- Lead the subproject for testing, acceptance and quality assurance
- Project/program management according to Prince2
- Create and update subproject plan
- Manage resources
- Create and execute tests; create tests in Azure DevOps, MS Dynamics etc.
- Process modeling
- Document project progress with PowerPoint and SÖREN (in-house development)
- Acceptance of tests by the end client
- Monitor and report on the subproject
- Budget: N/A
- Team: 4 people
Subproject Manager Test & Acceptance
Deutsche Telekom Business Solutions GmbH
- Lead the testing and acceptance subproject
- Project/program management according to Prince2
- Create and update subproject plan
- Stakeholder management
- End-user onboarding and enablement
- Establish change management
- Create system and integration tests
- Define resource requirements and planning
- Manage resources
- Execute tests, including smoke tests
- Document tests in Jira, Jira Xray
- Set up SIAM
- Document project progress with Jira and PowerPoint
- Acceptance of tests by the end client
- Monitor and report on the subproject
- Budget: N/A
- Team: 4 people
ServiceNow Expert/Architect
LBBW
- Project based on Prince2 and Scrum, agile transition management
- Operational excellence in ServiceNow, operational target model
- Change manager including CAB, E-CAB
- Concept development for change management
- Concept development for incident management
- Concept development for problem management
- Build and lead multiple project teams with ServiceNow SPM
- Create the project roadmap, based on ServiceNow SPM
- Create and execute tests with ServiceNow, Jira and Kanban
- Execute tests based on Jira, Jira Xray, smoke tests, operational tests
- Track project KPIs based on ServiceNow SPM
- Resource management based on ServiceNow SPM
- Reporting with ServiceNow SPM and Performance Analytics
- Implementation according to ITIL and TOGAF
- Implement SIAM
- Process modeling
- Stakeholder management
- End-user onboarding and enablement
- Establish change management
- Monitoring with ServiceNow SPM
- Report project status (C-level communication, stakeholders, senior management) based on ServiceNow dashboards and SPM
- Consider regulatory and legal requirements, e.g. BAIT
- Risk management with ServiceNow dashboards
- Scheduling, automation
- Built and implemented ServiceNow as SaaS
- Change management training
ServiceNow Asset Manager
DB Cargo
- ServiceNow basics
- Asset manager
- Classification and differentiation of assets
- Reporting assets with ServiceNow
ServiceNow Expert/Architect
Die Autobahn GmbH des Bundes
- Operational excellence in ServiceNow
- Operational target model
- Incident manager
- Problem manager
- Reporting with ServiceNow
- Monitoring with ServiceNow
Project Manager
Axians IT Security GmbH
- Project setup based on Prince2
- Transition management
- Created and implemented communication framework
- Maintained project plan
- Regular meetings
- Reporting
- Monitoring
Interim Head of Datacenter and ICT
GIB Solutions AG
- Managed the datacenter and ICT
- Used Scrum and waterfall methods
- Staff planning and shift operations
- Integrated user help desk
- Operational target model
- ISO 27001 certification
- Built overall structure for UHD, ICT, datacenter, and admin interface
- Communicated with C-level managers and stakeholders
- Order processes
- Reporting
Project Manager for MAN NSC Site Survey
MAN SE
- Created project definition based on Prince2, covering all infrastructure tasks (LAN/WAN/WLAN, workplace, datacenter, etc.) and applications
- Created project plan based on Prince2
- Allocated project resources
- Transition management
- Led and communicated internationally with the affected countries
- Stakeholder management
- Process modeling
- Integration and end-user enablement
- Established change management
- Worked with tools to store results (LEANIX, iTop, CMDB, etc.)
- Conducted site survey
- Compiled site survey results
- Created site survey status report
- Created final site survey report
ServiceNow Expert/Architect
Dormakaba AG
- Created project based on Prince2
- Status reporting of the project at C-level
- Set up project with different contacts and subprojects using ServiceNow SPM
- Built and led multiple project teams with ServiceNow SPM
- Created project roadmap based on ServiceNow SPM
- Tracked the project with ServiceNow SPM
- Resource management with ServiceNow SPM
- Operational excellence in ServiceNow
- Operational target model
- Change manager including CAB
- Problem manager
- Incident manager
- Implemented according to ITIL and TOGAF
- Stakeholder management
- Integration and end-user enablement
- Established change management
- Scheduling, automation, process modeling
- Conducted tests
- Tracked project KPIs with ServiceNow SPM
- Resource management based on ServiceNow SPM
- Reporting with ServiceNow SPM to C-level management, stakeholders, and senior management
- Reporting with dashboards in ServiceNow, Performance Analytics
- Monitoring with ServiceNow SPM and dashboards
- Collaborated with different project managers, department heads, senior management, and other stakeholders
Project Manager for Office Relocation
Wordline GmbH
- Set up project based on Prince2
- Transformation management
- Created project reports
- Managed project staff
- Created dashboard
- Communicated with C-level
- Stakeholder management
- Integration and end-user enablement
- Established change management
- Selected locations, organized move
- Created monitoring and reporting
- Cost control
- Quality control
ITIL expert, ServiceNow subproject lead
MEAG ERGO Asset Management GmbH
- Project management set up based on Prince2 with ServiceNow SPM
- Transformation management
- Resource control based on ServiceNow SPM
- Tracking KPI development based on ServiceNow SPM
- Harmonizing incident management
- Creating ITIL documents
- Creating ITIL ServiceNow templates
- Implemented SIAM concept
- Tracking the project with ServiceNow SPM
- Resource management based on ServiceNow SPM
- Reporting with ServiceNow SPM
- Reporting with dashboards in ServiceNow
- Considering regulatory and legal requirements e.g. BAIT
- Monitoring with ServiceNow SPM
Service manager and project manager
Transformation BS GmbH & Co KG
- Service manager for carve-out project at Siemens
- Project manager for Siemens transition project
- Project/program manager according to Prince2, various projects
- Defining work packages, budget control, resource planning
- CAB meetings
- Software development meetings
- Scheduling, automation
- Transformation of end user computing
- Set up and managed IAM
- Set up and implemented SIAM
- Communication at CIO level and parts of management board
- Managing setup and integration of SAP modules
- Reporting on various processes and tasks
- Reporting time planning for various projects
- Reporting project progress for various projects
- Managing nearshore vendors/providers
- Process design
- Budget based on size, from €50,000 to €750,000
- Team of 50 FTE
ServiceNow expert/architect
RWE
- Project status reporting at C-level
- Set up the project according to Prince2 with different contacts and subprojects
- Handling change and configuration topics
- Leading the CAB
- Leading the CMDB jour fix
- Escalation of change and configuration topics
- Created, aligned, and updated ServiceNow on-call concepts
- Reporting on change and configuration topics
- Monitoring change and configuration topics
Project manager
Compusafe Data Systems AG
- 24/7 manufacturing support projects
- IAM single sign-on project, etc.
- Transition and transformation of workplaces/end user computing based on ServiceNow SPM
- Built service desk around the world: Munich, Singapore, Houston USA, basic cloud structure, set up and implemented SIAM
- SQL AlwaysOn setup project in Munich, Singapore, Houston USA, basic cloud structure
- End-of-life project for servers and workplaces in Munich, Singapore, Houston USA, basic cloud structure
- International leadership and communication with the affected countries
- Stakeholder management
- Integration and end-user enablement
- Process modeling
- Established change/change management
- Conducted budget planning
- Dashboard definition in ServiceNow and regular reporting to stakeholder management and senior management based on ServiceNow
- Task definition in ServiceNow SPM
- Using Jira
- Implemented SIAM
- Resource calculation in ServiceNow SPM
- Timeframe definition in ServiceNow SPM
- MS Office, MS Project, Jira, Visio, ServiceNow
- ServiceNow system support
- Budget from €75,000 up to €1,250,000
- Team up to 50 FTE
SharePoint manager
Continental AG
- Implementing SharePoint requirements
- Recording current SharePoint alignment
- Defining SharePoint goals
- Translating goals into action
- Reporting current goal achievement
ITIL Framework Specialist
UNISYS
- Analysis of business transactions
- Designed and implemented ITIL processes
- Designed and implemented escalation management
- Defined and implemented manager on duty
- Created service specifications and requirements specification
- Set up SLA reporting
- Drafted contract
Change and Configuration Manager / ITSM Expert/Architect
BITMARCK GmbH
- Escalated changes and configurations, coordinated and structured resulting projects
- Handled change and configuration topics
- Led the CAB
- Led the CMDB jour fix
- Developed ServiceNow and on-call concepts
- Scheduling and automation
- Escalated change and configuration topics
- Reported on change and configuration topics
- Monitored change and configuration topics
Incident Manager / ServiceNow Expert/Architect
Uniqa Versicherungs AG Österreich
- Launched projects according to Prince2 with various stakeholders and subprojects
- Managed the ServiceDesk performance in ServiceNow
- Provided on-call support within ServiceNow
- Prepared project status reports at C-level using ServiceNow for stakeholders and senior management
- Developed on-call concepts
- Defined SLAs, managed SLAs, set KPIs
- Handled incidents
- Escalated incidents
- Reporting
- Monitoring
Project Manager
Vattenfall AG
- Project for island operation for Stromnetz Berlin
- Project for LEAG data centre migration outsourcing deal, carve-out
- Served as transition manager for Managed Workplace
- Rebuilt and transitioned the service desk
- Implemented applications
- Set up and implemented SIAM
- Infrastructure concept and setup
- LAN concept and setup
- WAN MPLS concept and setup
- ICT management and coordination
- Monitored all project outcomes
- Managed file transfer (FTP, etc.)
- Used SharePoint for documentation
- Developed and managed project definitions
- Created project plan based on project definitions
- Developed and executed communication plan
- Managed budget of €450,000 and €1,000,000
- Led team of about 12 people
Project Manager
Akorn AG Switzerland
- Stakeholder communication for all providers
- Stakeholder management
- Integration and end-user enablement
- Established change management
- Created migration concept
- Created and managed project definitions
- Set up data centre migration with new structure, production data management, expanded system landscape
- Built cloud-based architecture
- Process data handling
- Set up and executed project monitoring
- Deployed managed data centre (UNIX, Windows XP, Windows 7)
- Deployed managed workplace (Windows XP, Windows 7)
- Structured and managed infrastructure
- Implemented WAN MPLS and LAN concept
- Managed ICT (Active Directory, DNS, DHCP, security, LDAP, client/server technology, firewall, Citrix, etc.)
- Set up and implemented SIAM
- Managed file transfer (FTP), managed printers and print servers
- System design
- Planned and deployed desktop equipment
- Set up, managed and conducted tests
- Project reporting for specific stakeholders, steering committees, internal team, etc.
- Implemented escalation management
- Documented with SharePoint
- Managed budget from €150,000 to €1,300,000
- Led team of 5 to 25 FTEs depending on project
Substream Lead
T-Systems
- ThyssenKrupp infrastructure/network setup and consolidation, coordination and structuring of the network management substream based on Prince2
- Set up transition management according to Prince2
- Build project plan with MS Project, carve-out project
- Resource planning
- DNS/DHCP/firewall/LAN/WAN
- Implemented SIAM
- Security adjustments/redeployment
- IT infrastructure modifications
- Team leadership, reorganization of IT team, selection based on staff skills
- End user computing in network context
- Transition project for managed file transfer, managed printer, and print server
- Communication with CIO and, if necessary, executive management/board
- Reporting of processes and tasks to CIO
- Migration of SAP modules
- Set up and managed tests/smoke tests
- Monitoring of processes and tasks
- Negotiations with suppliers, providers/vendors
- Budget: €500,000
- Team of 25 FTE
Interim Service Manager
Schunk
- Coordination and structuring of service management based on ITIL framework, ServiceNow expert/architect
- Rebuild and restructuring of service management
- Incident, problem, change, demand management, request handling
- CMDB structuring and evaluation
- Handle various processes according to ITIL v3.0, implement various additional processes
- Implemented SIAM
- Invoice verification, request handling
- Resource planning
- IT infrastructure adjustments to modern requirements
- Team leadership, reorganization of IT team, selection based on staff skills
- Communication with CIO and, if needed, executive management/board
- Reporting of processes and tasks to CIO
- Monitoring of processes and tasks
- Negotiations with suppliers, providers/vendors, user help desk
- Team of 25 employees
Move Manager
Allianz
- Coordination of the move and migration of data centers from Milan to Frankfurt and Paris (Germany, Italy, France), project management based on Prince2
- Transformation management and project setup according to Prince2
- Set up and manage schedule and budget
- International leadership and communication with involved countries
- Data center migration from Milan to Frankfurt
- Definition of T-minus plan
- Setup of the runbook
- System design for systems to be moved
- Coordination of the move, Apache, Cisco, MS SQL V?, Oracle V?, UNIX derivatives (RedHat, Linux, etc.)
- Escalation management
- Project monitoring
- Project reporting
- Team of 5 employees
Rollout Manager
Volkswagen Financial Services
- Preparation and execution of global rollout based on Prince2, coordination of global rollout management in Wolfsburg, Braunschweig, Seoul (South Korea), Singapore, Detroit (USA), Dallas (USA), Cape Town (South Africa), Sao Paulo (Brazil), India, etc.
- Client-based authentication 802.1X, IAM
- Set up transition management for the project according to Prince2, define work packages
- Create project baseline
- Handle work packages
- Define global service infrastructure
- International leadership and communication with respective countries
- Prepare site surveys
- Prepare rollout
- Set up, manage, and conduct IAM and smoke tests
- Implemented SIAM
- Monitor and report on the subproject
- Define escalation management
- Control project progress
- Project documentation
- Create reports
Release Manager
Stadtwerke München
- Service management activities
- Coordination between requirements management, development management, and test environment, based on ITIL
- Working with Omnitracker
- Use of SAP
- ITIL processes
- Coordinating results
- Reporting and monitoring
Consulting Assignment
Postbank Bonn
- Analyze demand management and stakeholder management of the Demand Management department at Postbank
- Analyze the IT demand process
- Analyze the tool landscape
- Evaluate the results
- Report to management
- Budget 50.000 €
- Team of 7 employees
Project Manager
Swisscom
- Prepare Enterprise Cloud, liaise with stakeholder and portfolio manager at Swisscom, Scrum-based
- Set up transformation management of the project according to Prince2, define work packages
- Baseline of the project plan created
- Work on the work packages
- Report to management for Enterprise Cloud (Hybrid Cloud, Private Cloud, Public Cloud)
- System design
- Monitor project progress
- Document project
- Create reports
- Monitor the project
- Budget 2.0 Mio CHF
- Team of 10 FTE
Process Consultant
SAP AG
- Design ITIL-oriented processes for cloud projects
- Process design for cloud computing
- ITIL process design and implementation
- Adapt SAP structure to the new ITIL process landscape
- Integrate internal operations team into the customer's operations team environment
- Document the process design
- Team size of 10 employees
Project Manager for ITIL-based Implementation
NCR GmbH
- Set up the project according to ITIL V3.0
- Define and implement main processes: Incident, Problem, Change, Service Request, Asset
- Monitor with SMARTS
- Document with SharePoint
- Set up Cisco Collaboration
- Monitor the project
- Report to the client
- Team: 10 employees
Program Manager/Director
EON
- Transition/Transformation/Outsourcing/Migration project with provider management in France and Germany, based on Prince2
- Transformation management as program manager based on Prince2
- Stakeholder communication for all providers/vendors
- Data center migration from Paris, France to Hanover
- Create migration concept for data center
- Create and manage project definition
- Lead and communicate internationally with the countries involved
- Stakeholder management
- Integration and end-user enablement
- Establish change management
- Set up and manage SIAM
- Set up and carry out project monitoring
- Implement the managed data center project (UNIX, Windows XP, Windows 7)
- Implement the managed workplace project (Windows XP, Windows 7)
- Implement WAN MPLS and LAN concept
- ICT management (Active Directory, DNS, DHCP, security, LDAP, client/server technology, firewall, Citrix, etc.)
- Configure managed workplace/desktop, set up new systems, define lifecycle process flows, etc.
- Managed file transfer, managed printer, and server
- Project reporting (stakeholder specific, steering committees, internal project, etc.)
- System design
- ITIL process design and implementation
- Implemented escalation management
- Implemented manager on duty
- Established user help desk/service desk and created documentation
- Outsource parts of service management (near shore, offshore)
- Change management with CAB, change impact analysis
- Set up end-user communication
- Document with SharePoint
- Budget approx. 2,5 Mio. €
- Team size approx. 20 employees
Rollout Coordinator
DB Systel
- Rollout coordinator for on-site service setup in Poland, Italy, Switzerland, France, Germany
- Transformation management based on Prince2
- Set up project structure with MS Project
- Implemented WAN MPLS and LAN concept
- Established on-site services
- Led international communication with each country
- ICT management (Active Directory, DNS, security, LDAP, client/server technology, firewall, Citrix, DHCP, etc.)
- Set up and managed SIAM
- Designed and implemented ITIL processes, designed and implemented escalation management, defined and implemented manager on duty
- Established end-user communication
- Project reporting
- Set up monitoring
- Documentation with SharePoint
- Budget approx. €1.5M
- Team size approx. 10 members
As-Is Analysis and Target Concept for LAN and WAN
Fritz Winter GmbH & CO KG
- Current network structure (physical and logical)
- Spanning Tree, VLAN
- IP address structure (IP planning, subnet planning)
- Security issues (firewall, DMZ, TACACS, RADIUS)
- ITIL process design and implementation
- Service concept
- UPS (uninterruptible power supply)
- Broadband, IPX, Token Ring, etc.
- Budget approx. €1.0M
- Team size approx. 5 members
Subproject Manager for Outsourcing Project
E.ON for T-Systems International GmbH
- Transformation planning/migration project for E.ON's international WAN based on Prince2 for the UK, Benelux, Sweden, Denmark, Hungary, Bulgaria, Czech Republic, Romania
- Transformation management based on Prince2
- Coordinated, defined, implemented and documented project structure with MS Project
- Created and implemented WAN MPLS and LAN concept
- Executed migration project
- Communication with each country
- Managed and coordinated providers
- Managed and coordinated rollout managers
- Change management with CAB, change impact analysis
- Contract negotiations
- Project documentation
- Project reporting
- Established end-user communication
- Documentation with SharePoint
- Set up monitoring
- Budget approx. €5M
- Team size approx. 50 members
Transition Manager and Coach for Project Management
sds Business Service
- Transition manager and coach for project management for the individual companies of the Saint-Gobain group (Germany, Netherlands, Belgium, Luxembourg)
- Transition management based on Prince2
- Recorded hardware and software assets
- Coordinated the service desk for handover
- Led international communication with the affected countries
- Defined and set up ITIL processes
- Set up and managed SIAM
- Change management with CAB, change impact analysis
- Migrated from the old structure to the new service desk structure
- Implemented the new user help desk/service desk
- Executed and adapted processes for downstream units
- Budget approx. €1M
- Team size approx. 15 members
Bid Manager
T-Systems France
- Coordinated proposal creation for Novelis
- Proposal for building a data center (spread across Frankfurt, Houston USA, Singapore)
- Resource management
- Planned 24/7 service desk availability across 3 time zones
- Data center services (LAN, SQL databases, Citrix, security, Active Directory, DNS, etc.)
- Planned data migration to the new data center
- Set up planning for managed workplace
- Established communication with each country
- Adapted network services (WAN MPLS and LAN) outside and inside the data centers
- Implemented computing services into the new structure
- Calculated user help desk costs
- Project reporting with MS Project
- Monitoring based on Business Objects
- Budget approx. €4.5M
- Team size approx. 8 FTE
Subproject Lead for Development of an Operations Concept
Nokia Siemens Network
- Coordination, definition, implementation and documentation of operational processes
- Development of process design based on ITIL V3.0
- Change management with CAB, change impact analysis
- Set up and implementation of SIAM
- User help desk/service desk incident and problem management
- Integration of trouble ticket systems
- IPLS, MPLS, IP-based, etc.
- Budget approx. €300k
- Team size approx. 5 employees
Project Manager for WAN Structures Implementation
MAN AG
- MAN carve-out Volkswagen Trucks & Buses for Brazil, Germany, South Africa, India
- Transformation management based on Prince2
- Project based on carve-out concept, separation of workplaces (MAN, Volkswagen)
- Project planning with MS Project
- Established communication with the respective countries
- Coordination, definition, introduction and documentation of project processes
- Implementation of the carve-out based on the existing infrastructure with necessary extensions for strict network separation
- Definition of work packages, structuring and implementation of work packages: WAN MPLS, LAN, Citrix, firewall, security, managed workplace, etc., managed file transfer, managed printer and server
- Conducted due diligence
- Documentation with SharePoint
- Reporting and monitoring of the project
- Budget approx. €1m
- Team size approx. 20 employees
Program Management/Director
KPMG
- Transition from London to Berlin based on Prince2
- Coordination, definition and implementation of work packages with MS Project
- Migration concept, transition and transformation management for risk management, solution architecture, financial management, etc.
- Project due diligence review
- Established communication with the respective countries
- Project control according to work packages
- Resource management of the employees to be deployed
- Definition of data center services with implementation of data migration to the new target environment
- International leadership and communication with the countries involved (Germany, United Kingdom)
- Structuring, implementation and execution of work packages: storage and backup, platform services, application services, internet access, Active Directory, SharePoint, Citrix, file and print services, firewall
- Network services connectivity (LAN and WAN MPLS) in the data center
- Implementation of computing services (Citrix based) in the new data center
- Migration of databases to the new data center
- Establishment of the user help desk/service desk according to the target architecture, 24/7/365 in Germany
- SAP transition, implementation of new version parallel to restructuring into the new data center
- ITIL documentation and implementation and commissioning
- Change management with CAB, change impact analysis
- Service desk with incident and problem management
- Set up and implementation of SIAM
- Managed file transfer, managed printer and server
- Project reporting (various stakeholders, steering committee, internal, etc.)
- Documentation with SharePoint
- Project monitoring
- Offshore (India) for partial services
- Budget approx. €45m
- Team size approx. 100 employees
Project Manager and Coach for Project Management
MAN AG
- Transition and transformation management in ICT for Brazil, Germany, USA, Canada, South Africa, India
- Transition management based on Prince2
- Project planning and structuring with MS Project
- Create and implement migration concept
- International leadership and communication with the countries involved
- Definition of work packages
- Project due diligence review
- Definition, introduction and documentation of project processes
- Management of the implementation of work packages (data center, databases, Citrix, LAN, WAN MPLS, etc.)
- Set up and implementation of SIAM
- Negotiation of acceptance with the end customer
- ITIL documentation and implementation
- Establishment of a user help desk/service desk with focus on incident and problem management
- Transformation of managed workplaces
- Change management with CAB, change impact analysis
- Documentation with SharePoint
- Project reporting
- Set up project monitoring
- Budget approx. €1m – €5m
- Team size approx. 20 employees
Project Manager and Coach in Project Management
MAN IT Services GmbH
- Migration, transition and transformation management in ICT for Brazil, Germany, USA, Canada, South Africa
- Transition management based on Prince2
- Project planning and structuring with MS Project
- Definition of work packages
- International leadership and communication with the countries involved
- Definition, introduction and documentation of project processes
- Project due diligence
- Management of the implementation of work packages (data center, databases, Citrix, LAN, WAN MPLS, etc.)
- ITIL documentation and implementation
- Transformation manager of managed workplaces
- Established user help desk, service desk specifically for incident and problem management
- Set up and management of SIAM
- Change management with CAB, change impact analysis
- Negotiation of acceptance with the end customer
- Reporting
- Documentation with SharePoint
- Project monitoring
- Budget approx. €1m
- Team size approx. 20 employees
Interim Manager for Worldwide Service Management Setup
Volkswagen AG
- Establishing service management worldwide (Germany, Italy, France, Poland, Russia, Czechoslovakia, Hungary, United Kingdom, Spain, Portugal, USA, Mexico, Brazil, Argentina, PR China, Singapore, Malaysia, Korea, Japan, South Africa, India, Australia, New Zealand)
- Transition management based on Prince2
- Set up project structure with MS Project, executed the project based on defined work packages
- International leadership and communication with the respective countries
- Coordination, definition, implementation and documentation of operational processes internationally based on ITIL V2.0/V3.0
- Established a 24x7 service desk operation in Singapore, aligned with the German service desk and integrated into the overall concept, using Remedy as the base tool
- Created and introduced WAN MPLS and LAN concept, liaising with India, Singapore, Germany, USA, South Africa
- Set up and implemented SIAM
- Managed File Transfer (FTP)
- Managed Print Server
- Implemented escalation management
- Implemented Manager on Duty
- Introduced a service management tool
- Change management with CAB, change impact analysis
- Supplier negotiations, contract negotiations
- Implemented operational processes per country, conducted training per country
- Operative management, service desk setup, service management, escalations, controlling change, problem and incident processes
- Carried out project reporting
- Set up user help desk, nearshore (Hungary, Romania, Slovakia) for parts of service desk (3rd level support)
- Offshore user help desk (India) for parts of the service structure
- Documentation with SharePoint
- Set up project monitoring
- Budget approx. €10 million
- Team size approx. 35 employees
Project Support for TOTAL VSAT WAN
T-Systems France
- Project support for TOTAL VSAT WAN in France and Switzerland
- Coordinated, defined, implemented and documented the project structure with MS Project
- Coordinated, defined, implemented and documented operational processes based on ITIL V2.0, created operations concept
- Implemented escalation management
- Implemented Manager on Duty
- Supplier negotiations
- Project reporting and monitoring
Project Manager for Airbus Asia WAN
Airbus Industries
- Project lead for Airbus Asia WAN (PR China, France, Germany), connecting 20 sites in China to the Airbus world in Toulouse and Hamburg
- Transition management based on Prince2
- Definition of project work packages
- Implemented the project structure with MS Project
- Coordination, definition, implementation and documentation of processes and services
- International leadership and communication with the respective countries (PR China, India, Germany, France)
- Alignment of the WAN MPLS concept based on the developed blueprint specifications
- Implementation of the WAN MPLS concept according to the blueprint specifications
- Set up 24x7 service desk operation in China, including Manager on Duty
- Documented and implemented incident, problem and change management
- Set up and implemented SIAM
- Implemented escalation management
- Implemented Manager on Duty
- Coordination of the operating units
- Reporting
- Project monitoring
- Budget approx. €25 million
- Team size approx. 35 employees
Subproject Manager for Siemens Share IT Services
Siemens IT Solutions and Services
- Subproject manager for Siemens Share IT Services in Munich, Germany, Netherlands, United Kingdom, Switzerland
- Transformation management for shared service integration
- Controlled the project at the level of the acceptance manager
- Project planning and management of the transformation using MS Project
- International leadership and communication with the respective countries
- Coordination, definition, implementation and documentation of processes
- Structured work packages for LAN, WAN MPLS, RAS (Remote Access Service), INAC (Internet Access)
- Set up and implemented SIAM
- Managed File Transfer, Managed Print Server
- Definition, implementation and documentation of services and processes
- Interim management until the transfer to operations
- Coordination of the operating units
- Project reporting and monitoring
- Budget approx. €35 million
- Team size approx. 50 employees
Project Manager for Implementing a Planning Tool
O2
- Project manager for implementing a planning tool for mobile network expansion
- Transition management based on Prince2
- Project planning and project management
- Supplier negotiations with responsibility for results
- Managed product selection
- Deployment in test environment
- Selection and implementation of the chosen product
- Coordination of the operating units
- Project reporting and monitoring
- Budget approx. €0.5 million
- Team size approx. 3 employees
Various Projects
T-Systems International GmbH
- Various projects for Siemens AG, EADS, Eurofighter, Airbus, Allianz, Europcar
- Transition management, transformation management based on Prince2
- Set up project structure with MS Project
- Operations concepts, workflow design
- Support as service manager for the global user help desk
- Coordination, definition, implementation and documentation of operations processes, international based on ITIL V2.0 and V3.0, established escalation management, established manager on duty, established application operations
- Set up and implemented SIAM
- Change management with CAB
- Change impact analysis
- Technical basics: Frame Relay, ISDN, Cisco, Nortel, MPLS network, IP-based
- Reporting the project to various stakeholders
- Monitoring the project
Subproject Leader Support of Product Management
T-Systems International GmbH
- Support of product management for MPLS/IPLS products
Project Manager for Rollout of New Workstations
Adidas
- Rollout of new workstations in Germany, France, USA
Subproject Leader for Operations Preparation
Europcar
- Operations preparation in Germany, France, Spain, Italy, Portugal, UK
Project Manager for Onboarding New Banks
IT-Austria
- Onboarding new banks for basic WAN MPLS and LAN
Subproject Manager for the setup of a service desk
Deutsche Bank
- Setup of a service desk
Subproject Manager for WAN MPLS and LAN network takeover
Siemens AG
- WAN MPLS and LAN network takeover in Italy
Project Manager for system and network analysis
Drechselmayer Kabelsysteme
- System and network analysis
Subproject Manager
Hypovereinsbank
- Subproject Manager for encryption infrastructure in Germany, Switzerland, Austria
Project Manager for the connection to Deutsche Börse
RaboBank Deutschland
- Connection to Deutsche Börse
Project Manager and Coach in Project Management
Berufsgenossenschaft Bau
- Restructuring of LAN network
Project Manager for Year 2000 Conversion
Kabelmetall Menden
- Year 2000 conversion of a production control system
Consultant for Network Implementation and Data Center Expansion
Veba Oil & Gas Operations Libya
- Consulting for network implementation and data center expansion
Subproject Manager for a New WAN MPLS Environment
Hypovereinsbank
- Subproject manager for a new WAN MPLS environment/migration project
Lecturer/Trainer
Digital Equipment
- Lecturer/Trainer Programming
- Lecturer/Trainer Operating System
- Lecturer/Trainer WAN and LAN Technology
Industry Experience
See where this freelancer has spent most of their professional time.
Experienced in Information Technology, Banking and Finance, Automotive, Manufacturing, Energy, and Telecommunication.
Business Area Experience
See which departments and functions this freelancer has contributed to most.
Experienced in Information Technology, Project Management, Operations, Quality Assurance, Procurement, and Product Development.
Skills
Project Management According To Prince2
Program Manager
Test Manager
Transition Manager
Transformation Manager
Operating Target Model
International Leadership (E.g. Germany, China, India, Singapore, France, United Kingdom, Italy, Russia, Usa, Mexico, Brazil, Argentina, Paraguay, Etc.)
Service Management According To Itil
Process Management Based On Itil
Stakeholder Management
Solution Analysis
Presentation Skills
Analytical Mindset
Goal Orientation
Team Player
Test Manager
Change Management
End-user Onboarding And Enablement
Interdisciplinary And Independent Working Style
High Social Skills
Operating Systems (Unix, Ms-windows, Openvms)
Hardware (Cisco, Ibm, Motorola, Nortel, Hewlett Packard, Etc.)
Networks (Lan/wan, Tcp/ip, Decnet, Terminal Server) And Telecommunications (Mpls, Voip, Frame Relay, Atm)
Databases (Oracle, Rdb, Ms Access)
Cloud Infrastructure, Business Integration, Public Cloud, Private Cloud, Hybrid Cloud, Enterprise Cloud
Itsm, Remedy
Servicenow (Itsm, Itom, Spm, Csdm)
Managed File Transfer
Managed Printer And Print Server
Sharepoint
Citrix, Active Directory, Dns, Dhcp
Security, Security Concepts
Back-office Applications Ms Office, Ms Project, Ms Visio, Ms Excel, Ms Word, Ms Access, Jira, Jira Xray, Bi, Confluence, Azure Devops, Ms Dynamics, Kanban, Process Modeling
Programming In Office Applications
Itil V4 (Not Certified) As Basis, Self-study
Itil V3 (Not Certified) As Basis, Self-study
Prince2 (Not Certified) As Basis, Self-study
Scrum Master (Not Certified) As Basis, Self-study
Program Management, Project Management And Rollout Management In Ict, Telecommunications, And Operations Processes
Interim Management In Service Management For Ict, Data Center Operations, User Help Desk/service Desk, Delivery Management
Operations Manuals Created Based On Itil Best Practices, Definition, Implementation And Documentation Of Operations Processes And Operational Readiness According To The Itil V3.0/v4.0 Best Practice Standards, Change Management, Incident Management, Problem Management, Process Documentation And Application Operations
Defined And Implemented Escalation Management
Established Manager On Duty
Test Manager
Sap Structure Knowledge As Project Manager
Setup Of Service Desk, User Help Desk
Transition And Transformation Of Workplaces/end User Computing
Requirements Management, Demand Management
Reporting Based On Infovista And Business Objects Etc.
Contract Management, Contract Management
Coaching In Project Management And Program Management
Prepare And Deliver Presentations, Lessons Learned
Scheduling And Automation
Automotive Suppliers, Automotive, Banking, Electrical/electronics Industry, Manufacturing Industry, Oil And Gas Industry, It Services, Mechanical Engineering, Hardware/software Companies, Insurance
Languages
Education
Technical University of Munich
Dipl.-Ing. Mechanical Engineering - Process Engineering · Process Engineering · Munich, Germany
Technical University of Munich
Physics · Munich, Germany
High School
High School Diploma
Certifications & licenses
ISO 27001 certification
Project management IHK Regensburg
Statistics
Experience
Global Experience
Expertise
Qualifications
Profile
Frequently asked questions
Do you have questions? Here you can find further information.
What languages does Ralf speak?
How many years of experience does Ralf have?
What roles would Ralf be best suited for?
What is Ralf's latest experience?
What companies has Ralf worked for in recent years?
Which industries is Ralf most experienced in?
Which business areas is Ralf most experienced in?
Which industries has Ralf worked in recently?
Which business areas has Ralf worked in recently?
What is Ralf's education?
Does Ralf have any certificates?
What is the availability of Ralf?
What is the rate of Ralf?
How to hire Ralf?
Similar Freelancers
Discover other experts with similar qualifications and experience
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Test Manager and Subproject Manager