Muharrem (Gökhan) Saglam
Technical Project Lead (Porsche Project)
Experience
General Manager
REPSEM/ REPKON-Energetic (Mechanical Engineering)
REPSEM/ REPKON-Energetic (Mechanical Engineering) – General Manager Start-up company. Set up the company and its structure. Created processes, document templates, planned workflows, and hired staff to meet company goals. Trained employees and introduced them to the first company project. Acquired projects, held meetings about projects with companies. Expanded company goals and strategy. Visited companies for cooperation opportunities. Led the first company project together with the project manager.
Technical Project Lead (Porsche Project)
Brusa
- Technical leadership, planning, and control of a control unit for inductive vehicle charging.
- Tracking and following up on technical and schedule matters for hardware, mechanics, and software.
- Coordinating approvals of prototype cycles and coordination with production and purchasing in China.
- Driving hardware bring-up topics and hardware/software analysis and repair of prototypes.
- Coordinating with customers and reporting.
- Coordination and communication with internal and external stakeholders.
- Tools: MS Office
Project lead for ASpice implementation (BMW Project)
Harman
- Leading and advising on ASpice processes in the project.
- Gap analysis, coordinating and leading the process team and planning process catch-up across the project.
- Central ASpice contact.
- Actively supporting process owners and the development team in defining strategy in the process areas and rolling out the processes.
- Preparing the team for the ASpice assessment.
- Tools: MS Office, Confluence, Jira
Project management (Porsche Project, Audi Project)
Marquardt
- Planning, leading, and controlling software project management for the BMS (Battery Management System) Porsche PA992.
- Creating and maintaining metrics.
- Coordination with stakeholders.
- Support in planning and controlling BMS (Battery Management System) for the Audi MLBW project.
- Aligning and planning work packages for software milestones.
- Creating and maintaining metrics.
- Coordination with stakeholders.
- Tools: MS Office
Project & Process Management (BMW Project)
Hella
- Planning, leading, and controlling software project management for the BMS (Battery Management System).
- Creating and maintaining metrics.
- Coordination with stakeholders.
- Guiding the team in processes.
- Supporting, improving, creating, and describing the MAN.3, SWE.1, SWE.2, SWE.3, SWE.4 processes according to ASpice requirements.
- Preparing the team for the ASpice assessment.
- Tools: MS Office, Integrity, MS Project
Process Management (VW Group Projects)
ZF
- Supported project managers and provided general assistance.
- Created and documented the ASpice MAN.3.
- Developed and implemented processes in the company divisions.
- Assisted with metrics and requirements management.
- Tools: MS-Office, Integrity
Project Management Support (AUDI, BMW, Daimler Projects)
Flex
- Supported project managers in the DC/DC division with project management and processes (ASpice MAN.3).
- Analyzed OEM specifications for DC/DC projects and generated features and feature rollout plans.
- Provided general support, created and documented processes in project planning, tracking, reporting, and requirements management.
- Prepared the team for ASpice assessment.
- Tools: MS-Office, Siemens Polarion, MS-Project
SW Project Lead, Process Manager (Daimler Project)
Nippon-Seiki
- Planned, reported, and controlled software project for comfort electronics.
- Led software development for the HUD of the Daimler E-Class.
- Created, advised, improved, and expanded project and company processes (ASpice).
- Took over the project at the start with missing KPIs and processes.
- Addressed a general lack of understanding of certain processes and workflows in automotive.
- Coached team leads and some managers to improve understanding of certain topics.
- Improved the processes.
- Gained Daimler's trust.
- Processes from this project were used as a model and rolled out to other projects.
- Tools: MS-Office, Confluence, Jira
Team Lead, SW Project Lead (DENSO)
PINTeam GmbH
- Led the team, planned and managed software projects for pre-development of next-generation ECUs (high-performance computing machines).
- Developed platform software using AUTOSAR, Adaptive AUTOSAR, hypervisor, gateway, and remote update technologies.
- Introduced and established agile processes.
- Managed suppliers.
- Took over a project with no progress after more than a year.
- Structured topic areas and assigned teams.
- Developed processes and approaches for the project.
- Gained DENSO's trust and successfully completed the project.
- Tools: MS-Office, Confluence, Jira
Project Lead (BMW & Daimler projects)
PINTeam GmbH
- Planned and managed software projects for comfort electronics.
- Led software development for the lumbar support of the Daimler S-Class.
- Led software development for the BMW seatbelt tensioner.
- Managed overseas teams and suppliers (India and Romania).
- Tools: MS-Office, Lotus-Notes
Program Management (BMW & Daimler Pro.)
Kongsberg Automotive
- Planning and managing electronics projects, comfort electronics, and control unit development.
- Modular multi-project management and cost-down measures for seat control units.
- Tools: MS-Project, MS-Office
Team Lead Project Management (Audi Subsidiary)
TKI Automotive
- Leading and managing corporate projects with a team of project managers.
- Project management and establishing project management processes (ASPICE) across the company.
- Took over the company's largest project in a crisis.
- Regained Audi's trust.
- Closed long-standing unresolved issues.
- Structured and made the project measurable.
- Tools: MS-Project, MS-Office, Visio, Integrity
Project Manager (Audi Subsidiary)
TKI Automotive
- Leading and managing the software platform for the vehicle climate control project for Audi and VW Group into one integrated control unit.
- Project management and introduction of project management processes (ASPICE) for the entire company.
- Tools: MS-Project, MS-Office, Visio, Integrity
Project Manager (BMW Project)
U-Shin GmbH
- Took over a crisis project as Task Force Manager.
- Solved project issues step by step in cooperation with BMW stakeholders.
- Planned, coordinated, and managed the entire project (Development Lead for BMW project).
- Identified gaps and developed measures.
- Recruited qualified developers and staff.
- Researched qualified suppliers.
- Implemented processes (ASPICE).
- Software project management.
- Tools: BMW Tools, MS-Project, MS-Office, Redmine
Test Manager (BMW Project)
U-Shin GmbH
- Planned tests, developed and implemented the test strategy, processes, and process documents (ASPICE).
- Created metrics for requirements, test specifications, and problem tickets.
- Also acted as Problem Manager.
- Tools: BMW Tools, MS-Project, MS-Office, Redmine
Test Manager
Giesecke & Devrient
- Development of the test strategy, processes, and process documents.
- Creation of FAT and SAT documents.
- Functional testing and integration testing of application software.
SE Team Leader (Project Manager)
BMW AG
- Responsible for the power electronics component for e-drive and hybrid vehicles.
- Project management (budget, resource and schedule planning), team leadership, technical leadership (hardware, software, mechanics, and verification).
- Planning, design, organization, process implementation and supplier management.
- Reporting to management.
- Task Force SE Team Lead role to solve complex project issues.
- Collaboration with BMW senior management in the Task Force and committees.
- Tools: BMW tools, HP Quality Center, MS Office
Test Manager
BMW AG
- Test Manager for the power electronics component for e-drive and hybrid vehicles.
- Planning and organizing tests for multiple vehicle derivatives.
- Analysis and creation of release recommendations.
- Creation of document and process templates.
- Expansion of test depth.
- Tools: BMW tools, HP Quality Center, MS Office
Test Engineer and Test Manager
Webasto AG
- Development and rollout of a test strategy to achieve the VW assessment.
- Process optimization and analysis of workflows in collaboration with teams.
- Successful completion of the Volkswagen assessment.
- Execution of functional tests, prototype tests, and creation of system test specifications.
- Projects:
- Project 1: Functional test for the Renault Wind convertible. Functional tests, prototype tests, extend system test specification, extend test setup.
- Project 2: Functional test for the VW Group sunroof. Functional tests, prototype tests, extend system test specification, create test setup.
- Project 3: Functional test for the VW Beetle convertible. Create test plan, functional tests, prototype tests, create system test specification, create test setup.
- Project 4: Create test strategy for Webasto testing as a template for all projects. Define workflows conforming to ASpice and ISO26262.
- Project 5: Functional test for the base auxiliary heater unit. Expand test plan, functional tests, expand system test specification.
- Project 6: Functional test for the BMW auxiliary heater. Create test plan, create test strategy, create system test specification.
- Tools: Caliber, CANoe (CAN and LIN bus), Webasto tools.
Project Manager / Embedded Developer
Age-Engineering
- Software and hardware renewal in the HYDRA project on behalf of ESA (European Space Agency).
- Adaptation and update of the control software to Windows XP.
- Driver and DLL programming for the VME card.
- Renewal and adaptation of the control computer.
- Final implementation and on-site testing at ESA in the Netherlands.
- Programming languages: C, Visual Basic 6.0, VB.NET.
- Operating systems: Windows XP, Windows 95.
Software Engineer
Helbling Technik
- Project 1: Development of the EMF (electrical parking brake) for BMW. Embedded programming, system testing, system integration, and software testing. Creation of a degradation concept.
- Project 2: Extension of an electric chainsaw control system. Implementation of calculated support points for an optimal torque curve. Parameterization via RS232.
- Know-how: CAN application layer, network management, message manager.
- Tools: BMW Toolchain, CodeWarrior IDE, HIWAVE Debugger, CANoe, GENy, AVR Studio.
- Programming languages: C.
- Hardware: Freescale S12X, Atmel ATmega168.
- Operating system: Windows XP.
Thesis Student
BMW Research
- Thesis topic: Image interpretation of MMI displays and test automation.
- Created filters and functions in C/C++ as DLLs for image processing and recognition.
- Developed an overall concept for test automation.
- Programmed the image interpretation logic in Python and XML.
- Tools: Visual Studio .NET, Python editor.
- Programming languages: C/C++, Python, XML.
- Operating system: Windows XP.
Presenter
Reutlingen University
- Presentation on mobile communication (GSM, UMTS, GPRS, antenna technologies, radio wave propagation).
Embedded Developer
Gigatronik
- Project 1: Module development with a PIC18F microcontroller. The module intercepts CAN messages and performs algebraic calculations for PWM signal output.
- Project 2: Module development for sporadic sending of preconfigured CAN messages onto the vehicle bus.
- Tools: MPLAB IDE, CANoe.
- Programming languages: C.
- Hardware: Microchip PIC18F microcontroller.
- Operating system: Windows XP.
Software Engineer
Tryptis GmbH
- Project 1: Design and development of a knowledge base with GUI for internal knowledge sharing.
- Project 2: Company website for Tryptis and development of a content management system.
- Project 3: FirstOSD, a GUI under DOS 6.0 for configuring INI files for network installations.
- Tools: Borland Turbo C 2.01.
- Programming languages: PHP, MSSQL, JavaScript, HTML, Turbo C.
- Operating system: Windows XP.
Software Developer
Age-Engineering
- Reengineering of a crash test facility control program (VW).
- Analysis of Fortran code, parameters and physical formulas.
- Plausibility check of the formulas and code.
- Programming languages: Fortran.
- Operating system: Windows XP.
Software Engineer
Dornier-Consulting
- Project 1: Creating Java classes for a parser tool for GPS log data from toll OBU devices.
- Project 2: Designing and creating a visual tool in C++ to parse PDU and GSM information.
- Project 3: Designing and creating a test management system to manage and evaluate tests.
- Project 4: Designing and creating a test rack for toll OBUs including interface programming and GUI.
- Programming languages: Java, C++, PHP, SQL, JavaScript, HTML, Shell Script.
- Operating systems: Windows XP, Linux.
Product Support Assistant, Software Developer
Etas GmbH
- Working on automotive control units: error analysis, research, and resolution.
- Creating test cases and extending automated tests.
- Supporting LabCar projects and HIL system configuration.
- Tools: LabCar, ASCED-SD, TestStand (National Instruments).
- Programming languages: VB.
- Hardware: various signal cards from ETAS, HIL systems.
- Operating system: Windows 2000.
Research Associate
Max Planck Institute Biological Cybernetics
- 3D animation using 3D Studio Max.
- Tools: 3D Studio Max.
- Operating system: Windows XP.
Software Developer
Fraunhofer Institut - Systeme der Kommunikationstechnik
- Designing and developing a graphical user interface to control services via SLP.
- Setting up the connection via Bluetooth.
- Adapting and integrating the Bluetooth stack and the SLP protocol.
- Programming languages: C and the GTK library.
- Hardware: Compaq Pocket PC iPAQ.
- Operating systems: SUSE Linux and ARM Linux.
Software Developer
BBDO-Interone
- Web programming on BMW websites and content management to maintain the sites.
- Programming languages: JavaScript, HTML.
- Operating system: Windows 2000.
Software Developer
Age-Engineering
- Testing and optimizing the 6x8 Cholesky algorithm on a DSP TMS 320C6701.
- The HYDRA project (vibration tester for satellites) for the ESA.
- Support for satellite tests in Noordwijk, Netherlands.
- Programming languages: C, assembly.
- Hardware: Texas Instruments DSP TMS 320C6701.
- Operating system: Windows XP.
IT technical support for the agency
Tulay & Kollegen
- Network maintenance.
- Support and consulting for IT infrastructure hardware and software.
Project Manager / Software Developer
4factory.de
- Various web projects: web programming in HTML, PHP, SQL, JavaScript.
- Design and development of content management systems.
- Programming languages: PHP, MySQL, JavaScript, HTML.
- Operating system: Windows XP.
Software Developer
Popnet AG
- Web programming on BMW and Premiere websites.
- Content management to maintain the sites.
- Programming languages: JavaScript, HTML.
- Operating system: Windows 2000.
Machine Setter and Operator
Epcos AG
- Operate and adjust SMD machines for surface acoustic wave filters.
- Tasks: die bonding, wire bonding, welding & tacking.
Industry Experience
See where this freelancer has spent most of their professional time.
Experienced in Automotive, Information Technology, Manufacturing, Professional Services, Space Exploration, and Media and Entertainment.
Business Area Experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Product Development, Quality Assurance, Information Technology, Production, and Supply Chain Management.
Summary
In recent years, I have faced critical projects where I had to help bring the project to a better state. I had to find fast solutions under demanding conditions. I started by analyzing the current situation, making the project measurable, deriving actions, defining processes and approaches, restructuring the team and the organization, and following up on these new processes and structures with the team. I can quickly get an overview and simplify complex environments and structures. Where others give up after a short time, I pursue goals with passion and persistence. My experience from earlier roles as a software developer, tester, test manager, process manager, and project manager has been the foundation for successfully meeting challenges and making good decisions. My approach and presence are highly appreciated by my clients and customers.
Skills
Activity Keywords:
- Management
- Task Force Management
- Project Management
- Team Leadership
- Project Lead
- Test Management
- Process Management
- Coaching
- Aspice Provisional Assessor
- Sqil
General Technical Knowledge And Skills:
- Project Management, Technical Project Leadership
- Team Leadership, Team Management
- Requirements Management, Concept Development
- Process Management (Aspice Provisional Assessor, Sqil, Agile…)
- Very Broad It Knowledge
- Electrical Engineering Knowledge
- Knowledge In Automotive And Vehicle Development Process (Bus Systems, Diagnostics, Driver Assistance Systems, Autosar)
Personal Skills:
- Expert In Distressed Projects
- Fast Learner
- Highly Motivated
- Methodical And Process-oriented Approach
- Independent Thinking And Action
- Broad Technical Knowledge And Skill
- Strong Ability To Solve Technical Problems
- Conscientious Working
- Team Leadership And Team Spirit
Knowledge:
- Processes: Aspice Certificate & Sqil (Software Quality Improvement Leader)
- Programming Languages: C/c++, Php, Python, Java, Html, Vb, Vc++, Javascript, Qt, Gtk, .Net, Capl Programming…
- Database Knowledge: Sql, Db2
- Hardware Knowledge: Very Good Pc Hardware Knowledge
- Operating Systems: Entire Windows Family, Linux
- Network Knowledge: Good Network Skills
- Software Tools: Canoe, Canalyzer, Software Development Tools, Labcar (Asced), Matlab/simulink, Ms Office
- Requirement Tools: Mt Doors, Caliber, Polarion, Ptc-integrity/mks
- Planning And Others: Ms Project, Confluence, Jira
Additional Qualifications:
- Project Management: I Acquired Project Management Knowledge During My Work As A Freelancer And As An Employee In Demanding Projects. I Deepened My Experience And Skills In Project Coordination, Concept Development, And Technical Concept Planning. I Also Gained Advanced Process Knowledge And Improved Company Processes.
- Team Leadership Skills: In 2000, I Successfully Coached A Men's Soccer Team For Two Years. My Leadership Style And Training Methods Were Very Well Received, Which Increased The Number Of Players Wanting To Join My Team. In This Role, I Learned Skills In Rhetoric, Psychology, And Pedagogy.
Languages
Education
Reutlingen University of Applied Sciences
Diploma in Electronics/Communication Engineering · Electronics/Communication Engineering · Reutlingen, Germany · 2.4
Munich University of Applied Sciences
Electrical Engineering · Munich, Germany
Certifications & licenses
SQIL certificate
Volkswagen Group Academy
ASpice Certification
Statistics
Experience
Global Experience
Expertise
Qualifications
Profile
Frequently asked questions
Do you have questions? Here you can find further information.
Where is Muharrem based?
What languages does Muharrem speak?
How many years of experience does Muharrem have?
What roles would Muharrem be best suited for?
What is Muharrem's latest experience?
What companies has Muharrem worked for in recent years?
Which industries is Muharrem most experienced in?
Which business areas is Muharrem most experienced in?
Which industries has Muharrem worked in recently?
Which business areas has Muharrem worked in recently?
What is Muharrem's education?
Does Muharrem have any certificates?
What is the availability of Muharrem?
What is the rate of Muharrem?
How to hire Muharrem?
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
Similar Freelancers
Discover other experts with similar qualifications and experience
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a General Manager
Nearby freelancers
Professionals working in or nearby Munich, Germany