Experience
Rollout Project Manager
BWI (Bundeswehr IT)
- Efficient management of external service providers: Responsible for coordinating and monitoring external service providers to ensure smooth operations. This included regularly reviewing Service-Level-Agreements (SLAs), proactively resolving issues, and ensuring services were delivered on time.
- Planning and managing a nationwide rollout for 150.000 clients: Developed a comprehensive project plan for deploying 150.000 devices, including schedules, resource management, and risk assessment. Monitored implementation phases from Proof of Concept (PoC) and pilots through to the final rollout phase. Ensured minimal disruption to business operations during the rollout.
- Close coordination with site managers: Worked with the people responsible at all sites to meet project goals in line with local conditions and requirements. Clarified logistics, coordinated building requirements (e.g. network infrastructure), and ensured schedules were met.
- Project monitoring and reporting: Continuously monitored project progress, identified deviations, and took suitable corrective action. Regularly reported to stakeholders and management, providing status updates and recommendations to improve project delivery.
- Risk management and quality assurance: Identified potential project risks, such as delivery delays or technical challenges. Developed and put strategies in place to minimize risks and carried out regular quality assurance to ensure project standards were met.
Project Manager / IT Service Manager
Siemens Healthineers SHS
- Effectively managed external service providers to ensure smooth operations.
- Planned and delivered a global rollout for 82.000 clients.
- Carried out a comprehensive risk analysis, including overall, site-specific, and security risks.
- Successfully combined two existing ServiceNow systems to improve service management.
- Worked closely with program management to achieve project goals.
- Analyzed the existing application landscape and developed solutions.
- Designed and delivered Proof-of-Concepts, pilot projects, and rollouts.
- Developed and improved IT service management processes.
- Used agile methods such as Scrum, SAFe, and Kanban to increase efficiency and flexibility.
- Created metrics and maturity models to assess project progress.
- Advised on implementing IT architectures and integrating Scrum and ITIL.
- Prioritized solutions to improve service quality.
- Tools used: Excel, Visio, Powerpoint.
- Supported business departments during the transition to Windows11.
Project Manager / Product Manager
Siemens SE
- Vendor Management: Responsible for managing external service providers.
- IT Administration: Built and led a 50-person rollout team.
- Project Planning: Created and delivered a worldwide rollout plan for 72.000 clients.
- Preparing for the move to WIN11: The clients were equipped with Windows 10, and Windows 11 was installed on them through an Inplace Upgrade.
- Risk Analysis: Identified and assessed overall risks, as well as risks by site and security risks.
- Training Planning: Organized Master Classes and training sessions as part of the rollout.
- License Management: Managed Office 365 licenses as part of the rollout.
- ServiceNow Implementation: Implemented and integrated the service management tool.
- Coordination with Program Management: Coordinated activities and progress with other project areas.
- Application Analysis: Assessed and analyzed the existing application landscape.
- POC, Pilot and Rollout Planning: Developed and delivered Proof-of-Concepts, pilot projects, and rollout plans.
- ITSM Process Development: Designed and improved IT service management processes.
- Agile Working Methods: Used agile methods such as Scrum, SAFe, Kanban, and similar approaches.
- Software Distribution: Hybrid, on-prem with MECM (formerly SCCM), and in the cloud via InTune in the company's own store.
Project Manager / IT Infrastructure Construction Management / Rollout Manager
Stadtwerke München (SWM)
- Responsible for digitizing Munich's schools as part of the federal government's initiative.
- Planned the entire IT infrastructure using Excel.
- Set up digital teacher and parent evenings by installing a video conferencing room.
- Managed the construction of new schools and the integration of digital infrastructure.
- Planned budgets and calculated costs for new school buildings.
- Managed IT effectively during construction to ensure technologies were integrated smoothly.
- Successfully managed various service providers, including tradespeople and electrical planners.
- Prepared detailed plans for setting up new school buildings, taking digital requirements into account (WAN, LAN, LWL).
- Carried out a comprehensive risk analysis, including documenting construction delays and other potential risks.
- Coordinated with the relevant offices and authorities to ensure compliance with regulations and standards.
- Continuously monitored construction progress and identified issues in good time.
- Trained teachers to use interactive whiteboards, Elmos, and other digital teaching tools.
Transition / Project Manager
Worldline
- Carve-Out of SPS Europa into Worldline: Responsible for a smooth transition of SPS Europa into Worldline.
- Introduction of Windows 10 and Office 365 Cloud Solution in Azure: Managed the migration to Windows 10 and Office 365 in the Azure cloud environment.
- Budget Planning and Cost Calculation: Detailed planning and calculation of total costs and costs per site.
- Vendor Management: Effectively coordinated and managed the various service providers.
- Risk Analysis: Carried out a comprehensive risk analysis, including overall, site-specific, and security risks.
- ServiceNow Implementation: Integrated ServiceNow to improve service management.
- License Management for O365: Managed licenses as part of the Office 365 rollout.
- Moving the DEV Environment out of the PCI Zone: Planned and carried out the move of the DEV environment from the PCI zone to a non-PCI zone.
- Coordination with Program Management: Worked closely with program management to achieve project goals.
- Application Analysis and Testing: Analyzed and tested the existing application landscape in coordination with application owners.
- POC, Pilot and Rollout Planning: Designed and delivered Proof-of-Concepts, pilot projects, and rollouts.
- ITSM Process Development: Developed and improved IT service management processes.
- Working with Agile Methods: Used agile methods such as Scrum, SAFe, and Kanban to increase efficiency and flexibility.
jobs4you
- Set up a recruitment and staffing agency with its own applicant management system.
Project Manager
Olympus Medical
- Supported the planning of the complete IT infrastructure for a new repair facility in Coimbra (Portugal), including server rooms, workstations and cabling.
- Prepared the transition of 260 employees to a new legal entity.
Infrastructure Project Manager
Wittur
- Budget planning.
- Vendor management.
- Project planning for a global rollout (31 sites in 16 countries).
- Cost estimates (total costs, cost per site).
- Risk analysis (overall risk, risk per site, security risk).
- License management for O365 as part of the rollout.
- Negotiated with hardware manufacturers (purchase vs. leasing).
- Coordinated with IT managers worldwide.
- Analyzed and tested the existing application landscape, coordinating with application owners.
- UAT testing.
- Worked with agile methods (Scrum, SAFe, Kanban, etc.).
Interim Service Manager
Axians
- Supported the customer under the service management contract.
- Prepared service reports.
- Supported the customer on site.
- Identified new service needs.
- Vendor management.
- Developed ITSM processes.
- Worked with agile methods (Scrum, SAFe, Kanban, etc.).
Requirements Manager
SIX
- Provided consulting in requirements management, specifically for WIN10 and Microsoft's update cycles.
- Coordinated with business units, Security, Architecture and IT.
- Analyzed the existing application landscape.
- UAT testing.
- Azure data migration.
- Worked with agile methods (Scrum, SAFe, Kanban, etc.).
Rollout Project Manager
Justizministerium Bayern
- Current-state analysis at 180 locations in Bavaria to plan the rollout of the new clients.
- Domain consolidation.
- License management for O365 as part of the rollout.
- Detailed rollout planning based on the locations' topological and internal dependencies.
- Coordination with the individual authorities.
- Application analysis of the existing application landscape.
- UAT test.
- Working with agile methods (Scrum, SAFe, Kanban, or similar).
- Training the on-site support team for the rollout.
Project Manager/Application Testing
Daimler AG
- Transition of the password change process to the new Windows 10 AD structure.
- Consulting in the area of Azure IP.
- Development of ITSM processes.
- Working with agile methods (Scrum, SAFe, Kanban, or similar).
Project Manager
ThyssenKrupp Elevator
- Piloting the new IT infrastructure in Budapest.
- Data center migration of two data centers; moving the servers to the T-Systems data center.
- Preparing the mail migration from multiple Exchange platforms.
- Planning, coordinating, and monitoring the transfer of IT operations to the service provider.
- Application analysis of the existing application landscape.
- UAT test.
Interim Project Manager (sick leave cover)
ProSiebenSat1 Produktion GmbH
- Introduction of a new ITSM tool from HelpLine at ProSiebenSat1 Produktion. Replacing IBM's old tool (Maximo) and, at the same time, replacing the existing WebShop (Matrix42) with HelpLine.
- System integration tests.
- Coordinating all tests with the IT and business departments.
- Reporting to the project management team and executive management.
- Development of ITSM processes.
Multi-Project Manager
MEAG MUNICH ERGO AssetManagement GmbH
- Planning and carrying out the rollout of 1400 new clients with Windows 7 and Office 2013.
- Introducing Windows 7 / Office 2013 / Office 365, as well as a new licensing model (ClicktoRun); license management for Office, Windows, etc. as part of the rollout.
- User acceptance test.
- Application analysis of the existing application landscape.
- Organizing training for the rollout.
- Setting up several video conference rooms for the executive board, operated via Webex.
Service Transition Project Manager Europe
DNV GL SE
- Europe-wide switch to a new WAN provider.
- Europe-wide rollout of approx. 6300 clients (physical hardware replacement) and migration of approx. 17.000 email accounts to the Microsoft Cloud.
- Organization and delivery of training as part of the rollout for 6,300 employees, in collaboration with 6 trainers in Europe.
- Planning and delivery of the rollout in 16 European countries.
- Planning and coordination of training with the locations and trainers.
- Migration of approx. 80 TB of database and file server data to the Azure Cloud.
- Application analysis of the existing application landscape.
- UAT test.
Data and Test Manager
Postbank AG
- Ensured a valid data basis for the rollout across 7 subprojects, all departments and one vendor, as a cross-functional topic in data management.
- Coordinated and aligned the rollout tranche for the 4 planned rollout stages with the departments and subprojects.
- Reporting to management, subprojects and vendor.
- Weekly coordination with the individual department coordinators, project management and service provider.
- Analysis for the upcoming rollout in terms of scope, time required, costs and overall rollout effectiveness.
Project Manager
BWI Informationstechnik GmbH
- Prepared for the Bundeswehr's realignment in the IT infrastructure area at various sites in northern Germany.
- WAN, active LAN and passive LAN expansion.
- Use of process development tools such as (ARIS, TOGAF, SPARX).
Multi-Project Manager
Gruner+Jahr AG & Co KG
- Prepared, tested and migrated the existing Office environment from Office 2003 to Office 2010.
- Coordinated and aligned testing with IT and departments, and User Acceptance Testing.
- Application analysis of the existing application landscape, coordination with application owners.
- Responsible for packaging applications.
- Reduced the existing applications from 5000 software fragments to 365 packages, which were stored in LanDesk (software distribution tool).
- License management for the entire software landscape as part of the rollout.
Test Manager
Deka Bank Deutsche Girozentrale
- Weekly coordination of the approach and planning of tests (banking applications) with the individual department coordinators, project management and service provider.
- Analysis for the upcoming rollout in terms of scope, time required, costs and overall rollout effectiveness, and User Acceptance Testing.
Change Manager
Deutsche Bank
- As part of Deutsche Bank's Cost-Saving Model, Indian employees were onboarded to take over the global Change Approval process.
- Outsourcing of Change Management to an Indian call center.
- Processing and monitoring 400 – 600 changes per day as a team.
- Coordination of all major changes with the business units regarding releases for banking applications.
- Coordination of changes with the vendors IBM, Siemens and Wusis.
Subproject Lead
Deutsche Bank AG
- Rollout of Deutsche Bank's new Global Change Management System.
- Preparation for the new Change Management System as part of a Lean Six Sigma project and development of the new process structure.
- Writing test documentation and test scenarios.
- User Acceptance Test (UAT).
IT Coordinator, Change Manager
T-Systems
- Coordination of the teams involved in the CRMonDemand project for the client (DB, Siebel, interfaces).
- Process analysis, process definition, establishing and expanding communication channels, minimizing and redefining escalation paths.
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Banking and Finance, Information Technology, Government and Administration, Healthcare, Manufacturing, and Media and Entertainment.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Information Technology, Project Management, Operations, Quality Assurance, Procurement, and Human Resources.
Frequently asked questions
Have questions? Find more information here.
Udo is based in Hamburg, Germany and can operate in on-site, hybrid, and remote work models.
Udo speaks the following languages: German (Native), English (Advanced), Spanish (Intermediate), French (Elementary).
Udo has at least 15 years of experience. During this time, Udo has worked in at least 18 different roles and for 23 different companies. The average length of individual experience is 1 year and 8 months. Note that Udo may not have shared all experience and actually has more experience.
Based on recent experience, Udo would be well-suited for roles such as: Rollout Project Manager, Project Manager / IT Service Manager, Project Manager / Product Manager.
Udo's most recent position is Rollout Project Manager at BWI (Bundeswehr IT).
In recent years, Udo has worked for BWI (Bundeswehr IT), Siemens Healthineers SHS, and Siemens SE.
Udo is most experienced in industries like Banking and Finance, Information Technology, and Healthcare. Udo also has some experience in Manufacturing, Government and Administration, and Media and Entertainment.
Udo is most experienced in business areas like Information Technology, Project Management, and Operations. Udo also has some experience in Quality Assurance, Procurement, and Human Resources.
Udo has recently worked in industries like Information Technology, Healthcare, and Government and Administration.
Udo has recently worked in business areas like Information Technology, Project Management, and Procurement.
Udo attended education in Electrical Engineering, Communications Engineering.
Udo has 5 certificates. Among them, these include: ITIL Foundation V3, ITIL Service Management V3, and Prince2.
Udo is immediately available full-time for suitable projects.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 27 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Ralf B.
Last position:
Test Manager and Subproject Manager at SvenMahn IT GmbH & Co. KG
- Managed the Test & Acceptance & Quality Assurance subproject
- Project/program management according to Prince2
- Created and updated the subproject plan
- Managed resources
- Created and carried out tests, created tests in Azure DevOps, MS Dynamics etc.
- Process modeling
- Documented project progress with PowerPoint and SÖREN (in-house development)
- Acceptance of the respective tests by the end customer
- Monitoring and reporting of the subproject
- Budget: N/A
- Team: 4 people
Wilhelm H.
Last position:
Project Manager / Senior Consultant at Anseres GmbH
- Review of BVA sites – compliance audits under VS-NfD framework conditions
- Application of BSI IT Baseline Protection and NdB user obligations
- Conducting security and compliance audits of Federal Office of Administration sites
- Documentation of results in the context of VS-NfD
- Representing the client in workshops and meetings with other federal authorities
- Representing the client to the BSI and aligning security requirements
Frank J.
Last position:
Senior Project Manager / IT Manager - Email Gateway Migration & Information Security at Public Authority
- Strategic planning, detailed technical preparation and operational management of an email gateway migration in a security-critical government environment.
- Preparation of the technical specification and development of technical concepts and migration approaches in line with BSI requirements.
- Technical requirements management with business units, information security and operations.
- Coordination of external service providers, integrators and implementation partners; maintenance of project plans, milestones, resources, risks and dependencies.
- Regular reporting to project management, the program environment and internal stakeholders.
Rafael D.
Last position:
Project Lead Automation at Textile Industry
Analysis and optimization of end-to-end processes in various business areas such as sales, procurement, order processing, and logistics. Redesign of the ERP system. Identification of optimization potential, especially in areas with media discontinuities and manual activities, as well as creation of a prioritized transformation roadmap with clear business cases and implementation recommendations. Management of automation initiatives. RPA at the production site in China. Evaluation and introduction of relevant AI use cases, as well as building basic AI capabilities within the organization. Training internal project team members and supporting them throughout the transformation process to develop a culture of continuous improvement. Close collaboration with IT and external implementation partners, with reporting to senior management.
Main responsibilities and achievements:
- Analysis of business processes and design of automated processes
- Training and support for employees in China and Germany
- 20% cost savings in logistics
- Regular status reports to senior management
Georg D.
Last position:
Senior Project Manager at Apleona GmbH
- Project review, restructuring and PM for the migration of a total of 12,000 Windows workstation systems (650 applications) from SCCM or Empirum/Matrix42 to MS-Intune following a merger.
- Took over a significantly delayed and poorly managed project in the role of “firefighter”.
- Completely revised and adjusted/updated the planning of the customer and the service provider involved.
- Introduced planning baselining and the recording/mitigation of current risks.
- Introduced an efficient, partly automated planning/reporting interface between MS-Project Planning (service provider) and Jira (customer).
- Restructured meetings to increase efficiency and eliminate redundant appointments.
- Completed the analysis and design phase and prepared basic data for migrations from the heterogeneous systems of the two merged companies.
- Started the User Acceptance Test (UAT).
- Technologies: MS Autopilot, Zero Touch.
Paul K.
Last position:
Program Manager – Multi-Project Operational Stabilization (Operational Excellence) at ITDZ - IT Service Center Berlin
- Overall leadership of several strategic operations projects focusing on Workplace Services, SLA Framework, access management, certificate management, e-learning, backup & recovery, test management, and capacity management, as well as the introduction of system monitoring and feasibility studies for 24x7 operations, in some cases including implementation in ServiceNow
- Creation of various ServiceNow operating concepts covering training, access rights, and emergency management as part of a new cloud hosting initiative for the ServiceNow platform
- Executive board reports and leadership of steering committees as part of company-wide strategic objectives, as well as the establishment of new balanced scorecards for measuring KPIs related to optimization-driven project results
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Rollout Project Manager
Nearby freelancers
Professionals working in or nearby Hamburg, Germany