Skip to main content
Top expert badge
Recommended expert
Profile header background

Udo Neubauer-Managing Director

Udo Neubauer
Profile header overlay
Hamburg, Germany

Check rate

Experience

Sep 2024 - Jul 2026
Hamburg, Germany

Project Manager/Rollout Coordinator

BWI

Position Summary
Project Manager/Rollout Coordinator at BWI
Industries
Aerospace and Defense
Business Areas
Information Technology
Project Management

Rollout of printers and PCs

  • Effective control of external service providers for smooth operations.
  • Planning and implementation of a global rollout for 150,000 clients.
  • Carrying out a comprehensive risk analysis, including overall risk, site-specific risks, and security risks.
  • Successful consolidation of two existing ServiceNow systems to optimize service management.
  • Close coordination with program management to achieve project goals.
Jan 2023 - Jun 2024
Erlangen, Germany

Project Manager / IT Service Manager

Siemens Healthineers SHS

Position Summary
Project Manager / IT Service Manager at Siemens Healthineers SHS
Industries
Healthcare
Business Areas
Information Technology
Operations
Project Management

Parental leave replacement and sick leave replacement

  • Effective control of external service providers for smooth operations.
  • Planning and implementation of a global rollout for 82,000 clients.
  • Carrying out a comprehensive risk analysis, including overall risk, site-specific risks, and security risks.
  • Successful consolidation of two existing ServiceNow systems to optimize service management.
  • Close coordination with program management to achieve project goals.
  • Analysis of the existing application landscape and development of solution approaches.
  • Design and execution of proof-of-concepts, pilot projects, and rollouts.
  • Development and optimization of IT service management processes.
  • Application of agile methods such as Scrum, SAFe, and Kanban to increase efficiency and flexibility.
  • Creation of measurement and maturity models to assess project progress.
  • Consulting on the implementation of IT architectures and the integration of Scrum and ITIL.
  • Prioritization of solution measures to improve service quality.
  • Tools used: Excel, Visio, PowerPoint
  • Support for the business departments during the transition to Windows 11
Dec 2021 - Dec 2022
Mühlheim am Main, Germany

Project Manager / Product Manager

Siemens SE

Position Summary
Project Manager / Product Manager at Siemens SE
Industries
Information Technology
Manufacturing
Business Areas
Information Technology
Operations
Project Management

Introduction of a new Digital Workplace

  • Vendor Management: Responsible for controlling external service providers.
  • IT Administration: Building and leading a 50-person team for the rollout.
  • Project Planning: Creating and implementing a worldwide rollout plan for 72,000 clients.
  • Preparation for the WIN11 migration: the clients were equipped with Windows 10, and Windows 11 was brought to the clients via an in-place upgrade
  • Risk Analysis: Identification and assessment of overall risks as well as risks by site and in the security area.
  • Training Planning: Organization of master classes and training sessions as part of the rollout.
  • License Management: Administration of Office 365 licenses as part of the rollout.
  • Introduction of ServiceNow: Implementation and integration of the service management tool.
  • Coordination with Program Management: Alignment of activities and progress with other project areas.
  • Application Analysis: Evaluation and analysis of the existing application landscape.
  • POC, Pilot and Rollout Planning: Development and implementation of proof-of-concept, pilot projects, and rollout plans.
  • Development of ITSM Processes: Design and optimization of IT service management processes.
  • Agile Working Methods: Application of agile methods such as Scrum, SAFe, Kanban, or similar.
  • Software distribution: Hybrid, on-prem with MECM (formerly SCCM), in the cloud via InTune in the company store
Jan 2021 - Oct 2021
Munich, Germany

Project Manager / Site Management IT Infrastructure / Rollout Manager

Stadtwerke München (SWM)

Position Summary
Project Manager / Site Management IT Infrastructure / Rollout Manager at Stadtwerke München (SWM)
Industries
Construction
Education
Business Areas
Information Technology
Project Management

Extension of a primary school building

  • Responsible for the digitalization of Munich schools as part of the federal government initiative.
  • Planning of the entire IT infrastructure via Excel
  • Setup for digital teacher/parent evenings through the installation of a video conferencing room
  • Management of new school buildings and integration of digital infrastructures.
  • Carrying out budget planning and cost calculations for the new school buildings.
  • Effective IT administration during the construction phase to ensure smooth integration of technologies.
  • Successful coordination of various service providers, including tradespeople and electrical planners.
  • Detailed project planning for the setup of the new school buildings, taking digital requirements into account (WAN, LAN, fiber optic, telephony).
  • Comprehensive risk analysis, including documentation of construction delays and other potential risks.
  • Coordination with the relevant offices and authorities to comply with regulations and standards.
  • Continuous monitoring of construction progress and timely identification of problems.
  • Training teachers in the use of interactive whiteboards and Elmos as well as other digital teaching tools.
  • Integration of telephony into the new building in all classrooms, teachers' rooms, swimming pool, and gymnasium
Jan 2021 - Oct 2021
Paris, France

Transition/Project Manager

Worldline

Position Summary
Transition/Project Manager at Worldline
Industries
Banking and Finance
Information Technology
Business Areas
Finance
Information Technology
Operations
Procurement
Project Management

Carve-out of SPS Swiss into Worldline

  • Carve-out of SPS Europe into Worldline:
  • Responsible for the smooth transition of SPS Europe into Worldline.
  • Introduction of Windows 10 and Office 365 cloud solution in Azure:
  • Leading the migration to Windows 10 and Office 365 into the Azure cloud environment.
  • Budget planning and cost calculation:
  • Detailed planning and calculation of total costs as well as costs per site.
  • Vendor control:
  • Effective coordination and control of the various service providers.
  • Risk analysis:
  • Carrying out a comprehensive risk analysis, including overall risk, site-specific risks, and security risks.
  • ServiceNow implementation:
  • Integration of ServiceNow to optimize service management.
  • License management for O365:
  • Administration of licenses as part of the rollout for Office 365.
  • Removing the DEV environment from the PCI zone:
  • Planning and implementation of removing the DEV environment from the PCI zone into a non-PCI zone.
  • Coordination with program management:
  • Close cooperation and coordination with program management to achieve the project goals.
  • Application analysis and tests:
  • Analysis and testing of the existing application landscape, in coordination with the application owners.
  • POC, pilot and rollout planning:
  • Design, execution of proof-of-concepts, pilot projects, and rollouts.
  • Development of ITSM processes:
  • Development and optimization of IT service management processes.
  • Working according to agile methods:
  • Application of agile methods such as Scrum, SAFe, and Kanban to increase efficiency and flexibility.
Jun 2020 - Dec 2020
Leipzig, Germany

jobs4you

Position Summary
Industries
Professional Services
Business Areas
Human Resources
Information Technology

Setting up an agency for HR consulting and recruitment with its own applicant management system

Mar 2020 - Apr 2020
Hamburg, Germany

Project Manager

Olympus Medical

Position Summary
Project Manager at Olympus Medical
Industries
Healthcare
Manufacturing
Business Areas
Information Technology
Operations
Project Management

IT infrastructure planning

  • Support in planning the complete IT infrastructure for a new repair plant in Coimbra (Portugal), including planning the server rooms, workstations, and cabling. Preparation of the transition of 260 employees into a new legal entity.
Aug 2019 - Jan 2020
Scheibbs, Austria

Infrastructure Project Manager

Wittur

Position Summary
Infrastructure Project Manager at Wittur
Industries
Manufacturing
Business Areas
Information Technology
Procurement
Project Management

Introduction of Windows 10 and Office 365 cloud solution in Azure

  • Budget planning
  • Vendor management
  • Project planning for a global rollout across 31 plants in 16 countries
  • Cost calculation (total costs, costs per site)
  • Risk analysis (total risk, risk per site, security risk)
  • License management as part of the rollout for O365
  • Negotiation with hardware manufacturer (purchase vs. leasing)
  • Coordination with IT managers worldwide
  • Application analysis/testing of the existing application landscape, coordination with application owners
  • UAT testing
  • Working with agile methods (Scrum, SAFe, Kanban, etc.)
May 2019 - Jul 2019
Ulm, Germany

Interim Service Manager

Axians

Position Summary
Interim Service Manager at Axians
Industries
Information Technology
Business Areas
Customer Service
Information Technology
Operations
Project Management
  • Support for the customer within the service management contract
  • Creation of service reports
  • On-site support for the customer
  • Identification of new service needs
  • Vendor management
  • Process development of ITSM processes
  • Working with agile methods (Scrum, SAFe, Kanban, etc.)
Aug 2018 - Apr 2019
Zürich, Switzerland

Requirements Manager

SIX

Position Summary
Requirements Manager at SIX
Industries
Banking and Finance
Business Areas
Information Technology
Project Management

WIN10 and Office 2016 and data in Azure

  • Consulting in the area of requirements management, especially for WIN10 and the update cycles at Microsoft
  • Coordination with business units, security, architecture, and IT
  • Application analysis of the existing application landscape
  • UAT testing
  • Azure data migration
  • Working with agile methods (Scrum, SAFe, Kanban, etc.)
Dec 2017 - Aug 2018
Munich, Germany

Rollout Project Manager

Ministry of Justice Bavaria

Position Summary
Rollout Project Manager at Ministry of Justice Bavaria
Industries
Government and Administration
Business Areas
Information Technology
Project Management

WIN10 and Office 2016 and switch to VoIP

  • As part of the rollout, all sites with sufficient line capacity were equipped with Cisco VoIP. This also included the backend transition
  • As-is analysis at 180 sites in Bavaria for planning the rollout of the new clients
  • Domain consolidation
  • License management as part of the O365 rollout
  • Detailed rollout planning based on topological and internal dependencies between the sites
  • Coordination with the individual authorities
  • Application analysis of the existing application landscape
  • UAT testing
  • Working with agile methods (Scrum, SAFe, Kanban, etc.)
  • Training of on-site support for the rollout
Apr 2017 - Nov 2017
Leinfelden-Echterdingen, Germany

Project Manager/Application Testing

Daimler AG

Position Summary
Project Manager/Application Testing at Daimler AG
Industries
Automotive
Information Technology
Business Areas
Information Technology
Operations
Project Management
Quality Assurance

Azure IP and PCP

  • Transition of the password change process to the new Windows 10 AD structure
  • Consulting in the area of Azure IP
  • Process development of ITSM processes
  • Working with agile methods (Scrum, SAFe, Kanban, etc.)
Apr 2016 - Mar 2017
Leinfelden-Echterdingen, Germany

Project Manager

ThyssenKrupp Elevator

Position Summary
Project Manager at ThyssenKrupp Elevator
Industries
Manufacturing
Business Areas
Information Technology
Project Management

Transition of the IT landscape to T-Systems

  • Piloting of the new IT infrastructure in Budapest
  • Data center migration of two data centers, moving the servers to the T-Systems data center
  • Preparation of the mail migration from several Exchange platforms
  • Planning, coordination, and monitoring of the transfer of IT to the service provider
  • Application analysis of the existing application landscape
  • UAT testing
Feb 2016 - Apr 2016
Munich, Germany

Interim Project Manager

ProSiebenSat1 Produktion GmbH

Position Summary
Interim Project Manager at ProSiebenSat1 Produktion GmbH
Industries
Media and Entertainment
Business Areas
Information Technology
Operations
Project Management

Introduction of a new ITSM HelpLine and implementation of the new self-service portal (sick leave cover)

  • Introduction of a new ITSM tool from HelpLine at ProSiebenSat1 Produktion. Replacement of the old IBM tool (Maximo) and, at the same time, replacement of the existing web shop (Matrix42) with HelpLine.
  • System integration tests
  • Coordination of all tests with IT and business departments
  • Reporting to project management and executive management
  • Process development of ITSM processes
Dec 2014 - Dec 2015
Munich, Germany

Multi-Project Manager

MEAG MUNICH ERGO AssetManagement GmbH

Position Summary
Multi-Project Manager at MEAG MUNICH ERGO AssetManagement GmbH
Industries
Banking and Finance
Business Areas
Information Technology
Project Management

Nationwide rollout of Windows 7 and migration from Office 2007 to Office 2013 and switch of telephony to VOIP

  • Transition of about 850 phones to VoIP, both front end and backend
  • Planning and execution of the rollout of 1400 new clients with Windows 7 and Office 2013
  • Introduction of Windows 7 / Office 2013 / Office 365, also a new license model (ClicktoRun) license management as part of the rollout for Office, Windows, etc.
  • User Acceptance Test
  • Application analysis of the existing application landscape
  • Organization of training for the rollout
  • Setup of several video conference rooms for the executive board, operated via Webex
Jan 2014 - Sep 2014
Hamburg, Germany

Project Manager Service Transition Europe

DNV GL SE

Position Summary
Project Manager Service Transition Europe at DNV GL SE
Industries
Information Technology
Business Areas
Information Technology
Project Management

Europe-wide rollout of Windows 7 and migration to Office 365 cloud, database and file server migration

  • Europe-wide switch to a new WAN provider
  • Europe-wide rollout of approx. 6,300 clients (physical hardware replacement) and migration of approx. 17,000 email accounts to the Microsoft cloud.
  • Organization and delivery of training as part of the rollout for 6,300 employees in cooperation with 6 trainers in Europe
  • Planning and delivery of the rollout in 16 European countries
  • Planning and coordination of the training sessions with the locations and the trainers
  • Migration of approx. 80 TB of database and file server data to the Azure cloud
  • Application analysis of the existing application landscape
  • UAT testing
Apr 2013 - Dec 2013
Bonn, Germany

Data and Test Manager

Postbank AG

Position Summary
Data and Test Manager at Postbank AG
Industries
Banking and Finance
Business Areas
Information Technology
Project Management
Quality Assurance

Postbank transition to Deutsche Bank

  • Conversion and migration from GroupWise to Exchange on-premises
  • Ensuring a valid data base for the rollout across 7 subprojects, all departments and one vendor as a cross-cutting topic in data management
  • Coordination and alignment of the rollout tranche for the planned 4 rollout phases with the departments and subprojects
  • Reporting to management, subprojects and vendor
  • Weekly coordination with the individual department coordinators, project management and the service provider
  • Analysis for the upcoming rollout in terms of scope, effort, cost and effectiveness of the entire rollout
Jan 2013 - Mar 2013
Munich, Germany

Project Manager

BWI Informationstechnik GmbH

Position Summary
Project Manager at BWI Informationstechnik GmbH
Industries
Aerospace and Defense
Information Technology
Business Areas
Information Technology
Operations
Project Management

Service transition in an IT infrastructure project for the reorganization of the Bundeswehr (2 subproject managers as a team)

  • Preparation of the reorganization of the Bundeswehr in the IT infrastructure area at various sites in northern Germany
  • WAN, LAN active and LAN passive expansion
  • Process development tools such as (ARIS, TOGAF, SPARX)
Oct 2011 - Nov 2012
Hamburg, Germany

Multi-Project Manager

Gruner+Jahr AG & Co KG

Position Summary
Multi-Project Manager at Gruner+Jahr AG & Co KG
Industries
Information Technology
Media and Entertainment
Business Areas
Information Technology
Operations
Project Management

Migration from Windows XP to Windows 7 and Office 2010

  • Preparation, testing and migration of the existing Office environment from Office 2003 to Office 2010
  • Coordination and alignment of the tests with IT and the business departments and user acceptance testing
  • Application analysis of the existing application landscape, coordination with the application owners
  • Responsible for packaging the applications
  • Breaking down the existing applications from 5,000 software fragments to 365 packages stored in LanDesk (software distribution tool)
  • License management as part of the rollout for the entire software landscape
Apr 2011 - Aug 2011
Frankfurt, Germany

Test Manager

Deka Bank Deutsche Girozentrale

Position Summary
Test Manager at Deka Bank Deutsche Girozentrale
Industries
Banking and Finance
Business Areas
Information Technology
Project Management
Quality Assurance

Migration from Windows XP to Windows 7 and Office 2010

  • Weekly coordination of the approach, planning of tests (banking applications) with the individual department coordinators, project management and the service provider
  • Analysis for the upcoming rollout in terms of scope, effort, cost and effectiveness of the entire rollout and user acceptance testing
Apr 2009 - Mar 2011
Frankfurt, Germany

Change Manager

Deutsche Bank

Position Summary
Change Manager at Deutsche Bank
Industries
Banking and Finance
Information Technology
Business Areas
Information Technology
Operations
Project Management

Running change management for Europe and America

As part of Deutsche Bank's cost-saving model, an onboarding process for Indian employees was set up to take over the global change approval process.

  • Outsourcing of change management to an Indian call center
  • My team handled and monitored between 400 and 600 changes per day
  • Coordination of all major changes with the business departments regarding releases for banking applications
  • Coordination of changes with the vendors IBM, Siemens and Wusis, Lotus Notes as email system
Sep 2008 - Mar 2009
Frankfurt, Germany

Subproject Lead

Deutsche Bank AG

Position Summary
Subproject Lead at Deutsche Bank AG
Industries
Banking and Finance
Business Areas
Information Technology
Operations
Project Management
Quality Assurance

Change Management Rollout

Rollout of Deutsche Bank's new global change management system. This system replaces the two existing systems and is used worldwide.

  • Preparations for the new change management system were done by us as part of a Lean Six Sigma project, and the new process structure was developed
  • Writing test documentation and test scenarios
  • User Acceptance Test (UAT)
Jun 2008 - Aug 2008
Krefeld, Germany

IT Coordinator, Change Manager

T-Systems

Position Summary
IT Coordinator, Change Manager at T-Systems
Industries
Information Technology
Business Areas
Information Technology
Operations
Project Management

Rollout of end devices and virtual workstations

  • Coordination of the departments involved in the project CRMonDemand for the customer (DB, Siebel, interfaces)
  • Process analysis, process definition, building and expanding communication channels, minimizing and redefining escalation paths

Industry Experience

See where this freelancer has spent most of their professional time.

Experienced in Information Technology, Banking and Finance, Manufacturing, Aerospace and Defense, Healthcare, and Media and Entertainment.

Information Technology
Banking and Finance
Manufacturing
Aerospace and Defense
Healthcare
Media and Entertainment
Profile match chart

Business Area Experience

See which departments and functions this freelancer has contributed to most.

Experienced in Information Technology, Project Management, Operations, Quality Assurance, Finance, and Procurement.

Information Technology
Project Management
Operations
Quality Assurance
Finance
Procurement
Profile match chart

Summary

I have many years of experience in projects as project manager, sub-project manager, training coordinator, test manager, license manager, change and incident manager, and interim manager. In these roles, I was always responsible for project planning and control, on the one hand at stakeholder level and on the other hand for coordination with specialists from technical and business areas. As part of project planning and control, I was also responsible for cost planning, presenting the results, and the sensible use of internal and external resources. Since as a project manager I temporarily manage IT operations during the project period, it is natural for me to lead employees, delegate tasks, strengthen team spirit, and redefine and introduce processes. In my previous projects, I have led up to 45 employees. I enjoy taking on new challenges and have the ability to quickly adapt to a new environment. In all of the projects mentioned, I was on site with the customer across Europe and supported the customer. Furthermore, in the Windows 10 and Windows 11 projects, I also analyzed the existing applications and checked whether they were compatible with Win10 and Win11; if not, I had to negotiate with the relevant application owners or business departments about what alternatives were available. Since I also acted as test manager in these projects, we also transferred the newly packaged applications on the IT side and, of course, then into production as part of the UAT tests with the business departments.

Skills

  • Project Management

  • Vendor Management

  • Change And Incident Management

  • Interim Management

  • It Service Management

  • Transition Management

  • Test Management

  • Rollout Management

  • License Manager

  • Project Experience: Agile Methods (Scrum, Safe, Kanban, Etc.) (Over 10 Years)

  • Process Development And Modeling Of It Service Processes (Approx. 5 Years)

  • Working With Process Development Tools Such As (Aris, Togaf, Sparx) (Approx. 5 Years)

  • Working With Atlassian Jira And Confluence (Approx. 10 Years)

  • Rollout Management

  • Databases: Access, Db2, Lotus Notes, Oracle, Mysql

  • Network Technologies: Tcp/Ip, Lan, Wlan, Wan, Vpn, Ftp, Smtp, Pop3, Ldap, Imap

  • Standard Software: Microsoft Windows (7, 8.1, 10, 11)

  • Microsoft Server 2008, 2012, 2016, 2019, Lync, Exchange 2008, 2010, 2013, 2016, Cloud, Skype For Business, Teams, Azure,

  • Office 2016, Office 365, Adobe Portfolio, Lotus Notes Domino

  • Sharepoint 2013, 2016 And Sharepoint Online, Project, Visio,

  • Siebel, Microsoft Dynamics On-Premise And Cloud, Intune

  • Tools: E.G. Test Tools Hp Quality Center, Jira, Ars Remedy, Lean Management, Lean Sixsigma, Helpline (Itsm Tool), Confluence, Servicenow, Webex

  • Methods: Prince 2, Itil V3, Scrum, Kanban, Lean Management, Lean Sixsigma, Istqb

Languages

German
Advanced
English
Advanced
Spanish
Elementary
French
Elementary

Education

Electrical Engineering

University of Applied Sciences Augsburg

Business Informatics · Augsburg, Germany

High School Diploma in Business · Accounting

Certifications & licenses

ITIL Foundation V3

ITIL Service Management V3

Maxpert GmbH

Prince2

Maxpert GmbH

Key Account Manager

TÜV Pfalz

Personal License A for Telecommunications

Statistics

Experience

Total positions 23
Experience in Information Technology 6.5 y
Avg length 9 m
Longest experience 1 y 11 m

Global Experience

Countries worked in 4 (Germany, France, Austria, Switzerland)
Primary country Germany

Expertise

Recent roles Project Manager/Rollout Coordinator, Project Manager / IT Service Manager, Project Manager / Product Manager
Main industries Information Technology, Banking and Finance, Manufacturing
Main business areas Information Technology, Project Management, Operations

Qualifications

Certifications earned 5

Profile

Created

Frequently asked questions

Have questions? Find more information here.

Udo is based in Hamburg, Germany.

Udo speaks the following languages: German (Advanced), English (Advanced), Spanish (Elementary), French (Elementary).

Udo has at least 17 years of experience. During this time, Udo has worked in at least 19 different roles and for 23 different companies. The average length of individual experience is 1 year and 9 months. Note that Udo may not have shared all experience and actually has more experience.

Based on recent experience, Udo would be well-suited for roles such as: Project Manager/Rollout Coordinator, Project Manager / IT Service Manager, Project Manager / Product Manager.

Udo's most recent position is Project Manager/Rollout Coordinator at BWI.

In recent years, Udo has worked for BWI, Siemens Healthineers SHS, Siemens SE, Stadtwerke München (SWM), and Worldline.

Udo is most experienced in industries like Information Technology, Banking and Finance, and Manufacturing. Udo also has some experience in Aerospace and Defense, Healthcare, and Media and Entertainment.

Udo is most experienced in business areas like Information Technology, Project Management, and Operations. Udo also has some experience in Quality Assurance, Procurement, and Finance.

Udo has recently worked in industries like Aerospace and Defense, Information Technology, and Healthcare.

Udo has recently worked in business areas like Information Technology, Project Management, and Operations.

Udo attended education in Electrical Engineering.

Udo has 5 certificates. Among them, these include: ITIL Foundation V3, ITIL Service Management V3, and Prince2.

The availability of Udo needs to be confirmed.

Udo's rate depends on the specific project requirements. Please use the Meet button on the profile to schedule a meeting and discuss the details.

To hire Udo, click the Meet button on the profile to request a meeting and discuss your project needs.

Average rates for similar positions

Rates are based on recent contracts and do not include FRATCH margin.

1200
900
600
300
Rate comparison chart
Market avg: 974-1054 €
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.