consulting GmbH
- Operationalization of the new strategic direction in the IT department of a large automotive OEM.
- Support for an outsourcing project for the management of user hardware and software by an external service provider.
- Mapping of current tasks against the IT strategy to identify core and peripheral tasks.
- Presentation of tasks by team, including resource planning.
- Preparation, facilitation, and documentation of workshops with team leads to align on the task mapping.
- Structured preparation of data using MS Powerpoint and MS Excel.
- Use of storytelling, pyramid principle presentations, and facilitation techniques.
- Methods: Requirements gathering, structured preparation of data using MS Powerpoint and MS Excel, storytelling and pyramid principle presentations, workshop facilitation.
- Technologies: MS Teams, MS Office, MS Project.
IT Project Manager
ROPEX Industrie-Elektronik GmbH
- Relaunch and turnaround management of a previously halted ERP implementation project.
- Conducting an initial project assessment and aligning and documenting all production-related core processes down to Level 2.
- Developing the project structure and organization and gathering requirements for the ERP, processes, data cleansing, and tools subprojects.
- Managing and monitoring project status and conducting process interviews and strategic end-to-end process workshops with management.
- Advising on process planning and optimizing selected processes.
- Managing the IT department in the areas of migration, IT landscape, data modeling, and data flow analysis.
- Introducing a DMS application (DocuWare) to replace a discontinued solution, including process analysis for incoming invoices, outgoing invoices, and logistics data storage.
- Market research and selection of DMS applications, as well as designing the test environment and carrying out the migration.
- Coordinating the introduction of a BI application (Qlik Sense), including capturing the report backlog and aligning roles and permissions.
- Advising on tailored ITIL and conducting requirements workshops.
- Managing service providers as part of the tendering and migration process.
- Methods: One-on-one interviews, project initiation, requirements workshops, IT requirements catalog, process mapping workshops, process interviews, process documentation, workshop planning and facilitation, advising on tailored ITIL, stakeholder management (up to C-level), decision papers (up to C-level).
- Technologies: ERP C3 (Theurer, admin/configuration), DocuWare (DMS; admin/configuration), Qlik Sense (BI; report creation), Sycat, MS Project, MS Teams, MS Office.
IT Project Manager
Julada GmbH
- Complete digitization of merchandise management and connection to an online shop system for a newly founded retailer.
- Planning and implementation of merchandise management, including migration and labeling.
- Connecting the point-of-sale system to merchandise management.
- Creating an initial process map and setting up a partially automated reporting system for accounting.
- Setting up the online shop system and connecting it to merchandise management, including customization via coding.
- Connecting to a logistics service provider.
- Planning and piloting an e-commerce marketing campaign and conducting customer training.
- Use of rapid prototyping and coding in Liquid/CSS/HTML.
- Methods: Requirements gathering, structured interviews, rapid prototyping, coding in Liquid/CSS/HTML.
- Technologies: Shopify, Zettle, Pipedream.com, Meta Marketing Manager, Google Ads, MS Teams, MS Office.
Senior PMO SAFe
DB Netz AG
- Supporting IT departments in their transformation into an agile organization based on the SAFe framework.
- Transitioning traditionally structured programs into Value Teams (Large Solution) and supporting the pilot programs.
- Introducing development teams to the Scrum framework and forming Agile Release Trains (ARTs).
- Taking over the program management office for a large-scale project.
- Planning and carrying out agile program management.
- Coordinating interfaces and planning, conducting, and documenting all meetings between the Value Team and ARTs.
- Responsibility for cross-project risk and dependency management.
- Stakeholder management and administration of the Jira instance for 500 users.
- Leading the Community of Practice for Jira.
- Methods: Agile project management: Scrum & SAFe, change management including stakeholder management, facilitation, documenting results.
- Technologies: Jira, Confluence, AgileHive, MS Teams, MS Office.
IT Product Manager
DB Fernverkehr AG
- Equipping the long-distance fleet with a powerful, manufacturer-independent comfort IT infrastructure.
- Defining the IT infrastructure for the operator area network, including piloting and rollout for each train class.
- Supporting the development of customer-specific software for the central computing unit.
- Checking the cabling and commissioning display systems on the trains using test routines.
- Planning and carrying out agile project management according to Scrum and SAFe.
- Documenting the product roadmap in Confluence.
- Developing and aligning the concept with stakeholders during a reorganization.
- Preparing reports in Jira, as well as allocating budgets and drafting contracts.
- Aligning business requirements with the technical Product Owner.
- Creating the implementation plan, including schedules while staying within budget.
- Accepting delivery artifacts and supporting test planning.
- Methods: Traditional project management including roadmap creation, agile project management: Scrum & SAFe, change management including stakeholder management, budget planning, conducting interviews.
- Technologies: Jira, Confluence, MS Teams, MS Office.
IT Rollout Project Manager
Jungheinrich AG
- Modernization of the complete IT infrastructure, including Identity & Access Management, cloud services, and network technology renewal in 38 sales companies.
- Capacity planning and creation and revision of the project plan.
- Preparation and creation of tender documents for hardware worth more than 1.000.000 Euro.
- Coordination of tenders with experts and review and evaluation of offers.
- Coaching of the co-project lead in agile and traditional project management methods.
- Planning and support of the pilot at 2 locations, including the creation of a blueprint template for the further rollout.
- Planning of the rollout schedule for all 36 locations regarding timing, duration, and staffing needs.
- Preparation, execution, and documentation of steering meetings and Scrum formats.
- Creation of a communication plan for stakeholders.
- Communication of project successes within the customer organization (NewsTalk).
- Service provider management as part of the tender process.
- Methods: Traditional project management including capacity planning, rollout planning, Scrum, change management including stakeholder management, tender execution, coaching methods including questioning techniques, Gordon model, self-coaching, SMART planning.
- Technologies: MS Sharepoint, MS Teams, MS Office.
Lead Consultant
collaboration Factory AG
- Introduction of project management standards for a growing organization with approximately 30 consultants.
- Collection, documentation, and revision of existing artifacts such as tool templates and processes.
- Conducting workshops and interviews to identify relevant PM artifacts according to Prince2 and PMP standards.
- Definition of project phases and introduction of quality gates to standardize the level of quality.
- Design of quality criteria and approval processes.
- Process analysis and documentation according to BPMN 2.0.
- Conducting rapid prototyping and Proof of Concepts (POCs) via cplace.
- Organization-wide communication of project management updates.
- Methods: IT project management, PMP & Prince2, Scrum, structured interviews & workshops for requirements management, prioritization of requirements based on criteria, process analysis and documentation according to BPMN 2.0, rapid prototyping and POCs via cplace.
- Technologies: cplace, Slack, Zoom, MS Office.
IT Project Manager PLM (Low Code)
Continental AG
- Introduction of the PLM/ERP system cplace for the complete product development process through to production planning.
- Replacement of existing isolated solutions with a highly flexible overall solution.
- Analysis and documentation of requirements and creation of a customer-specific backlog.
- Management of implementation according to the Scrum method with IT consultants and external developers.
- Execution of the Go-Live including the Hypercare phase.
- Traditional project management toward management and agile coaching of the implementation team.
- Introduction of implementation reporting with KPIs and regular rescoping.
- Role as Scrum Master and partial Product Owner in the development area.
- Consulting on and execution of adjustments to the data model, including data flow modeling.
- Management of 3 service provider developers.
- Methods: Multinational IT project management, interviews & requirements management, Scrum, change management including stakeholder management.
- Technologies: cplace, Tableau, Slack, Zoom, MS Office.
Project Manager / Change Manager
DB Netz AG
- Management of the rollout team in the Northern regional area for the Standardization of Maintenance Processes project.
- Transformation of all operational employees into a new process and IT landscape with a focus on transparency and efficiency.
- Functional management of the operational project team, including qualification, resource planning, and employee discussions.
- Planning and conducting change workshops for operational managers.
- Implementation and review of the milestone plan using the waterfall model.
- Quality assurance of training content for process, IT, and change formats.
- Regional stakeholder management and feedback to central management.
- Methods: Rollout management, project management, change management including stakeholder management, Trainings+, stakeholder analysis.
- Technologies: Jira and Confluence, MS Office, SAP R3 and 2 frontend applications, customer app (Android), WebEx conference call.
Senior Consultant
DB Schenker Logistics
- Current-state analysis of the project portfolio for the Europe region to increase transparency across all regions.
- Conducting structured interviews with project managers to consistently assess ongoing projects.
- Transfer of the assessment methodology into a standardized corporate process.
- Development of a PMO handbook including status profiles for all projects and detailed 5-pagers for the top 5 projects.
- Creation of a high-level concept for a PMO organization and definition of communication channels.
- Derivation of recommendations for action for each project based on defined criteria.
- Methods: Project management, portfolio management, PMO, stakeholder management (up to C-level), decision templates (up to C-level).
- Technologies: MS Visio, MS Office.
Senior Consultant
DB Services
- Project management, change management and process management in the Northern and Southern regional areas for the introduction of digital order management in facility management.
- Ensuring that new processes and KPIs are followed by operational employees.
- Gathering constructive feedback in expert groups and communicating it to central project management.
- Conducting expert workshops to narrow down problems and develop suggestions for improvement.
- Developing hypotheses to optimize the rollout situation.
- Preparing decision-making and implementation documents for overall project meetings.
- Methods: Rollout management, project management, change management including stakeholder management, stakeholder management (up to C-level), decision-making documents (up to C-level).
- Technologies: WebEx, MS Office.
Senior Consultant
DB Regio
- Supporting the reorganization of indirect areas such as scheduling, fleet management, human resources and finance.
- Conducting a functional analysis of existing processes to identify potential savings.
- Extracting process names and identifying volume drivers together with department heads.
- Creating an as-is view using questionnaires and conducting expert interviews with managers to identify synergies.
- Creating a transition matrix for the organization’s transition and documenting core tasks and new roles.
- Writing optimized role and function descriptions.
- Actively supporting the preparation of decision-making documents and organizational instructions.
- Methods: Process analysis and design, functional analysis and working time assessment, project management, change management, stakeholder management (up to C-level), decision-making documents (up to C-level).
- Technologies: MS Office.
(Senior) Consultant
DB Station & Service
- Analyzing an extensive facility management contract to identify cost optimization potential.
- Identifying approximately 24 potential savings measures based on best-practice approaches.
- Detailing and validating the 4 most promising measures together with the service provider.
- Developing implementation plans and piloting the concepts in a regional area.
- Business analysis in billing and stakeholder management between specialist departments and contractors.
- Presenting the agreed concepts at executive board level.
- Creating profiles for all relevant measures and high-level concepts for the top 5.
- Methods: Business analysis in billing, project management, piloting, change management, stakeholder management (up to C-level), decision-making documents (up to C-level).
- Technologies: MS Office.
Consultant
S-Bahn Hamburg
- Creating a concept for the workshop landscape due to increasing vehicle requirements resulting from a new transport contract.
- Analyzing the impact of the increase in vehicles on production and operations, focusing on maintenance and storage capacities.
- Conducting an as-is analysis of existing storage areas and researching potential new areas.
- Evaluating the areas using a utility value analysis, including a Life Cycle Cost (LCC) assessment.
- Gathering information on infrastructure and real estate through expert interviews at subsidiaries.
- Creating profiles for approximately 24 analyzed storage areas, including technical drawings and cost estimates.
- Determining ownership structures and creating rough implementation roadmaps.
- Methods: Utility value analysis, expert interviews, stakeholder management (up to C-level), decision-making documents (up to C-level).
- Technologies: MS Project, MS Office.
Consultant
DB Netz AG
- Project coordination and documentation in preparation for negotiations on the performance and financing agreement (LuFV 2).
- Verifying the number of assets of all infrastructure companies through database queries (MS Access) and expert surveys.
- Developing a standardized calculation logic for the future funding requirements of the infrastructure companies.
- Validating and restructuring the calculation logic in workshops.
- Supporting the development and assessment of negotiation strategies.
- Merging raw data to create a valid data basis.
- Methods: Data collection using MS Access & MS Excel, project coordination, expert interviews, workshops, stakeholder management (up to C-level), decision-making documents (up to C-level).
- Technologies: MS Access, MS Office.
System Engineer
WABCO Development GmbH
- System development for a multiplex system consisting of up to 9 control units on behalf of EVOBUS.
- Responsibility for requirements management, software integration on hardware, and functional testing of the overall system.
- Prototype commissioning at the customer and management of a software subproject.
- Test management for system tests: creation of test specifications and design of the automated test environment.
- Programming of a software interface from PC to CAN bus.
- Development process according to V-Spice, including code reviews.
- Technologies: MKS Integrity Manager, CANoe, CANalyzer, DOORS, MS Project, MS Office.
Development Engineer
IAV GmbH
- Process development and implementation for the new UDS/ODX diagnostic technology in emission-relevant control units.
- Coordination of technical innovations with control unit manufacturers and adaptation of internal development processes.
- Support for communication between internal departments of different brands and external suppliers.
- Representation of the development department on the ChangeControlBoard.
- Introduction of new work processes in vehicle projects and training of those involved.
- Creation of the necessary process artifacts to support the line organization.
- Testing and acceptance of the delivered files directly on the test vehicle.
- Modeling and presentation of work processes using swimlanes.
- Technologies: MS Office, MS Project.
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Automotive, Information Technology, Manufacturing, Professional Services, Transportation, and Banking and Finance.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Information Technology, Product Development, Quality Assurance, Procurement, and Business Intelligence.
Frequently asked questions
Have questions? Find more information here.
Ole is based in Leipzig, Germany and can operate in on-site, hybrid, and remote work models.
Ole speaks the following languages: German (Native), English (Advanced).
Ole has at least 17 years of experience. During this time, Ole has worked in at least 22 different roles and for 24 different companies. The average length of individual experience is 1 year and 8 months. Note that Ole may not have shared all experience and actually has more experience.
Based on recent experience, Ole would be well-suited for roles such as: Senior IT Project Manager, Interim Head of PMO, Senior IT Business Analyst.
Ole's most recent position is Senior IT Project Manager at Rail-Flow GmbH.
In recent years, Ole has worked for Rail-Flow GmbH, RAILPOOL GmbH, TÜV Süd AG, DB InfraGo AG, and 4JET Group.
Ole is most experienced in industries like Automotive, Information Technology, and Manufacturing. Ole also has some experience in Professional Services, Transportation, and Retail.
Ole is most experienced in business areas like Project Management, Information Technology, and Product Development. Ole also has some experience in Quality Assurance, Business Intelligence, and Procurement.
Ole has recently worked in industries like Manufacturing, Information Technology, and Transportation.
Ole has recently worked in business areas like Project Management, Information Technology, and Business Intelligence.
Ole holds a Master in Business Administration from School of Management, University of Bradford and a Master in Electrical Engineering/Automation Engineering from Universität Hannover.
Ole has 15 certificates. Among them, these include: Bpmn 2.0 Basics, Business Rhetorik, and Certified Merger Integration Manager.
Ole is immediately available full-time for suitable projects.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 25 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Christoph H.
Last position:
Project Manager & Test Manager at Cyber Security
SAP S/4HANA upgrade from Release 2021 to 2025 and FI/CO transformation as part of a new TOM. Four streams and two SAP service providers; management during ongoing operations.
Overall responsibility for time, quality and budget as well as cross-stream coordination of the four streams
Coordination of process streams, business functions and SAP service providers
Establishment and management of governance, planning, risks, dependencies, resources and escalations
Provider management, regular management reporting, and preparation and execution of project and Steering Committee meetings
Responsibility as Test Manager for test strategy, test planning, UAT, defect management and acceptance
Result: Successful preparation for Go-live on 28.09.2026 during ongoing operations; quality and the planned absence of production interruptions ensured. Project governance established and positive feedback from management and stakeholders.
Thomas C.
Last position:
External Consultant to Program Management / SCRUM Master at MVV Energie AG / Soluvia IT Services GmbH
Streamline – Implementation of S/4 HANA Utilities in cooperation with Accenture
Advising and coaching the Program Lead (OPL)
Planning and supporting the execution of all organizational and technical activities to transition from SAP IS-U to SAP S/4 HANA Utilities
Communicating and coordinating with the stakeholders and committees involved (core team, program management, steering committee)
Project and process management
Coaching stream leads in the main project
Requirements management for connecting interfaces to connected systems (non-SAP systems)
Risk management
Resource and capacity planning
Advising the existing migration, testing, interface/connected systems, and training teams
Advising on the management of the SAP systems cutover
Planning and managing necessary post-migration activities, including verification, documentation, and corrections
Team coaching and servant leadership: Supporting one or more Scrum teams as a coach, facilitator, and servant leader
Promoting self-organization, personal accountability, and continuous improvement
Facilitating and continuously improving Scrum events (Daily, Planning, Review, Retrospective)
Ensuring compliance with Scrum values, principles, and practices
Identifying and actively managing impediments to maintain team productivity
Working with Product Owners, Agile Coaches, and leaders to resolve structural barriers
Supporting agile scaling in areas such as SAFe, LeSS, or Nexus
Helping shape agile transitions as part of MVV's digital strategy
Building an agile mindset across the organization through training, workshops, and leading by example
Working with other Scrum Masters and Agile Coaches in the company-wide Agile Chapter
IT systems: ERP: SAP IS-U, SAP S/4 HANA Utilities
Felix B.
Last position:
Digital Consultant and Solution Manager at Vorwerk SE & Co. KG
Launched a new digital product in the Chinese market as part of a global growth strategy.
Served as the link and coordinating interface between central product management, local Chinese teams and international stakeholders.
Managed the overall program to coordinate complex digital projects.
Successfully launched a digital product in China (including successful certification for the Chinese market).
Balanced local requirements with global priorities while taking tax and regulatory requirements into account.
Introduced a new way of working to improve collaboration and coordination across locations.
Developed and implemented a scaling strategy for the digital business model in China.
Used Jira, Confluence, Miro, Scrum, Agile ways of working, SAFe.
Project language: English.
Boris H.
Last position:
Interim Head of Corporate Management & Transformation at HANSAINVEST (Signal Iduna Group)
Context: Corporate transformation - Establishment of a central unit for Corporate Management & Transformation
- ▪ Established and managed the newly created Corporate Management & Transformation department on an interim basis
- ▪ Defined the Target Operating Model as well as the tasks, responsibilities and governance structures of the new unit
- ▪ Established company-wide project portfolio management for the transparent prioritization and management of strategic projects and initiatives
- ▪ Developed governance, decision-making and escalation processes for transformation and change initiatives
- ▪ Designed company-wide process management with an end-to-end process map, defined process responsibilities and consistent process governance
- ▪ Further developed standards and methods for project management, change management and organizational development
- ▪ Managed and supported strategic transformation, digitalization and organizational projects across the company
- ▪ Established systematic benefits realization to measure and track the benefits of change initiatives
- ▪ Advised the management on the prioritization, governance and organizational integration of company-wide change initiatives---
Alexander K.
Last position:
Company AI assessment at ATRON
Kai Z.
Last position:
Enterprise Program Manager / Program Lead at YouGov Consumer Panel Services
The program supports the comprehensive realignment of the German Consumer Panel Services business. It combines a significant panel boost with the reprocessing of historical data and the integration of new receipt data. By significantly expanding and stabilizing the panel with the involvement of external partners, the aim is to improve the validity of the data base and create a reliable foundation for methodology, weighting and customer reporting. At the same time, historically grown processes for data delivery, OCR, matching, item QC, methodology and reporting are being harmonized, further developed technologically and reorganized. The goal is a scalable end-to-end landscape with higher data quality, clear responsibilities, reliable governance and sustainably manageable operational processes.
- Overall management of the restatement program, including the integrated roadmap as well as milestones, dependencies, risks and management decisions.
- Coordination of the panel boost and alignment of the required data deliveries, quality requirements and prerequisites for methodology, weighting and reporting.
- Alignment of business, product, data science, technology, operations and external partners around a shared target picture, aligned priorities and an integrated approach.
- Design of the organizational change triggered by the fundamental realignment of the data base, methodology and management logic, which has a lasting impact on established decision-making and collaboration patterns.
- Establishment and further development of governance, reporting and escalation structures as well as program-wide monitoring and operational processes for reliable management and sustainable handover.
- Management of critical data, technology and provider dependencies, including reprocessing, OCR transition and the timely synchronization of delivery, testing, methodology and reporting.
- Orchestration of international collaboration with teams and stakeholders in Germany, the United Kingdom, Portugal and Romania, as well as with external suppliers in Germany and Austria.
Impact Areas and Expertise: Program & Delivery Leadership, Business & Technology Alignment, Organization & Transformation, Governance & Sustainable Operations, Strategy & Target, Methodic Leadership, Transformation & Change Leadership, Executive Advisory
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Senior IT Project Manager
Nearby freelancers
Professionals working in or nearby Leipzig, Germany

