Skip to main content
Top expert badge
Recommended expert
Profile header background

Stefan S.-Interim Project Management PMO Manager

Stefan S. - Interim Project Management PMO Manager - profile avatar
Profile header overlay
Landesbergen, Germany

Check rate

Experience

Feb 2026 - Dec 2026

Interim COO

Moteg GmbH (POCLAIN)

Position summary
Interim COO at Moteg GmbH (POCLAIN)
Industries
Automotive
Construction
Business areas
Operations
Project Management
Quality Assurance
Strategy
Supply Chain Management

Interim COO

Revenue €5 million, 30 employees

Industry: e-mobility, commercial vehicles/construction machinery/public transport

  • Interim company management
  • Led the transformation process, including integration into the POCLAIN matrix organization
  • Introduced business standards and routines
  • Assessed and updated the QM system
  • Implemented statutory corporate requirements
  • Introduced weekly and monthly reviews
  • Optimized SCM and supply chains
  • Developed the company strategy and objectives
  • Introduced project management to visualize and manage projects
  • Implemented statutory ASU requirements following the BG audit
  • Created roadmaps for all departments

Results achieved:

Implemented planning and management methods. Successfully implemented the change management process. Introduced and implemented risk management and Hoshin Kanri to develop company objectives and implement defined measures. Created emergency plans for all processes and areas. Active stakeholder management

Feb 2026 - Dec 2026
Handewitt, Germany
On-site

COO

Moteg GmbH / Poclain Group

Position summary
COO at Moteg GmbH / Poclain Group
Industries
Automotive
Construction
Business areas
Operations
Project Management
Quality Assurance
Strategy
Supply Chain Management

Industry: e-mobility, commercial vehicles/construction machinery/public transport

Project focus:

  • Interim company management
  • Led the transformation process, including integration into the POCLAIN matrix organization
  • Introduced business standards and routines
  • Assessed and updated the QM system
  • Implemented statutory corporate requirements
  • Introduced weekly and monthly reviews
  • Optimized SCM and supply chains
  • Developed the company strategy and objectives
  • Introduced project management to visualize and manage projects
  • Implemented statutory ASU requirements following the BG audit
  • Created roadmaps for all departments Results achieved: Implemented planning and management methods. Successfully implemented the change management process. Introduced and implemented risk management and Hoshin Kanri to develop company objectives and implement defined measures. Created emergency plans for all processes and areas. Active stakeholder management
Apr 2025 - Feb 2026
Papenburg, Germany

Interim PMO Manager and Site Manager Rostock

ND Coatings GmbH (Meyer Werft Papaenburg)

Position summary
Interim PMO Manager and Site Manager Rostock at ND Coatings GmbH (Meyer Werft Papaenburg)
Industries
Manufacturing
Business areas
Operations
Procurement
Project Management
  • Revenue €90 million, 50 employees

  • Industry: shipbuilding, marina

  • Temporarily filled the PMO Manager position

  • Reviewed and validated PMO processes

  • Created capacity planning through 2032

  • Assessed standard preservation processes, including VSM and Marco Mapping

  • Created planning tools for project coordinators

  • Participated in coordination meetings with Meyer Werft

  • Provided data for the monthly review

  • Contributed to the contract award strategy for new ships

  • Created RACI charts and job descriptions for project managers and project coordinators

  • Project lead for the cruise ship Disney Adventure

  • Redesigned the reporting tool

  • Created a planning tool for project coordinators with a planning horizon through 2032

  • Designed an on-call service, including work instructions

  • Created pricing models for bids

  • Project lead for Disney Adventure

  • Took over site management at the Rostock location

  • Crisis management in Rostock due to schedule changes for several ships

Jan 2025 - Apr 2025

Mediator and Consultant for the Business Transfer

BDG GmbH – Bonduelle Deutschland

Position summary
Mediator and Consultant for the Business Transfer at BDG GmbH – Bonduelle Deutschland
Industries
Food and Beverage
Business areas
Human Resources
Project Management

Mediator and Consultant for the Business Transfer

Revenue €84 million, 400 employees

Industry: food industry, FMCG

  • Analyzed the staffing situation and prepared a reconciliation of interests plan
  • Created and tracked the project plan for the business transfer
  • Developed negotiation strategies
  • Supported negotiations with the works council
  • Prepared employee meetings
  • Mediated between BDG and the works council
  • Supported sales discussions with potential buyers holding the IFS-Food standard, while taking employees' interests into account

Results achieved:

Prepared and completed the successful business transfer without strikes or operational interruptions. Strictly followed the project plan, including reporting to management, through to the business transfer.

Jan 2024 - Mar 2025
Lübeck, Germany

Interim Site Manager ppa.

Elkem Silicones Germany GmbH

Position summary
Interim Site Manager ppa. at Elkem Silicones Germany GmbH
Industries
Chemical
Manufacturing
Pharmaceutical
Business areas
Human Resources
Operations
Production
Project Management
  • Revenue €90 million, 50 employees

  • Industry: pharmaceutical industry

  • Disciplinary management of the Lübeck site

  • Maintained site operations

  • Restructured all OPS processes along the VSM

  • Shop Floor Management

  • Reviewed and validated manufacturing processes and prepared for relocation

  • Maintained manufacturing processes in accordance with the relocation plan

  • Successfully led and concluded negotiations with the works council and trade union on the social plan and reconciliation of interests

  • Ongoing reporting to senior management

  • End-of-life production

  • Know-how transfer

  • Created and implemented a relocation plan

  • Prepared the announcement, including a communication plan and the necessary internal and external documents

  • Concluded negotiations with the works council and trade union two months ahead of schedule and 30% under budget

  • Continued site operations without loss of revenue

  • Closed the site, including relocating production to Italy and France

Jun 2023 - Jul 2023

Operations Screening

POLAR Cutting Technologies GmbH

Position summary
Operations Screening at POLAR Cutting Technologies GmbH
Industries
Manufacturing
Business areas
Audit
Operations
Procurement
Production
Supply Chain Management

Revenue €50 million, 265 employees

Industry: Special-purpose machinery – paper cutting machines

  • Analyzed operations processes across the value chain
  • Introduced a daily production meeting
  • Assessed current inventory levels and identified areas for improvement
  • Identified and created an action plan for process optimization, including a timeline
  • Engaged external contractors to reduce the backlog
  • Created a portfolio matrix to identify “Make or Buy” potential and developed a future layout to support the search for a new site
  • Conducted various audits focused on productivity and ASU
  • Optimized shortage management

Results achieved:

Completed a full analysis of all manufacturing processes in Operations. Coached the Operations Manager. Prepared a site assessment focused on Lean and ASU. Supported the Quality Management Officer with document management

Feb 2023 - Mar 2023

Company Screening

JENZ GmbH Maschinen- und Fahrzeugbau

Position summary
Company Screening at JENZ GmbH Maschinen- und Fahrzeugbau
Industries
Agriculture
Manufacturing
Business areas
Audit
Production

Revenue €20 million, 110 employees

Industry: Forestry – biomass processing

  • Analyzed development processes
  • Introduced engineering control loops
  • Assessed the value chain from goods receipt to shipping
  • Created a process optimization plan, including a timeline
  • Coached the management team
  • Prepared an optimization plan incorporating a 5-year growth forecast
  • Conducted various audits focused on productivity and ASU

Results achieved:

Completed a full analysis of all manufacturing processes. Analyzed the property in conjunction with the growth forecast. Conducted a safety audit and prepared a report on the identified deficiencies. Prepared an optimization report with a current-state and target-state comparison, including an investment estimate and timeline

Oct 2020 - Dec 2023

Interim General Manager

IMI Precision Engineering

Position summary
Interim General Manager at IMI Precision Engineering
Industries
Manufacturing
Business areas
Operations
Procurement
Production
Supply Chain Management

Revenue €46 million, 280 employees

Industry: Special-purpose machinery, hydraulic systems

  • Had full disciplinary responsibility for the plant in Fellbach
  • Reorganized site processes
  • Restructured all Operations processes based on the VSM
  • Introduced an SC matrix for master data maintenance in BaaN
  • Introduced a skills matrix and Standard Work
  • Restructured production control, including setting up a production control team
  • Created and introduced a purchasing KPI system to analyze demand variances
  • Optimized processes across the value chain
  • Reported regularly to the management team
  • Reorganized the plant’s staffing structure

Results achieved:

Created and implemented a restructuring plan for purchasing and optimized production planning, including an extended planning horizon. Introduced KPI systems, shop floor management, and meeting structures. Following the decision to relocate, closed the site, including the transfer of production to the Czech Republic. Took over as Head of Purchasing.

Jan 2020 - Sep 2020

Interim COO/CRO, temporary Plant Manager

mbw GmbH metallveredelung

Position summary
Interim COO/CRO, temporary Plant Manager at mbw GmbH metallveredelung
Industries
Manufacturing
Metals and Mining
Business areas
Human Resources
Logistics
Operations
Production
Supply Chain Management

Revenue €65 million, 700 employees

Industry: Electroplating, metal finishing

  • Coached the new Plant Manager
  • Restructured all plant processes
  • Optimized SCM
  • Introduced Hoshin Planning and TPM
  • Optimized production control and logistics
  • Created and introduced a KPI system to identify process disruptions
  • Identified optimization measures for each area
  • Reported to the management team
  • Reorganized the cost center structure
  • Optimized the plant layout and reorganized supply processes
  • Developed bonus and flexible working time models
  • Supported the definition of the new group-wide business areas

Results achieved:

Created and implemented a restructuring plan, negotiated with the works council and IG-Metall, created KPI systems for manufacturing processes, and introduced shop floor management and meeting structures.

Nov 2019 - May 2020

FMEA Specialist / Trainer

HENSOLDT Optronics GmbH

Position summary
FMEA Specialist / Trainer at HENSOLDT Optronics GmbH
Industries
Aerospace and Defense
Business areas
Quality Assurance

Revenue €1 billion, 4000 employees

Industry: Defense and Security Electronics, Optronics

  • Analyzed the FMEA status of the ongoing project
  • Reviewed and updated existing FMEAs
  • Created and implemented an action plan for reviews and training to meet customer milestones
  • Prepared and conducted customer reviews
  • Created FMEA training materials
  • Delivered training in d-/P-FMEA, moderation, and Train the Trainer
  • Facilitated D-/P-FMEAs
  • Restructured the control plan process
  • Integrated the FMEA process into the PEP

Results achieved:

Trained the current development team and other interested departments. Trained the quality departments to facilitate FMEAs going forward. Trained three company FMEA specialists in Train the Trainer. Implemented an end-to-end FMEA process, including integration into the PEP.

Jun 2019 - Dec 2019

Sen. OPS Manager

Transnorm System GmbH

Position summary
Sen. OPS Manager at Transnorm System GmbH
Industries
Manufacturing
Business areas
Logistics
Operations
Production
Quality Assurance

Revenue €62 million, 236 employees

Industry: Special-purpose machinery, conveyor systems, belt conveyors

  • Coaching the new OPS Manager
  • Developing and introducing an operational KPI system, including tracking
  • Interim management of departments
  • Optimizing production processes and supporting PreFab areas
  • Preparing, conducting, and following up on process and system audits
  • Introducing a commissioning process
  • Outsourcing project assignments to external service providers
  • Preparing reports for Honeywell VP OPS
  • Supporting the Honeywell integration team

Results achieved:

Supported and coached the new OPS Manager and created KPI systems for production, quality, and logistics. Developed and successfully introduced an order-tracking tool. Successfully reduced past-due orders by 135 within two months starting 8/19.

Nov 2018 - May 2019

International Quality Manager and SCM Developer

Transnorm System GmbH

Position summary
International Quality Manager and SCM Developer at Transnorm System GmbH
Industries
Manufacturing
Business areas
Quality Assurance
Supply Chain Management

Revenue €62 million, 236 employees

Industry: Special-purpose machinery

  • Planning and managing audits and certifications
  • Reviewing and monitoring supplier quality
  • Designing, implementing, and monitoring an 8D process, including reporting
  • Ensuring compliance with contractually agreed delivery quality
  • Coordinating and carrying out quality assurance
  • Supporting strategic quality planning
  • Preparing, conducting, and following up on process and system audits
  • Developing suppliers in Bosnia and Thailand
  • Handling complaints, 8D, and CAR
  • Coordinating continuous improvement measures with suppliers
  • Supporting the Honeywell integration team

Results achieved:

Introduced control mechanisms (CAR) to monitor design responsibility and the change process with suppliers. Actively developed suppliers in Bosnia and Thailand. Worked through LoP's. Introduced supplier management and an 8D process. Supported the ISO certification re-audit.

Apr 2018 - Nov 2018

Interim Plant Manager and Head of Task Force Quality

Ela Tech Rheinland Elastomere Technology GmbH

Position summary
Interim Plant Manager and Head of Task Force Quality at Ela Tech Rheinland Elastomere Technology GmbH
Industries
Automotive
Manufacturing
Business areas
Operations
Production
Quality Assurance

Revenue €120 million, 240 employees

Industry: Automotive - extrusion

  • Disciplinary management of the plant in Gelnhausen; restructured and optimized the quality organization
  • Created templates and an analysis tool to visualize process defects
  • Trained employees and end users to use the templates and tools
  • Set up a Q-Gate for BMW in South Caroline and Gelnhausen
  • Prepared for and supported customer audits due to escalation levels
  • Introduced KPI systems for OPS, quality, and 8D
  • Developed production planning and control tools
  • Prepared and led BMW escalation meetings

Results achieved:

Implemented defect documentation for BMW, including a corresponding analysis tool. Introduced change management for communication, including new meeting structures. Introduced Q circles, including PDCA. Achieved de-escalation with BMW. Introduced IATF 16949.

Nov 2017 - Mar 2018
Mexico

Sen. Quality Project Manager, Interim Plant Manager

SaarGummi Technologies S.à.r.l.

Position summary
Sen. Quality Project Manager, Interim Plant Manager at SaarGummi Technologies S.à.r.l.
Industries
Automotive
Manufacturing
Business areas
Operations
Production
Project Management
Quality Assurance

Revenue €280 million, 250 employees

Industry: Automotive - door seals

  • Restructured and optimized quality assurance at two plants
  • Created templates and an analysis tool to visualize process defects
  • Trained employees and end users to use the templates and tools
  • Developed quality processes for rollout across the entire group
  • Eliminated the goods filter used by VW at the plant in Puebla
  • Created inspection instructions for the internal Q-Gate in extrusion and finishing
  • Set up and trained a quality assurance organization
  • Took over production and quality management for Plant 1 from 06.02.2018

Results achieved:

Introduced inspection instructions for VW Tiguan and Jetta, including corresponding analysis tools. Implemented change management for communication, including new meeting structures. Introduced Q circles, including PDCA. Set up the quality organization. Took over interim management of Plant 1.

Jun 2017 - Nov 2017

CRO - Sen. Project Manager, interim SCM and OPS Manager

Phönix Armaturen Werke Bregel GmbH - Curtiss Wright

Position summary
CRO - Sen. Project Manager, interim SCM and OPS Manager at Phönix Armaturen Werke Bregel GmbH - Curtiss Wright
Industries
Manufacturing
Business areas
Operations
Procurement
Production
Project Management
Supply Chain Management

Revenue €180 million, 350 employees

Industry: Special-purpose machinery, valves and control valves

  • Led the Integration Management Team project to consolidate four European sites
  • Created and implemented the integration plan in MS-Project
  • Disciplinary management of purchasing, focusing on sourcing cast and forged parts
  • Developed an OPS strategy to define and implement core and non-core competencies
  • Introduced Lean methods to improve OTD and productivity and reduce lead time
  • Capacity planning and control, including forecasting
  • Daily order tracking for all customer orders
  • Coordinated relocation activities
  • Reported to HQ in the USA

Results achieved:

Created and successfully implemented the project management plan. Implemented measures to optimize production planning and increase productivity and OTD. Introduced a KPI system. Implemented the OPS strategy to outsource non-core competencies to LCC.

Apr 2017 - Jun 2017
Wuppertal, Germany

Interim Certification Manager

Delphi GmbH

Position summary
Interim Certification Manager at Delphi GmbH
Industries
Automotive
Business areas
Project Management

Revenue €1 billion, 750 employees

Industry: Automotive

  • Led the certification process for electric car chargers for OEMs Porsche, Audi and Bentley in 128 countries
  • Coordinated certification activities between certifier Intertek and Delphi
  • Created a certification plan
  • Reviewed certification tasks daily
  • Worked with and coordinated supporting plants and service providers to validate status
  • Scheduled test sample requests
  • Aligned on and reported certification status to OEMs
  • Contact person for questions about standards, codes and certification

Results achieved:

Reviewed and presented certification status after taking over the project, based on the contract award and timeline. Tracked the certifier due to a lack of support. Assessed risks to the test timeline for approval. Defined corrective actions and rescheduled to meet the SOP date

Sep 2016 - Mar 2017
Itzehoe, Germany

CRO - Interim Senior Project Manager and Operations Manager

Sterling SIHI GmbH

Position summary
CRO - Interim Senior Project Manager and Operations Manager at Sterling SIHI GmbH
Industries
Manufacturing
Business areas
Logistics
Operations
Production
Project Management

Revenue €250 million, 600 employees

Industry: Special-purpose machinery, vacuum pumps

  • Led the Integration Management Team after Flowserve acquired competitor SIHI
  • Line-managed Operations with 180 employees
  • Introduced Lean methods to improve OTD and productivity and shorten product lead time
  • Planned, managed and tracked customer orders and system projects, focusing on deadlines, costs and quality
  • Developed a logistics concept for outsourcing and launched the selection process
  • Developed transformation scenarios for the Managing Directors to change the business model, as a proposal for the Works Council
  • Created a project plan to integrate an external site, with a target date of Q.III 2018
  • Dissolved existing product lines (PLs) and integrated them into a matrix organization

Results achieved:

Reorganized the old SIHI company structure into the Flowserve matrix organization. Presented outsourcing scenarios and a new logistics concept to the Works Council and secured approval. Reorganized product line manufacturing processes to use cross-functional synergies and improve OEE.

Jul 2015 - Aug 2016
United States

CRO - Senior Project Manager, Integration Management

Flowserve Kooperation

Position summary
CRO - Senior Project Manager, Integration Management at Flowserve Kooperation
Industries
Manufacturing
Business areas
Production
Project Management

Revenue US$4.561 billion, 19,000 employees

Industry: Special-purpose machinery, high-performance pumps

  • Led the Integration Management Team after Flowserve acquired competitor SIHI
  • Created integration models
  • Created restructuring scenarios
  • Prepared decision documents for the US Board
  • Reported weekly to the management team in the USA
  • Provided local support to the Sending Site and After Market
  • Created a training plan to transfer know-how across all functions
  • Led the production transfer to Thailand, the USA and within Europe

Results achieved:

Created integration scenarios, drafted a social plan and an overall project plan covering seven Receiving Sites in MS Projekt. Ensured the transfer of know-how across all functions through training programs. Coordinated product and machine transfers to the Receiving Sites. Conducted and led various weekly integration calls between the Receiving Sites and the USA.

Dec 2014 - Jun 2015
Austria

Interim Senior Director Business Excellence and Director Global Quality Management

Tridonic GmbH & Co. KG

Position summary
Interim Senior Director Business Excellence and Director Global Quality Management at Tridonic GmbH & Co. KG
Industries
Manufacturing
Business areas
Operations
Production
Quality Assurance

Revenue €480 million, 950 employees

Industry: Electronics, LED lighting technology, SMD manufacturing

  • Line-managed the global quality department and the Lean SixSigma organization (82 employees)
  • Developed the Business Excellence strategy
  • Further developed the Excellence organization
  • Designed and restructured the global quality organization
  • Developed and implemented a complaint/claim process
  • Reorganized quality functions in consultation with stakeholders (OPS, Sales, Purchasing, R&D)
  • Recruited for newly established quality functions
  • Implemented the business strategy, including incorporating it into the global Master Mgt. Manual

Results achieved:

Built a global quality organization, including standardizing quality standards worldwide in the Master Management Manual. Introduced control plans in production.

Jul 2014 - Nov 2014
Germany

Interim Project Manager, Program Manager

ZF Lenksysteme NACAM GmbH

Position summary
Interim Project Manager, Program Manager at ZF Lenksysteme NACAM GmbH
Industries
Automotive
Manufacturing
Business areas
Product Development
Production
Project Management

Revenue €80 million, 240 employees

Industry: Automotive, steering systems

  • Took over two projects after the project manager left during the 0-series launch phase
  • Led the Audi MLBevo Q7 and A4 project teams
  • Further developed the product development and project management process
  • Main contact for Audi and other platforms (VW and Porsche)
  • Tracked development status and change management in Axalant
  • Prepared PAS, 0-series and SOP activities
  • Coordinated BMG, AE and testing with the customer
  • Monitored the integration of changes and material supply into the manufacturing process
  • Managed prototype production to support BMG and line-run vehicles, as well as internal tests
  • Took over project management for BMW Mini and led a task force on uneven steering column adjustment force.

Results achieved:

Recovered the 0-series launch schedule, including sample approval. Led eight task forces to meet the requirements in the specifications for vehicle safety and Thatcham. Led weekly escalation meetings at Audi board level.

Nov 2013 - Jun 2014
Germany

Interim Manufacturing Director

Flowserve Hamburg GmbH

Position summary
Interim Manufacturing Director at Flowserve Hamburg GmbH
Industries
Manufacturing
Business areas
Logistics
Operations
Production
Project Management
Supply Chain Management

Revenue €180 million, employees 265

Industry: Shipbuilding/thrusters, underwater and piston pumps

  • Disciplinary management of production operations, 150 employees
  • Management of the test bench and production control center
  • Analysis and optimization of manufacturing processes
  • Member of the management team
  • Restructuring of logistics
  • Development and implementation of a logistics concept for JIT material supply
  • Coaching managers
  • Development of an outsourcing concept
  • Reporting to headquarters in the USA
  • Inventory manager for 2013
  • Introduction of Kanban and barcodes
  • SCM optimization, cost reduction projects

Results achieved:

Successfully implemented a restructuring plan to increase productivity by 15%. Optimized the inventory process and reduced the inventory period from three weeks to 6 days, with an inventory variance of €8,800 on €65 million in stock. Project manager for setting up a conventional paint shop for deep-well pumps and thrusters as part of an energy efficiency upgrade.

Jul 2013 - Oct 2013
Germany

Senior Project Manager, Warranty Management

Recaro Aircraft Seating GmbH & Co. KG

Position summary
Senior Project Manager, Warranty Management at Recaro Aircraft Seating GmbH & Co. KG
Industries
Aerospace and Defense
Business areas
Customer Service
Project Management

Revenue €350 million, employees 800

Industry: Aerospace, aircraft seats

  • Analyzed and assessed existing warranty processes
  • Developed new workflows for Warranty Management
  • Introduced new process structures
  • Led the cross-functional project team
  • Implemented communication tools
  • Reorganized Warranty Management
  • Prepared PA, VA, AA and forms
  • Programmed reporting tools
  • Provided status reports at Executive Team Meetings / to management
  • Tracked and reported on team activities
  • Trained all employees involved in the process
  • Rolled out the process at the sites in the USA and China

Results achieved:

Successfully led a cross-functional team in jointly developing and then implementing the Warranty Management process. Reduced the lead time for warranty claims from an average of 327 days to 120 days.

Jan 2013 - Jun 2013
Germany

Senior Project Manager, Customer Service

Recaro Aircraft Seating GmbH & Co. KG

Position summary
Senior Project Manager, Customer Service at Recaro Aircraft Seating GmbH & Co. KG
Industries
Aerospace and Defense
Business areas
Customer Service
Project Management

Revenue €350 million, employees 800

Industry: Aerospace, aircraft seats

  • Analyzed and assessed the existing PM process
  • Introduced new PM process structures
  • Developed and implemented communication tools and escalation levels
  • Reorganized existing project management
  • Prepared PA, VA, AA and forms
  • Trained all Customer Service employees in PM
  • Managed projects in After Sales
  • Handled complaints
  • Implemented project management for modifications
  • Supported the selection of staff for future Managers Technical Support – conducted interviews
  • Trained the trainers for Go Live
  • Rolled out the process at the site in the USA

Results achieved:

Developed and implemented an eight-phase PM model. Successfully completed warranty claims within budget (project scope €2.4 million).

Jun 2012 - Dec 2012
Germany

CIP Manager, Project Lead

SGL Rotec GmbH & Co. KG

Position summary
CIP Manager, Project Lead at SGL Rotec GmbH & Co. KG
Industries
Energy
Manufacturing
Business areas
Operations
Production
Project Management
Quality Assurance

Revenue €200 million, employees 900

Industry: Renewable energy

  • Led the Nordex wind turbine project in Canada
  • Prepared action plans and tracked activities
  • Supported “Germanischer Lloyd” with rotor blade acceptance
  • Trained employees and ran workshops to optimize manufacturing processes for prefab parts
  • Handled quality issues / complaint management
  • Introduced Lean tools
  • Developed and implemented auxiliary tools and measuring tools for rotor blade manufacturing
  • Successfully introduced concepts for providing production equipment
  • Member of the management group

Results achieved:

Optimized manufacturing processes for all prefab parts, reducing production time from 35 h to a lead time of 17 h, for example by developing and introducing assembly aids and reorganizing assembly processes.

Apr 2008 - May 2012
Germany

Technical Managing Director ppa. (CTO/COO)

Eduard Mathai GmbH

Position summary
Technical Managing Director ppa. (CTO/COO) at Eduard Mathai GmbH
Industries
Cosmetics
Manufacturing
Business areas
Finance
Human Resources
Operations
Procurement
Production
Project Management
Quality Assurance
Supply Chain Management

Revenue €120 million, employees 900

Industry: Cosmetics

  • Introduced innovative manufacturing methods and production techniques
  • Led worldwide optimization initiatives
  • Relocated and outsourced unprofitable processes
  • Established and set up new sites in Colombia, Romania and Ukraine, including staff recruitment
  • Expanded all sites worldwide and achieved market leadership
  • Managed worldwide budgets and investment planning
  • Introduced Lean Management (5S, Kaizen, TPM, etc.)
  • Improved delivery quality
  • Led HR across the group
  • Carried out mass layoffs
  • Led global purchasing, including setting up SCM

Results achieved:

Established three new sites (Romania, Ukraine and Colombia). Improved fiber production by 300% and eliminated the need for a second shift. Optimized final assembly at all sites, achieving total savings of €6.2 million over the period of employment.

Oct 2007 - Mar 2008
United States

Head of Supplier Management

Recaro Aircraft Seating GmbH & Co. KG

Position summary
Head of Supplier Management at Recaro Aircraft Seating GmbH & Co. KG
Industries
Aerospace and Defense
Business areas
Procurement
Quality Assurance
Supply Chain Management

Revenue €320 million, employees 800

Industry: Aerospace

  • Designed and implemented supplier management
  • Introduced supplier evaluation
  • Conducted supplier audits
  • Set up risk management
  • Implemented roles, responsibilities and authority for sourcing
  • Defined interfaces for Purchasing
  • Trained auditors
  • Introduced a gate structure for supplier approval
  • Supported the launch of new suppliers
  • Tracked suppliers
  • Phased out suppliers
  • Prepared for LBA audits

Results achieved:

Developed and successfully introduced supplier management. Reduced the number of approved suppliers from 41,000 to 2,500. Conducted 48 supplier audits and supplier approvals worldwide.

Sep 2007 - Present
Landesbergen, Germany
On-site

Managing Partner

Unternehmensberatung Stefan Schotte GmbH

Position summary
Managing Partner at Unternehmensberatung Stefan Schotte GmbH
Industries
Professional Services

Founder and Managing Director

Nov 2006 - Sep 2007
Germany

Lean Manager, HOS Project Lead

Honeywell GmbH

Position summary
Lean Manager, HOS Project Lead at Honeywell GmbH
Industries
Manufacturing
Business areas
Operations
Procurement
Product Development
Production
Project Management
Supply Chain Management

Revenue €250 million, employees 450

Industry: Heating and air conditioning controls

  • Designed the HOS Lean project
  • Implemented HOS requirements at the site, including reporting to the Global HOS organization
  • Introduced Lean tools, including employee training
  • Conducted Kaizen workshops
  • Restructured the SMD production areas to improve manufacturing processes
  • Set up SCM and introduced global sourcing
  • Introduced supplier management, including an evaluation system
  • Took over and led product development projects
  • Participated in and completed Lean Expert training

Results achieved:

Restructured circuit board production. Reorganized manufacturing processes, including rebuilding the SMD production lines across two floors. Increased OTTR to 93% and productivity by 8%. Introduced a consignment warehouse and reduced inventory by €1.08 million.

Jun 2006 - Oct 2006
Hungary

Quality Manager, Head of Quality Assurance

Schefenacker Engelmann Spiegel GmbH

Position summary
Quality Manager, Head of Quality Assurance at Schefenacker Engelmann Spiegel GmbH
Industries
Automotive
Manufacturing
Business areas
Operations
Production
Project Management
Quality Assurance

Revenue €120 million, employees 350

Industry: Automotive, plastic injection molding, hydro painting

  • Managed the quality department at both German sites (34 employees)
  • Monitored restructuring measures
  • Reduced the defect rate for painted VW A-parts (mirror caps, fuel filler flaps) to as low as 28 PPM
  • Ensured JIS for Auto5000 after the takeover
  • Phased out conventional painting production
  • Relocated production to Hungary
  • Reduced complaint costs
  • Participated in Meisterbock and Cubing discussions at VW in Emden and Wolfsburg
  • Managed external rework companies
  • Led turnaround projects

Results achieved:

Developed a 25-point optimization plan to secure the site. Implemented crisis management to maintain on-time delivery and prevent production line stoppages at Opel and VW.

Oct 2005 - May 2006
Hattorf am Harz, Germany

Plant Manager in Hattorf

Engelmann Automotive GmbH i. I.

Position summary
Plant Manager in Hattorf at Engelmann Automotive GmbH i. I.
Industries
Automotive
Manufacturing
Business areas
Operations
Procurement
Production
Quality Assurance
Supply Chain Management

Revenue €160 million, employees 450

Industry: Automotive, plastic injection molding, hydro painting

  • Managed the plant and 135 employees
  • Reported directly to the Managing Directors in Wedemark (Germany)
  • Supported comprehensive restructuring and turnaround measures at the site
  • Maintained delivery capability while reducing staff by 30%
  • Improved the FROK rate in hydro painting
  • Managed the crisis with VW and GM after taking over Schefenacker GmbH during the BQG period
  • Carried out major staff reductions
  • Made make-or-buy decisions
  • Headed plastic injection molding (temporarily)
  • Planned capacity for injection molding machines up to 600 to.
  • Prepared for production phase-out
  • Coordinated external rework with service providers and JVAs

Results achieved:

Increased the FROK rate from 54% to 82%. Maintained on-time JIS delivery for the VW Touran despite staff reductions and the company takeover.

Nov 2004 - Sep 2005
Brazil

Head of Quality, Lean Manager, LEO Project Lead

Engelmann Automotive GmbH

Position summary
Head of Quality, Lean Manager, LEO Project Lead at Engelmann Automotive GmbH
Industries
Automotive
Manufacturing
Business areas
Operations
Production
Project Management
Quality Assurance

Revenue €240 million, 1000 employees

Industry: Automotive, plastic injection molding, conventional painting

  • Disciplinary management of the quality department across three sites (47 employees)
  • Designed the LEO Lean project, Six Sigma
  • Introduced Lean tools, including employee training
  • Introduced and led pilot projects (Kanban, One Piece Flow)
  • Optimized production processes
  • Root cause analysis using SHAININ
  • 8D reporting, complaint management
  • Restructured manufacturing processes
  • Crisis management
  • Supplier tracking
  • Quality Manager for Ford Group, responsible for maintaining Q1 certification

Results achieved:

Successfully introduced Kanban in the mirror assembly line for the Opel Astra. Increased output from 725 to 1085 mirrors per day. Reduced the PPM rate from 6500 to 5 PPM at VW.

Jan 2003 - Oct 2004
Isernhagen, Germany

Quality Manager / Continuous Improvement Project Lead

IserHäger GmbH

Position summary
Quality Manager / Continuous Improvement Project Lead at IserHäger GmbH
Industries
Food and Beverage
Manufacturing
Business areas
Production
Project Management
Quality Assurance

Revenue €34 million, 20 employees

Industry: Food industry

  • Introduced the EN ISO 9001:2000 quality management system
  • Recorded and documented all business processes for ISO certification
  • Created process, procedure, and work instructions in line with IFS-Food standards
  • Prepared machine documentation and pigging systems, maintenance plans, and CE declarations
  • Developed and introduced project management for the sales team to design dough production lines
  • Improved training programs for bakeries
  • Prepared and ran workshops to optimize processes and increase revenue

Results achieved:

Developed and successfully introduced a project planning tool for the sales team. Created a quality management manual and prepared documentation for ISO certification. Supported the ISO 9001-2003 certification. Optimized dough production line manufacturing processes to improve competitiveness.

Jul 2001 - Dec 2002
Stadthagen, Germany

Lean Manager, ACE Project Lead

Otis Escalator GmbH

Position summary
Lean Manager, ACE Project Lead at Otis Escalator GmbH
Industries
Manufacturing
Business areas
Customer Service
Operations
Procurement
Production
Project Management
Quality Assurance
Sales

Revenue €180 million, 950 employees

Industry: Escalators / steel construction

  • Integrated ACE into the existing quality management system
  • Audited Kaizen activities
  • Optimized processes in purchasing, sales, production planning, specifications, and engineering
  • Introduced GidA in cooperation with AOK
  • Extensively restructured manufacturing processes

Results achieved:

Successfully led the project as ACE Coordinator to optimize processes across the entire plant. Achieved annual cost avoidance of $1.6 million through improvements.

Dec 1999 - Jun 2001
Berlin, Germany

Head of Quality Assurance, Escalators Germany

Otis GmbH & Co. OHG

Position summary
Head of Quality Assurance, Escalators Germany at Otis GmbH & Co. OHG
Industries
Construction
Manufacturing
Business areas
Product Development
Quality Assurance

Revenue €120 million, 260 employees

Industry: Elevators / steel construction

  • Set up a quality management system for escalators and elevators
  • Conducted service and new installation audits
  • Developed a service evaluation system
  • Optimized products with the plants to develop repair packages
  • Led and monitored prototype fleets
  • Conducted safety audits

Results achieved:

Developed and successfully implemented an audit system for escalators and elevators in Germany. Developed Q-Infos to improve service processes.

Jul 1998 - Nov 1999

Head of Task Force Europe

Otis Escalator GmbH

Position summary
Head of Task Force Europe at Otis Escalator GmbH
Industries
Construction
Manufacturing
Business areas
Customer Service
Product Development
Project Management

Revenue €850 million, 3500 employees

Industry: Escalators / steel construction

  • Managed schedules and crises at customer sites
  • Led installation work across Europe
  • Continuously improved replacement kits
  • Further developed EMC prevention measures
  • Coordinated eight Task Force teams working across Europe

Results achieved:

Successfully resolved EMC issues on transit escalators and ensured timely resource and deployment planning for Task Force teams in Europe.

Jun 1996 - Jun 1998
Stadthagen, Germany

Development Project Manager, Focus: Electrical Engineering

Otis Escalator GmbH

Position summary
Development Project Manager, Focus: Electrical Engineering at Otis Escalator GmbH
Industries
Construction
Manufacturing
Business areas
Procurement
Product Development
Production
Project Management
Quality Assurance

Industry: Escalators / Steel Construction

  • Designed escalator control systems for the North American market
  • Identified suppliers for UL/CSA-approved components
  • Created engineering drawings using ProEng
  • Checked code compliance with NEC /CEC /JIS
  • Developed and manufactured prototypes
  • Managed projects through UL/CSA certification
  • Supported certifications in the USA and Canada

Results achieved:

Developed the electrical equipment for three escalator types for the North American market and successfully obtained UL and CSA approval in the USA and Canada

Industry experience

See where this freelancer has spent most of their professional time.

Experienced in Manufacturing, Professional Services, Construction, Automotive, Cosmetics, and Food and Beverage.

Manufacturing
Professional Services
Construction
Automotive
Cosmetics
Food and Beverage
Profile match chart

Business area experience

See which departments and functions this freelancer has contributed to most.

Experienced in Production, Project Management, Operations, Quality Assurance, Procurement, and Supply Chain Management.

Production
Project Management
Operations
Quality Assurance
Procurement
Supply Chain Management
Profile match chart

Summary

Internationally experienced interim manager and consultant with many years of leadership experience and extensive expertise in project and transformation management. Results-driven practitioner with a strong hands-on approach, decisive leadership, and excellent interpersonal skills. Proven success in leading complex integration, relocation, and restructuring processes.

Skills

  • Project Management Up To €200 Million
  • Transformation, Restructuring, Relocation, Site Closure, Greenfield
  • Lean Management/Tps (5s, Tpm, Sr, Pdca, Kanban, Etc.)
  • Sixsigma (Dmaic, Shainin), Dfss, Scrum
  • International Project Management
  • Scm
  • Qm/Qa / Prototype Construction
  • Risk Management

Industry Experience:

  • Automotive And Commercial Vehicles (First & Second Tier Supplier)
  • Electrical And Electronics Industry, Smd, Lithography
  • Special-Purpose Machine Manufacturing – Various Industries And Product Types
  • Steel Construction, Scaffolding And Tank Construction, Special Vehicle Manufacturing
  • Conveying Technology For People, Goods, And Liquids
  • Switchgear Manufacturing For Low- And High-Voltage Systems
  • Renewable Energy Rotor Blade Manufacturing Up To 58.5m Offshore
  • Aerospace Engineering
  • Plastic Injection Molding With Conventional And Hydro Painting, Extrusion Of Rubber Components (Door Seals, Etc.)
  • Heating And Air Conditioning Technology
  • Cosmetics Industry And Healthcare
  • Food Industry, Fermentation, Vegetables
  • Side-Channel, Segmented, Submersible, And Piston Pumps
  • Shipbuilding / Thruster Manufacturing, Preservation, Insulation
  • Liquid Ring And Dry Vacuum Pumps
  • Certification Of Electronic And Electrical Components
  • Industrial Valves And Dampers Up To Dn 600 And Pn 630
  • Defence, Optical Surveillance On Land/Sea/Air
  • Chemicals, Electroplating
  • Biomass Processing And Production
  • Pharmaceutical Industry, Medical Technology
  • E-Mobility

It Skills

  • As400
  • Sap R3
  • Cm
  • Baan
  • Oracle
  • Axalant
  • Proalpha
  • Pro Eng
  • Eplan
  • Cocreate
  • Autocad
  • Classics
  • Ms Navision
  • Windows 365
  • Ms Office 2019
  • Minitab
  • Ms Visio
  • Ms Project
  • Copilot
  • Chat Gpt
  • Metasfresch
  • Ms Office 2021
  • Ai Tools

Languages

German
Native
English
Advanced

Education

Sep 1988 - Feb 1993

TH Hannover

state-certified · Commercial and technical training in electrical and mechanical engineering

Certifications & licenses

Lean Expert

Project Management

Project Manager

Quality Manager

Statistics

Experience

Total positions 36
Experience in Manufacturing 28 y
Avg length 1 y 4 m
Longest experience 19 y 2 m

Global experience

Countries worked in 6 (Germany, United States, Mexico, Austria, Hungary, +1)
Primary country Germany

Expertise

Recent roles Interim COO, COO, Interim PMO Manager and Site Manager Rostock
Main industries Manufacturing, Professional Services, Construction
Main business areas Production, Project Management, Operations

Qualifications

Certifications earned 7
Member since
Last update
Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions

Frequently asked questions

Have questions? Find more information here.

Stefan is based in Landesbergen, Germany and can operate in on-site, hybrid, and remote work models.

Stefan speaks the following languages: German (Native), English (Advanced).

Stefan has at least 30 years of experience. During this time, Stefan has worked in at least 36 different roles and for 31 different companies. The average length of individual experience is 1 year and 10 months. Note that Stefan may not have shared all experience and actually has more experience.

Based on recent experience, Stefan would be well-suited for roles such as: Interim COO, COO, Interim PMO Manager and Site Manager Rostock.

Stefan's most recent position is Interim COO at Moteg GmbH (POCLAIN).

In recent years, Stefan has worked for Moteg GmbH (POCLAIN), Moteg GmbH / Poclain Group, ND Coatings GmbH (Meyer Werft Papaenburg), BDG GmbH – Bonduelle Deutschland, and Elkem Silicones Germany GmbH.

Stefan is most experienced in industries like Manufacturing, Professional Services, and Construction. Stefan also has some experience in Automotive, Cosmetics, and Food and Beverage.

Stefan is most experienced in business areas like Production, Project Management, and Operations. Stefan also has some experience in Quality Assurance, Procurement, and Supply Chain Management.

Stefan has recently worked in industries like Professional Services, Manufacturing, and Chemical.

Stefan has recently worked in business areas like Operations, Production, and Procurement.

Stefan attended TH Hannover for Commercial and technical training in electrical and mechanical engineering.

Stefan has 7 certificates. Among them, these include: Master Black Belt, Lean Expert, and Black Belt.

Stefan will be available full-time from November 2026.

Daily rate distribution

0% 25% 50% 75% 100%
10% of experts charge less than €640 per day.
40% of experts charge between €640 and €800 per day.
20% of experts charge between €800 and €960 per day.
10% of experts charge between €1280 and €1440 per day.
20% of experts charge €1440 or more per day.
<€640 €640-​800 €800-​960 €1280-​1440 €1440+

The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.

Average rates for similar positions

Rates are based on recent contracts and do not include FRATCH margin.

1000
750
500
250
Rate comparison chart
Daily rate avg. 943 €

The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.

1000
750
500
250
Rate comparison chart
Median rate 792 €

The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.

Calculated based on our freelancers’ daily rates as of 7 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.