Experience
Service Contact Person (Single Point of Contact)
waveIT GmbH
- Supports ICT project and program management across all project phases in a life sciences major project (volume approx. €3.5 billion).
- Supporting technical design.
- Managing RFI and change control processes.
- Continuous coordination of installation teams during construction and integration.
- Quality assurance of ICT systems.
- Evaluation of external planning documents and identification of optimization potentials.
- Coordinating with stakeholders to ensure Acceptance for Construction (AFC).
Program Manager / Process Manager / Interim Manager / Partner & Exit Manager / Home Connection Manager / Product Owner
Unsere Grüne Glasfaser
- Analysis, optimization, and further development of existing business processes, as well as management of complex project and program structures.
- Gathering, structuring, and prioritizing technical requirements, coordinating with stakeholders, and ensuring consistent implementations.
- Managing multiple concurrent projects, streams, and work packages, including program status reporting and risk management.
- Development and implementation of standardized processes for using systems like ServiceNow, Doma, Loma, QGis, KeyCom, Office365, and OpenProject.
- Conducting training for internal and external colleagues, and organizing cluster meetings.
- Technical and disciplinary leadership of the Regional Deployment and Quality Management departments during staffing shortages.
- Restructuring deployment services to optimize performance management, transparency, and acceptance capability.
- Management and coordination in escalation, crisis, and claims management as SPoC for partners and construction companies.
- Responsible for the partner lifecycle process, contract change and exit management, onboarding/offboarding.
- Single point of contact for timely and high-quality execution of active RFS connections (~15,000 connections).
- Product owner for ServiceNow (ITSM) in construction: backlog maintenance, UAT, reporting, release planning, and UX analyses.
- Leading programs for introducing a quality assurance app: requirement analysis, process design, app development, 1st level support, Scrum/Kanban methods.
- End-to-end project management for unsubsidized and subsidized fiber optic expansion in Rhineland-Palatinate: managing planning offices, civil engineering, environmental consultants, Nokia as technical supplier, budget and schedule planning, acceptance, and reporting.
Cluster Project Manager
WemaCom Breitband
- End-to-end responsibility for planning, approval, construction phase, and acceptance of FTTH clusters in subsidized broadband expansion.
- Coordination of all involved areas: planning office, civil engineering, construction supervision, safety coordinator (SiGeKo), environmental offices/consultants, and legal advisors.
- Inspection of OTDR measurements on active and passive network terminations.
- Requests for funding and proof of use.
- Deriving work packages, defining milestones, tracking budgets, and reporting to the PM board.
- Conducting weekly construction meetings and preparing weekly project reports.
- Budget responsibility (~€24 million).
Service & Contract Management / Project Management / Rollout Management / Process Management
Unitymedia / Vodafone
- Execution and control of services by sourcing partners in a multi-provider environment based on ITIL and defined KPIs.
- Risk identification and initiation of countermeasures to ensure the transport platform.
- Service delivery meetings, escalation management, and negotiation of CAPEX-oriented contracts.
- Project management for multi-site enterprise clients (banks, schools, government agencies): planning, civil engineering, in-house installation, coordination, SPoC.
- Fiber optic connection of mobile phone towers (E+/O2): site surveys, rollout and budget planning, coordination of civil engineering and in-house cabling, OTDR measurements.
- Development of a calculation model: process analysis, requirements specification, Excel tool, interface coordination, and steering board reporting.
- Software development project for geodatabase integration: requirements catalog, solution selection, coordination, and reporting.
- Rollout management of IP transport connections over coax for large customers: service provider kickoff, installation tracking, escalation, and acceptance protocols.
- Development and optimization of hotel internet access and Wi-Fi solutions: process design, escalation management, and reporting.
Project Manager Global WAN Restructuring Spiderman I & II
Volkswagen AG / MAN Deutschland AG
- Restructuring individual sites as part of a global WAN contract extension according to PMI guidelines.
- Creating risk assessments, escalation procedures, and transformation and migration plans.
- Aligning organizational issues with providers, internal departments, and group subsidiaries.
- Managing field units during migrations and conducting site acceptance tests.
- Regular reporting of project milestones to program management.
- Developing a closing procedure and final documentation, taking into account contractual terms and compensation mechanisms.
System Administrator
T-Systems International
- Administration of a virtual high-availability solution based on VMware ESX/ESXi and BladeCenter technologies.
- Monitoring hardware performance parameters and resource usage.
- Performing release upgrades and replacing faulty blades in data centers (Munich, Frankfurt).
- Documenting 19" rack designs and supporting automation and high-availability projects.
- Planning and executing migrations from Windows Server 2003/2008 to 2012, including adjusting domain structures.
- Administering storage networks (NAS/SAN), user and permission management, and application deployment.
- Acting as temporary crisis hotline, maintaining the operations manual, and supporting internal ITSM and IMAC processes.
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Telecommunication, Automotive, Information Technology, and Pharmaceutical.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Information Technology, Operations, Product Development, and Quality Assurance.
Frequently asked questions
Have questions? Find more information here.
is based in Bad Kreuznach, Germany and can operate in on-site, hybrid, and remote work models.
speaks the following languages: German (Native), English (Advanced).
has at least 17 years of experience. During this time, has worked in at least 6 different roles and for 6 different companies. The average length of individual experience is 3 years and 10 months. Note that may not have shared all experience and actually has more experience.
Based on recent experience, would be well-suited for roles such as: Service Contact Person (Single Point of Contact), Program Manager / Process Manager / Interim Manager / Partner & Exit Manager / Home Connection Manager / Product Owner, Cluster Project Manager.
's most recent position is Service Contact Person (Single Point of Contact) at waveIT GmbH.
In recent years, has worked for waveIT GmbH, Unsere Grüne Glasfaser, and WemaCom Breitband.
is most experienced in industries like Telecommunication, Automotive, and Information Technology. also has some experience in Pharmaceutical.
is most experienced in business areas like Project Management, Information Technology, and Operations. also has some experience in Product Development and Quality Assurance.
has recently worked in industries like Telecommunication and Pharmaceutical.
has recently worked in business areas like Project Management, Operations, and Product Development.
has 15 certificates. Among them, these include: SUN BladeCenter configuration on Intel and SPARC platforms, Design and configuration of SAN, NAS, and RAID storage systems, and ITIL Foundation V3.
The availability of needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 27 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Frank J.
Last position:
Senior Project Manager / IT Manager - Email Gateway Migration & Information Security at Public Authority
- Strategic planning, detailed technical preparation and operational management of an email gateway migration in a security-critical government environment.
- Preparation of the technical specification and development of technical concepts and migration approaches in line with BSI requirements.
- Technical requirements management with business units, information security and operations.
- Coordination of external service providers, integrators and implementation partners; maintenance of project plans, milestones, resources, risks and dependencies.
- Regular reporting to project management, the program environment and internal stakeholders.
Achim K.
Last position:
Portfolio Manager, Consultant, Leadership Coach at Abbvie Deutschland GmbH &Co. KG
- Management and optimization of a portfolio of about 100 projects (launches, in-field solutions, data & analytics, digital solutions, digital products)
- Optimization of the existing project standard (playbook) and alignment with the European and global organization (USA)
- Coaching project managers on setup, planning, cooperation with business, GDPR, GxP, data security and launches
- Preparing projects for works council information and project closeout communication
- Optimization of resource management (tracking, allocation, prioritization)
- Taking over individual project leads (off-/transboarding, event management, checking whether WhatsApp is allowed on a business smartphone)
- Supporting the hiring of external project managers
- Optimization of meeting structure, project controlling (KPIs), change and demand management
- Optimization of risk, issue, dependency and quality management and support during internal audits (GxP)
- Optimization of the portfolio steering tool (Smartsheet) on national, European and global level
- Design and implementation of a Business Value Complexity Scoring
- Building a strategic PMO with a sister department and optimizing cross-functional teams
- Reporting, communication and escalation at management level
- Leadership coaching for several future leaders (short-time assignment)
- Development of the concepts "PPM as a Service" and "Internal Customer Approach"
- Development and review of a concept "AI Data Governance" including roles and processes
- Selection and onboarding of the successor
Andreas A.
Last position:
Project Manager for Network and Infrastructure Project Migration EU/US/MEX at Klöckner & Co SE
- Implementation of a Network Access Control (NAC) security system at 106 locations in the USA, Mexico, and three European countries to safeguard facilities against cyberattacks.
- Management of infrastructure renewal in the core network in the USA and Mexico, transitioning to a new hardware provider.
- Optimization of LAN, WAN, and WLAN infrastructure, including division of network topology into dedicated VLAN segments for IT and OT separation.
- Development of project scope definition considering technical and organizational business requirements.
- Integration of local IT resources and external suppliers to capture functional, temporal, and financial requirements.
- Specification of work packages for US/EU NAC system implementation and modernization of the US core network.
- Acquisition of necessary approvals for project execution and budgeting from the board.
- Creation of rollout plans, inventory data collection, data validation, and drafting detailed project definitions.
- Development of a central project control application.
- Execution of pilot implementations to test developed solutions.
Georg D.
Last position:
Senior Project Manager at Apleona GmbH
- Project review, restructuring and PM for the migration of a total of 12,000 Windows workstation systems (650 applications) from SCCM or Empirum/Matrix42 to MS-Intune following a merger.
- Took over a significantly delayed and poorly managed project in the role of “firefighter”.
- Completely revised and adjusted/updated the planning of the customer and the service provider involved.
- Introduced planning baselining and the recording/mitigation of current risks.
- Introduced an efficient, partly automated planning/reporting interface between MS-Project Planning (service provider) and Jira (customer).
- Restructured meetings to increase efficiency and eliminate redundant appointments.
- Completed the analysis and design phase and prepared basic data for migrations from the heterogeneous systems of the two merged companies.
- Started the User Acceptance Test (UAT).
- Technologies: MS Autopilot, Zero Touch.
Christian F.
Last position:
Architecture Management at Agency
Expert in the company's architecture management area
Support for standardizing the company's IT landscape
Further development of architecture management
Shaping the company's business architecture
Restructuring, administration and maintenance of all IT assets
Support in creating a unified software asset management and CMDB
Creation of unified document management (e-file)
Transition of documents into a central DMS structure
Link between architecture management and the department's internal business process management
Support in developing strategic and tactical development plans
Organizing communication with key stakeholders
Support in the conception, organization and coordination of the architecture office to be built up
Accompanying and advising the entire architecture management process
Advising the company's business units on architectural topics and their framework conditions
MS Office, Windows 10, VBA
ITIL, TOGAF, PowerBi, Kanban, Scrum
Internal agency tools
Open Touch Conversation, Webex, wire, bdbos
MS Sharepoint, JIRA, Confluence
ARIS, Archimate, BPMN
Carl-Friedrich L.
Last position:
Rollout Project Manager / Multi-project Management / Project Lead / Program Manager at GlasfaserPlus
Project content / Description of services:
Management and coordination of all new-build areas in the assigned region to ensure completion on time
Responsibility for network planning, budget calculation, and budget approval for optimal resource planning in the construction process
Cross-project management of service providers for the efficient implementation of joint construction or connection of new-build areas
Preparation, tendering, and awarding of contracts within budget limits
Ensuring material supply for smooth joint construction
Management of fiber-optic expansion and provision of data lines; densification
Stakeholder management
Introduction and setup of Kanban board, including maintenance
End-to-end rollout management
Escalation management
Service provider management
Construction monitoring and management of construction schedules
Preparation and tracking of project plans and Gantt charts
Risk management
Claim management and project recalculations
Problem and incident management
Change management
Capex and Opex control and monitoring
Contract management and change order management
Conclusion of lease, purchase, or rental agreements for the development of required properties or lines
Technical collaboration with construction managers and service providers within the construction projects to ensure the timely completion of new-build areas
Definition of requirements, categorization, and prioritization, including monitoring and follow-up in accordance with the project plan
Preparation and delivery of presentations for various management levels
Preparation and creation of decision papers
Forecast
Establishment of project “back to green” post-installation and densification
Environment: MS Office, MS Teams, SAP; SharePoint, Jira, Confluence, Bizagi. GBGS, PowerBI, TKI, Flash Kanban
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Service Contact Person (Single Point of Contact)
Nearby freelancers
Professionals working in or nearby Bad Kreuznach, Germany