Experience
Senior Project Manager
Apleona GmbH
- Project review, restructuring and PM for the migration of a total of 12,000 Windows workstation systems (650 applications) from SCCM or Empirum/Matrix42 to MS-Intune following a merger.
- Took over a significantly delayed and poorly managed project in the role of “firefighter”.
- Completely revised and adjusted/updated the planning of the customer and the service provider involved.
- Introduced planning baselining and the recording/mitigation of current risks.
- Introduced an efficient, partly automated planning/reporting interface between MS-Project Planning (service provider) and Jira (customer).
- Restructured meetings to increase efficiency and eliminate redundant appointments.
- Completed the analysis and design phase and prepared basic data for migrations from the heterogeneous systems of the two merged companies.
- Started the User Acceptance Test (UAT).
- Technologies: MS Autopilot, Zero Touch.
Project Manager
Finanz Informatik
- PM for planning and implementation of Life Cycle Management (LCM) measures (EoS, EoL) for network components such as switches and access points.
- Rollout and replacement of switches and access points for each business unit/institution.
- Identification and mitigation of dependencies between LCM measures (e.g. PoE+ requirements of the new APs).
- Development of detailed checklists for the prerequisites of upcoming LCM measures (WLAN coverage plans, access, communication, cable provision).
- Cost calculation as well as planning, commissioning and management of all internal and external service providers involved.
- Escalation communication regarding responsibilities, obligations to cooperate, costs and rework.
- Project closures and handovers to operations.
- Technologies: LAN, WLAN, PoE.
Multi-Project Manager IT Infrastructure
CSL Behring
- Multi-PM for heterogeneous IT infrastructure measures for an international pharmaceutical group as a basis for growth, cost savings, digitalization and IT integration (merger).
- Alignment of software versions to ensure consistent support by the Managed Service Provider (IE-Retirement, Browsium Upgrade, SCCM Upgrades, Windows 10 Upgrade 21H2, migration from MobileIron to MS Intune).
- Establishment of enterprise standards for end-user devices, management and monitoring tools, including plasma centers.
- Remediation of outdated plasma devices to ensure vendor support for hardware and operating systems.
- Optimization of the SOTI MDM configuration, central management of Zebra printers and migration from Dell/Wyse Thin Clients to IGEL systems.
- Ensuring seamless application access between merged companies by aligning client versions and Single-Sign-On.
- Management of international business units and service providers as well as budget responsibility and senior management reporting.
- Technologies: IoT, MDM, SaaS.
Project Manager Cloud / Infrastructure Migrations
Arvato Systems
- Project management for cloud and infrastructure migrations in the utilities segment (energy, gas, airport, railway companies, etc.).
- Migrations from on-premises to cloud (Azure) and from cloud to cloud (OpenStack v2 to Azure, v2 to v3).
- Conducting assessments, knowledge transfer sessions and IaaS/PaaS/SaaS consulting for an average of 80 applications.
- Planning and implementation of transitions/transformations, including testing, CutOver and decommissioning.
- Set up a deployment environment for the software implementation of the Renewable Energy Sources Act (EEG) using CI/CD and containers.
- Developed a process to optimize operational handovers in migration projects.
- Introduced cross-project capacity planning for critical resources.
- Technologies: Azure, OpenStack, Kubernetes, K8s, Continuous Integration, Continuous Deployment, Lift and Shift.
Project Manager Software & Automation
Carl Zeiss SMT GmbH
- Management of a software project for controlling/automating production processes for lithography optics in semiconductor manufacturing.
- Coordination of more than 60 requirements and implementation sub-projects.
- Led a team responsible for requirements gathering and implementation tracking.
- Applied a hybrid approach: agile development teams with traditional overall planning and reporting.
- Prioritization of requirements and resolution of capacity and resource conflicts.
- Established the project in the customer’s production environment, including budgeting and quarterly planning.
- Conducted workshops to integrate DevOps and agile release cycles into contractual delivery obligations.
- Technologies: photolithography, Scrum, Azure DevOps.
Project Manager Digitalization of Music Production
Goldsoundmusic
- Project management initiative for digitalization opportunities in music production.
- Focus on stakeholder needs using Design Thinking and User Stories.
- Organization of workshops for problem definition, idea generation, and prototyping.
- Investigation of technological developments related to bandwidth, audio quality, and latency.
- Consideration of studio outboard equipment as IoT and Edge Devices.
- Technical and musical support during prototyping, as well as development of implementation strategies.
- Technologies: Digital Disruption, Pro Tools, Internet of Things, Edge Computing.
Project Manager
Deutsche Bank
- Project management for the global introduction of certificate-based secure email for all devices (Outlook, Mobile Devices).
- Took over the delayed project as a “firefighter” and strategically divided the rollout using a DevOps approach (Staged Approach / Feature Flags).
- Planning and implementation of the rollout for approx. 140,000 email accounts, including management of communication and training materials.
- Release and test management, as well as coordination of integration activities for highly regulated countries (e.g. Luxembourg, Turkey, Russia).
- Feasibility study on moving the Secure Email infrastructure to the Public Cloud.
- Planning, tendering, staffing, and introduction of a global 24/7 Crypto Service Desk.
- Evaluation of provider offers from India, contracting, and Service Level Management.
- Business Continuity and Disaster Recovery planning, including management of complex multilateral Risk Management processes.
- Technologies: PKI, MDM, Cryptography, Certificates, BCM.
Program Manager & Service Manager
Deutsche Bank
- Program management for restructuring a CISO Cryptography department with 50 employees.
- Structuring the range of services into a program with several CTB projects and RTB services.
- Establishment and staffing of the PMO, as well as budgeting of the overall program.
- Strategic outsourcing to reduce headcount and costs while bringing cryptography expertise in-house.
- Evaluation and selection of providers (On-Site, Nearshore, Offshore), including Due Diligence.
- Service Manager for RTB services (2FA/Smartcard and encryption of unstructured data).
- Led the further development of the Smartcard CMS, including User Self Service Portal and PKI integration.
- Technologies: Multi Factor Authentication, Card Management System, PKI.
Multi-Project / Service Manager CISO
Deutsche Bank
- Multi-project and service management for several projects in the area of the Chief Information Security Officer.
- Strategy and planning for the further development of encrypted mobile phone calls (Secure Mobile Voice) in the executive management area.
- Analysis of usage/usability and vulnerabilities, as well as design of a KPI/KCI system.
- Service management for transparent encryption of file systems (File Server Encryption).
- Analysis and assessment of end-to-end encryption services, including Cloud Services.
- Analysis and strategic recommendation for company-wide SmartCard solutions and two-factor authentication (2FA).
- Planning and implementation of the transition of a PKI support team to a new department.
- Technologies: IAM, Identity & Access Management, PKI, 2FA.
Test Manager / Sub-Project Manager
Deutsche Bank
- Sub-project management of test and defect management for the migration of 55,000 IT workstations worldwide to Private Cloud structures.
- Creation and implementation of the test strategy for approx. 1,200 newly packaged applications on MS Server 2008 R2/Citrix and Windows 7.
- Process and technical integration of physical and virtual test frontends into the existing test environment.
- Consulting and creation of special solutions for business-critical systems in accordance with KWG §25a.
- Integration and redesign of elements of the HP Workplace FSI 360 Services.
- Release planning for the test environment and provider management.
- Technologies: Virtualization, Citrix, HP ALM.
Project Manager
Generali Deutschland Gruppe
- Led a project to migrate approx. 200 end-to-end SLA measurements using robots to a new measurement tool.
- Overall planning of the migration from HP-BAC to Nimsoft.
- Requirements gathering and coordination with stakeholders such as SLA Management and IT Operations.
- Led a Dutch development team.
- Developed a KPI system for tracking the migration and defined quality criteria for operational acceptance.
- Technologies: Nimsoft NimBUS, HP-BAC, SLA monitoring.
Project Manager
Dresdner Bank
- Planned and managed the decommissioning of large infrastructure blocks following a bank merger, taking technical and contractual dependencies into account.
- Defined shutdown sequences and adapted incident management processes to ramp-down SLAs.
- Clarified data backup requirements for forensic and regulatory purposes.
- Led the scaling of all production and pilot systems in the target environment.
- Coordinated the implementation of requirements for 2.047 banking applications (Retail, Corporate, Investment Banking).
- Gathered and managed scaling requirements for IT backend systems.
- Change, risk and issue management as well as reporting to senior management.
- Technologies: Requirements Management, Change Management.
Project Manager
Outsourcing Service Provider / Bank
- Managed the software rollout to heterogeneous target platforms (AIX, XP, W2K, Citrix) for approx. 20,000 systems.
- Coordinated stakeholders such as Vendor Management and business departments, taking encryption standards and firewalls into account.
- Reengineered a Java wrapper that was only available as bytecode, including source code investigation and test machine design.
- Prepared the offshoring of bank application maintenance to India using English-language questionnaires.
- Updated certificates in a PKI environment, including technical planning of VerifyDepth.
- Transitioned a graphical administration application into maintenance status, taking SSL tunneling and DMZ scenarios into account.
Technical Lead / Project Manager
Deutsche Bank / IBM / Software Manufacturer
- Designed and moderated lessons learned sessions to address conflict situations.
- Provided technical leadership for the software rollout from the integration testing phase for approx. 20.000 systems.
- Time-critical troubleshooting in complex system environments with a multilayer software stack (Java, JNI, XML, C, Unix).
- Supported the introduction of a template-based CMMI approach (Maturity Level 3).
- Contributed to a server migration involving approx. 1.000 servers (IBM HW F40/80 to p5, OS AIX 4.3.3 to 5.3).
Project Manager Service Level Management & ITIL
Deutsche Bank / IT Subsidiary
- Introduced Service Level Management (SLM) for the top 30 banking applications, including the design of SLAs and OLAs.
- Defined end-to-end metrics and introduced reporting.
- Redesigned the operations process for AIX, W2K and Citrix environments in line with ITIL.
- Analyzed weaknesses in the current process and mediated in cases of insufficient change acceptance.
- Designed and set up a load testing environment for an X.500 Directory Service using LoadRunner.
- Managed subprojects for various server relocations.
Managing Director / Service Manager
SCS Ltd. / Bank
- Product maintenance and operational support for a business-critical banking platform (middleware solution for retail applications).
- Support of an installed base of 10,000 clients, 1,000 branch servers, and 100 regional servers.
- Analysis of incidents and problems and preparation of workarounds.
- Planning and rollout of new software versions (change management).
- Optimization and automation of operational procedures, including documentation.
- Regular testing to ensure system functionality in the event of central system failures.
- Coordination between 1st, 2nd, and 3rd level support.
- 24/7 monitoring of relevant software subsystems on Windows NT/XP/2000 and AIX.
IT-Security & Systems Manager
Deutsche Bank
- Support in the migration of approximately 18,000 NT workstations to Windows XP.
- Development of procedures for granting minimal permissions for files, network shares, and Registry keys.
- Negotiations with Audit and IT Security regarding the implementation of security policies.
- Design of an integration strategy for Java/JNI interfaces to transaction systems.
- Planning of J2EE integration via JCA or Session/Entity Beans.
Project Manager QA & Systems
Deutsche Bank / Software Manufacturer
- Technical supervision of user data migration during a spin-off, including the development of an emergency stop with data recovery.
- Establishment of an integrated quality assurance process between manufacturer, customer, and operator.
- Introduction of internet-based problem tracking based on Bugzilla.
- Establishment of transaction-based accounting for internal service billing using Perl, Excel, and HTML.
- Design and implementation of procedures for moving central directory services to new hardware (IBM p620).
- Establishment of department-wide software configuration and change management (Continuus/CM, Globus, Asdis).
- Design of a universal test architecture for GUI and API based on XML and Java.
- Technologies: Perl, XML, Java, JNI, Bugzilla, Apache.
Systems Engineer & Coordinator
Deutsche Bank
- Process modeling of event-driven monitoring using Tivoli.
- Overall coordination of Y2K testing activities for group-wide middleware.
- Design and setup of test environments for graphical user interfaces (XRunner/WinRunner) and C development.
- Consulting on the deployment of middleware components in production.
- Development of systems for transferring messages from event logs to reporting systems (C/C++).
- 3rd level support for network and system components (Unix, WinNT, AIX).
- Planning and execution of multi-stage acceptance tests for middleware and CAD/CAM applications.
- Technologies: C, C++, MQSeries, AIX, Tivoli.
HW/SW Development Engineer / Department Manager
EAT GmbH / IT Systems Company
- New development of a complete CAD/CAM solution for the textile industry.
- Design and implementation of windowing technology on graphics screens and ASCII terminals.
- Development of specialized editors, generators, and image data converters (TIFF).
- Development of modular drivers and servers for machine control, including performance tuning.
- Development of a network for image data transfer between workstations (C, Ethernet, TCP/IP, OS9).
- Hardware-related development of CPU boards and SCSI integrations based on VME.
- Coordination of research and development with senior management.
- Delivery of in-house training on operating systems and networks.
- Porting of software from Siemens R to the M series and from OS9 to Unix.
- Technologies: C, C++, OS9, Unix, VME, Ethernet, TCP/IP.
Hardware Developer
Fachhochschule Aachen / Industrie
- Development and implementation of a computer system for remote data transmission applications and software development.
- Design of a CPU board based on the MC 68000.
- Development of an X.25 Communication Controller.
- Creation of a minimal single-board version for series production.
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Banking and Finance, Information Technology, Manufacturing, Telecommunication, Pharmaceutical, and Utilities.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Information Technology, Project Management, Quality Assurance, Operations, Product Development, and Research and Development.
Frequently asked questions
Have questions? Find more information here.
Georg is based in Bad Nauheim, Germany and can operate in on-site, hybrid, and remote work models.
Georg speaks the following languages: German (Native), English (Advanced), French (Elementary).
Georg has at least 37 years of experience. During this time, Georg has worked in at least 17 different roles and for 16 different companies. The average length of individual experience is 2 years and 9 months. Note that Georg may not have shared all experience and actually has more experience.
Based on recent experience, Georg would be well-suited for roles such as: Senior Project Manager, Project Manager, Multi-Project Manager IT Infrastructure.
Georg's most recent position is Senior Project Manager at Apleona GmbH.
In recent years, Georg has worked for Apleona GmbH, Finanz Informatik, CSL Behring, and Arvato Systems.
Georg is most experienced in industries like Banking and Finance, Information Technology, and Manufacturing. Georg also has some experience in Telecommunication, Pharmaceutical, and Utilities.
Georg is most experienced in business areas like Information Technology, Project Management, and Quality Assurance. Georg also has some experience in Operations, Product Development, and Research and Development.
Georg has recently worked in industries like Pharmaceutical, Utilities, and Information Technology.
Georg has recently worked in business areas like Information Technology and Project Management.
Georg holds a Bachelor in Communications Engineering from Fachhochschule Aachen.
Georg has 18 certificates. Among them, these include: Certified ScrumMaster®, Project Management Professional, and Certified ScrumMaster®.
The availability of Georg needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 26 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Achim K.
Last position:
Portfolio Manager, Consultant, Leadership Coach at Abbvie Deutschland GmbH &Co. KG
- Management and optimization of a portfolio of about 100 projects (launches, in-field solutions, data & analytics, digital solutions, digital products)
- Optimization of the existing project standard (playbook) and alignment with the European and global organization (USA)
- Coaching project managers on setup, planning, cooperation with business, GDPR, GxP, data security and launches
- Preparing projects for works council information and project closeout communication
- Optimization of resource management (tracking, allocation, prioritization)
- Taking over individual project leads (off-/transboarding, event management, checking whether WhatsApp is allowed on a business smartphone)
- Supporting the hiring of external project managers
- Optimization of meeting structure, project controlling (KPIs), change and demand management
- Optimization of risk, issue, dependency and quality management and support during internal audits (GxP)
- Optimization of the portfolio steering tool (Smartsheet) on national, European and global level
- Design and implementation of a Business Value Complexity Scoring
- Building a strategic PMO with a sister department and optimizing cross-functional teams
- Reporting, communication and escalation at management level
- Leadership coaching for several future leaders (short-time assignment)
- Development of the concepts "PPM as a Service" and "Internal Customer Approach"
- Development and review of a concept "AI Data Governance" including roles and processes
- Selection and onboarding of the successor
Andreas A.
Last position:
Project Manager for Network and Infrastructure Project Migration EU/US/MEX at Klöckner & Co SE
- Implementation of a Network Access Control (NAC) security system at 106 locations in the USA, Mexico, and three European countries to safeguard facilities against cyberattacks.
- Management of infrastructure renewal in the core network in the USA and Mexico, transitioning to a new hardware provider.
- Optimization of LAN, WAN, and WLAN infrastructure, including division of network topology into dedicated VLAN segments for IT and OT separation.
- Development of project scope definition considering technical and organizational business requirements.
- Integration of local IT resources and external suppliers to capture functional, temporal, and financial requirements.
- Specification of work packages for US/EU NAC system implementation and modernization of the US core network.
- Acquisition of necessary approvals for project execution and budgeting from the board.
- Creation of rollout plans, inventory data collection, data validation, and drafting detailed project definitions.
- Development of a central project control application.
- Execution of pilot implementations to test developed solutions.
Thomas C.
Last position:
External Consultant to Program Management / SCRUM Master at MVV Energie AG / Soluvia IT Services GmbH
Streamline – Implementation of S/4 HANA Utilities in cooperation with Accenture
Advising and coaching the Program Lead (OPL)
Planning and supporting the execution of all organizational and technical activities to transition from SAP IS-U to SAP S/4 HANA Utilities
Communicating and coordinating with the stakeholders and committees involved (core team, program management, steering committee)
Project and process management
Coaching stream leads in the main project
Requirements management for connecting interfaces to connected systems (non-SAP systems)
Risk management
Resource and capacity planning
Advising the existing migration, testing, interface/connected systems, and training teams
Advising on the management of the SAP systems cutover
Planning and managing necessary post-migration activities, including verification, documentation, and corrections
Team coaching and servant leadership: Supporting one or more Scrum teams as a coach, facilitator, and servant leader
Promoting self-organization, personal accountability, and continuous improvement
Facilitating and continuously improving Scrum events (Daily, Planning, Review, Retrospective)
Ensuring compliance with Scrum values, principles, and practices
Identifying and actively managing impediments to maintain team productivity
Working with Product Owners, Agile Coaches, and leaders to resolve structural barriers
Supporting agile scaling in areas such as SAFe, LeSS, or Nexus
Helping shape agile transitions as part of MVV's digital strategy
Building an agile mindset across the organization through training, workshops, and leading by example
Working with other Scrum Masters and Agile Coaches in the company-wide Agile Chapter
IT systems: ERP: SAP IS-U, SAP S/4 HANA Utilities
Sebastian H.
Last position:
Overall Project Manager; Turnaround Manager & Coach at Statutory Health Insurance Fund
- Taking over the troubled project from the internal project management and successful turnaround of project phase 1 (cutover of approx. 1000 servers (VMs)/standard desktops, specialized desktops)
- Responsible project management for the successful phase 1 transition (planning in the shortest possible time followed by implementation (very successful with low ticket volume))
- Stakeholder management – taking over direct (daily before cutover) communication with the client from the Chief Operation Manager in the format of regular meetings in taskforce mode. Rapid rebuilding of the previously lost trust base and restoration of the client relationship for optimal satisfaction
- Taskforce mode to eliminate all existing issues/showstoppers before cutover
- Scope clarification, setup, and scheduling of phase 2 activities (e.g. silo/admin servers)
- Kick-off of phase 2 / handing the project back to the success line for the internal project management/line to handle the remaining defined topics
- Establishing, preparing, and conducting steering committees with V-1 management to align the guardrails
- Moderation of various regular meetings and operational workshops
- Participation in the lessons learned with the client to address dissatisfaction related to the internal project management (before my start! They are extremely satisfied with my work)
- Tools: Atlassian Suite (Confluence/JIRA), MIRO, Sharepoint; MS Office (PowerPoint, Excel, MS Project)
Eberhart N.
Last position:
Service and Change Manager; Project Manager at Uniper-Energy
- Project manager for transition and migration of IPC Trader Telephony to 3CX-based dispatcher and Cloud9-based trader telephony
- Planned and managed company-wide replacement of IPC Trader Telephony with 3CX and Cloud9 solutions
- Continuous improvement of implementation processes and development and execution of optimization measures
- Planned, coordinated and tracked delivery of IT equipment and service provision at all sites
- Led a team of IT site managers to ensure IT services were delivered on time, within budget and with required quality
- Defined project scope in coordination with all business resources
- Planned and executed software and hardware rollouts, including user support during implementation
- Communicated with key customers and service organizations and collaborated with traders, telephony architects, app owners, testers and technical IPC teams
- Conducted stakeholder analysis for creation and maintenance of change management processes
- Managed full change process: prepared change requests, defended them in change board, communicated at company and user level, and supported change implementation
Alagi M.
Last position:
Senior S/4HANA Project Manager in the Energy Sector at RKU Informations- und Telekommunikationsdienste
- Coordination and monitoring of required tasks and resources
- Coordination and ensuring the flow of information between involved departments
- Windows 10/11
- Time management and project control
- Integration of S/4HANA solutions in collaboration with business units
- Microsoft Project
- Confluence
- Jira
- Microsoft Office
- Microsoft Planner
- Responsible expert for client management environment services and patch management
- Coordination of interfaces and integration with existing systems
- Enable and enforce multi-factor authentication (MFA)
- Ensuring data migration and quality during the S/4HANA implementation
- Creation of a project structure plan
- Optimization of the design and implementation of service and client management processes
- Azure AD
- Project management & risk management
- Regular updates and drafting of decision documents for decision-makers
- Set up of an additional Linux-based infrastructure for administrative purposes
- Advising program management on transformation and migration projects
- PowerShell scripting
- Enhancement, maintenance and troubleshooting of the existing ERP application
- Synchronization with on-premises directories (Azure AD Connect)
- Conducting concept development and planning
- Procurement, integration, and deployment of MacBooks
- Autopilot
- Integration of systems into a client management system (Intune), Microsoft Defender, and Azure AD
- Implementation of single sign-on for mobile devices & PCs
- Migration from Active Directory to MS Intune
- Implementation and integration of SAP S/4HANA solutions
- Software packaging (MSI)
- Mobile device management with MS Intune and Mobile Iron
- Management of servers and services using Ansible
- MIM (Microsoft Identity Manager)
- Identity and permission management
- Access management
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Senior Project Manager
Nearby freelancers
Professionals working in or nearby Bad Nauheim, Germany