Experience
Director Plantmanagement with full ramp up and relocation responsability
- Ramp-up management for production and logistics at a new location in Austria (medical devices for dental industry)
- Project management to combine three locations in one new building
- Time and cost tracking for the new building
- Production and logistics processes according to a greenfield approach based on a value stream analysis
- Approach to ramp up production with complete shop floor design
- Temporary team lead of up to 60 people
Director Logistics and Projectmanagement for warehouse relocation
Solarwatt
- Team lead of approx. 35 people in the logistics department
- Restructuring organization in logistics and dispatch
- Project lead for a new central warehouse to consolidate eight external warehouses into one new location
- Process optimization in warehouse, goods receipt and order management
- Introduction of a KPI system for regular performance tracking
- Established capacity planning and calculation in logistics processes and balancing workload to planned capacity demand
Interim Plantmanagement and projectmanagement for restructuring
Exide
- Interim and restructuring project at a supplier of industrial batteries
- Analysis of existing organization and redesign of structure
- Capacity planning based on new time calculations
- Implementation of flexible weekly capacity demand
- Tracking of weekly CIP projects
- Team lead of approx. 105 people
Project management for supply chain design for two European suppliers for BMW (US) and BMW (Mexico)
- Process design analysis for order management
- Value stream design for deliveries from Germany and Poland to the US with combined freight processes (truck/sea/train)
- Project management to build a US distribution hub near the end customer
- Ramp-up using the OPR method for customs-optimized import to the US
Interim operations management at a supplier for offshore heating systems
- Redesigned material flow and order management
- Defined order book clusters as a prerequisite to establish standards in order management
- Team lead of 230 operators in five different departments
- Process design analysis for order management
Plant management at a supplier of filter systems in Switzerland
- Optimization of organisation
- Project lead for relocation to a new site in Kanton St. Gallen
- New layout and material flow
- Support to establish shorter Q-circles for better failure analysis
- Several CIP workshops to increase productivity
- Implementation of a bonus wage model
- Team lead of approx. 30 persons
Operation and logistic management at a supplier of electronic devise for machining industry (ATM)
- Foot print analysis of existing structure
- Relocation of some production processes to sites
- Recalculation of order lead time
- Establish of a defined stock of semi finished products
- Optimization of organisation
- New layout and material flow for German site at Hockenheim
- Team lead of approx. 45 persons
IM Management for Production, Supply Chain and Planning at a new production site
IFM Automotive
- Design of the new production and logistic processes for the new plant
- Support to get DIN ISO 16949 audit for the new site
- Support for IT/ERP switch from BAAN to SAP
- Relocation planning and execution of relocation
Partner
IFAO AG
- Business plan analysis and restructuring of a small-batch manufacturing operation for transmission components
- P&L analyses and action plan for optimizing processes, organization and operating results in several series production companies
- Installation and application of a scanning tool for the evaluation of project management and R&D processes (“Lean Product Development Process”)
- Development and application of a maturity evaluation system for analysing the PDP of series suppliers
- Redesigning a supply chain system for outdoor products
- Analysing inbound processes to determine default risks due to quality or system weaknesses
- Preparation and implementation of a workshop concept for an international manufacturer of outdoor products
- Production planning adjustment to meet the requirements of sequence delivery for a supplier of insulation and lining components to the automotive industry
- Managing headcount reduction projects for series and small series products (solenoid valves, shop-floor visualization systems, door systems for rail vehicles)
- SCM inbound for the range of parts of an OEM component factory
- Implementation of shop-floor methods such as goal visualization, Kamishibi, operative levelling, waste-walk workshops, PDCA integrated management systems and introduction of 5S standards
Partner
CONMOTO Consulting Group
- Implementation of a product cost reduction program for a component supplier to the rail vehicle industry
- Interim production management for a component supplier to the automotive transmission manufacturing industry
- Logistics and production system planning for a new product line at a component production unit for the commercial vehicle industry
- Detailed planning for sequence delivery of vehicle axle systems to an OEM factory
- Benchmarking of delivery variants depending on range and type of parts
- Value stream analysis and design projects
- Re-engineering of PEP and project management processes for a component supplier to the rail industry
- Evaluation of location and segmentation for a manufacturer of components for electric motors
- Improvement of results and strategic reorientation for a tool manufacturer
- Introduction of kanban automatic feedback systems for a component supplier to the automotive industry
- Development of a traceability concept in connection with kanban processes
- Project management of restructuring and reorganization, followed by interim management, for a safe manufacturer in the Czech Republic
Segment and Production Management, Valve Section
Alfmeier Präzision GmbH
- Overall responsibility for a production area with injection moulding, assembly and test facility
- Responsibility for job planning, program planning, scheduling, manufacturing control and QA
- Implementing a number of relocations to the Czech Republic
- Integration of QA planning into the segment organization
- Introduction of CIP and employee suggestion system
- Introduction of various shop-floor management tools
- Introduction of kanban (internal and to suppliers)
- Introduction of operative fault analysis methods (Shainin)
- Setting up a TPM database
- Setting up a waste walk concept
- Introduction of a qualification and assignment matrix
Manager, Logistics
Alfmeier Präzision GmbH
- Implementation and launch of a new automated high rack warehousing system including warehousing software
- Power of attorney from 1 January 1992
- Installation of a logistics system at the new Rottenburg branch
- Project managing the start-up of the Audi A8 tank JIS delivery process for the EDL Center in Neckarsulm
- Development of a logistics performance measurement system
- Implementation of cost and inventory reduction measures
- Production transfer from in-house to outsourcing within 4 weeks
- Changeover to a new MRP system (FORS)
Assistant Manager Logistics
AUDI AG
- Optimization of the logistics performance measurement system
- Coordination of GVZ project planning
Production Scheduler – Assembly Scheduling
AUDI AG
- Revision of A6 production plans to ensure product design is suitable for production
Trainee
AUDI AG
- Training in all major business segments of AUDI AG
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Automotive, Manufacturing, Energy, and Healthcare.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Logistics, Operations, Quality Assurance, Production, and Supply Chain Management.
Frequently asked questions
Have questions? Find more information here.
Franz is based in Dollnstein, Germany and can operate in on-site, hybrid, and remote work models.
Franz speaks the following languages: German (Native), English (Advanced), French (Intermediate), Italian (Intermediate), Czech (Elementary).
Franz has at least 38 years of experience. During this time, Franz has worked in at least 14 different roles and for 7 different companies. The average length of individual experience is 3 years and 6 months. Note that Franz may not have shared all experience and actually has more experience.
Based on recent experience, Franz would be well-suited for roles such as: Director Plantmanagement with full ramp up and relocation responsability, Director Logistics and Projectmanagement for warehouse relocation, Interim Plantmanagement and projectmanagement for restructuring.
Franz's most recent position is Director Plantmanagement with full ramp up and relocation responsability.
In recent years, Franz has worked for Solarwatt.
Franz is most experienced in industries like Automotive, Manufacturing, and Energy. Franz also has some experience in Healthcare.
Franz is most experienced in business areas like Project Management, Logistics, and Operations. Franz also has some experience in Quality Assurance, Production, and Supply Chain Management.
Franz has recently worked in industries like Healthcare, Manufacturing, and Energy.
Franz has recently worked in business areas like Logistics, Project Management, and Production.
Franz holds a Bachelor in Mechanical Engineering from Technical University of Munich.
Franz has 1 certificate: KfW Advisor (cert.) for Energy Efficiency in Industry.
The availability of Franz needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 25 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Friederike B.
Last position:
Self-employed Consultant and Trainer at Friederike Bohm Consulting
- Consulting on Lean, logistics, AI applications, and process optimization
- Tailored concepts for digitalization, change & transformation
- Adaptive training and workshops for specialists and managers
Achim D.
Last position:
Head of Operations at ZEISS Vision (Vision Technology Solution, VTS)
- Production, strategic sourcing, global 2nd level service, SCM, logistics, life cycle management, QA, launch prep
- Medical devices according to DIN ISO 13485, MDR, FDA & MDSAP for ophthalmology and opticians
- Bridged the management vacancy
- Design transfer for two R&D key projects
- Set up KPI dashboard
- Supply capability master plan 2023
- Established life cycle management
- Led and developed global service
- Coaching high potentials
- Built strategic sourcing
Klaus-Dieter B.
Last position:
Site Manager Lithium-Ion Battery at Porsche
- Independently managing the construction of global projects for lithium-ion coating lines
- Leading and coordinating international installation teams and subcontractors
- Ensuring compliance with contractually agreed installation and commissioning milestones
- Ensuring timely completion of outstanding items on site
- Regularly communicating with the project manager about current project status
- Leading daily internal site meetings and attending construction meetings with suppliers and customers
- Documenting processes and progress in weekly reports
- Responsible for occupational safety and health protection on site
Florin M.
Last position:
Program Manager – Batteries (EV-Electric Vehicle) at Da Vinci Engineering
- Main interface between customer, stakeholders and internal cross-functional teams (software, hardware, mechanical and suppliers)
- Ticket management of internal and customer problems using Jira
- Lead pre-analysis team to conduct first analysis and assignments of tickets to the responsible person and/or departments
- Define the interfaces of the problem resolution management process to engineering, change-request management and project management processes
- Facilitate regular meetings to track root-cause analysis and problem resolutions
- Monitor project progress and identify deviations in time, scope, cost and quality
- Lead projects through all quality gates and milestones until SOP
- Forecast, resource planning, controlling and cost estimation for running projects, new RFQs and customer changes
- Weekly reporting of project status to the Program Director
Holger V.
Last position:
Freelance Process Consulting and Implementation in Companies at Holger vom Felde ProzessBeratung
Operational management of the screen printing department at New Albea Kunststofftechnik GmbH, Seelbach, 6 months
Setting up the leadership structure
Setting up the communication structure
Process optimization
Ensuring output
Operational management of the coating department for baking trays at KEMPF GmbH Rohrbach, 12 months
Controlling and optimizing internal workflows and introducing shop floor management for valid communication
Establishing production planning and a robust leadership structure with increased coating line output according to OEE
Stabilizing processes (availability, quality, logistics), preparing for emissions monitoring, safety and environmental protection
Project management of three international projects in transparent optical injection molding (medical technology and automotive) at OPTOFLUX GmbH Nuremberg, 7 months
Ensuring project progress, managing internal workflows and customer communication on technical and organizational topics
Budget responsibility, using SFM with a Scrum board and leading project teams, technical support and start-up management of optical molding parts
Process optimization in start-up management of pipette injection molding as well as optical inspection and error analysis at TOP IT-Service / Hack Werkzeugbau
Conducting and supporting pilot runs, preparing project reports and measurement protocols, improving international communication (English)
BWA analysis and workflow analysis (VSA/VSD) within business optimizations in industry and trade, implementing improvement measures and setting up a project management structure
Workflow analysis (VSA/VSD) and defining necessary measures with the owner and management at WILD Design GmbH in consumer goods injection molding
Daniel K.
Last position:
Technical Project Manager & Interim Manager at Remmert GmbH
- Project volume in €: ~15 million
- Number of employees: 8
- Managing strategic projects & leading procurement
- Outsourcing standard products abroad
- Process optimization in quality management
- Interim manager for purchasing & procurement
- Planning and implementation of optimization measures
- Material flow in production
- Warehouse management
- Process automation
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Director Plantmanagement with full ramp up and relocation responsability
Nearby freelancers
Professionals working in or nearby Dollnstein, Germany

