Experience
Factory Planner and Overall Project Lead: Factory Planning
EPRO Emerson
- Conducted a site survey: Detailed documentation of all existing machines, equipment, layouts, utilities, and processes
- Technical analysis: Assessed the performance, efficiency, and utilization of machines and their interfaces
- Process mapping: Documented material flow, lead times, bottlenecks, and waste
- Layout optimization: Analyzed the existing setup, simulated material and people flows, and developed an improved factory layout
- Cost-benefit analysis: Analyzed the costs and benefits of replacing, modernizing, or modifying equipment
- Stakeholder management: Engaged production, maintenance, logistics, occupational safety, and senior management
- Created a roadmap: Planned implementation phases, milestones, investments, and downtime
- Prepared change management: Employee training, communication plan, and support for the culture shift toward more modern processes
- Modification plan and tracking
Staff role for TL at the operational level
Schaeffler
- Shopfloor management and operational excellence for sub-lines 1-3
- Holistic improvement of production lines
- Coordinated and planned maintenance shifts
- Customer reports and audits
- Supported the implementation of new manufacturing technology in the SiC area
- Created and maintained work instructions and Standard Operating Procedures
- Identified and resolved issues
- Process optimization using Lean methods
Overall responsibility for SB20 production hall
Vitesco Technologies
- Project management from hour zero
- Communication with customers and suppliers
- Preliminary equipment acceptance
- Coordinated all trades involved in the hall refurbishment, equipment installation, and production ramp-up
- Reported to the Steering Committee and senior management
- Coordinated and led the production ramp-up
- Stakeholder management
Wolf Consulting - Drive to Create
- Industrial engineering
- Factory planning
- Assembly planning
- Production manager
- Workplace design using 5S, MTM, and REFA
- Setup time optimization and implementation of SMED
- Industry 4.0 through modeling and analysis
- Restructuring and coaching
- Factory and layout planning: Analysis of the current and target state, structuring and sizing technical processes, integrating Lean concepts, creating function diagrams and planning layouts in 2D and 3D
- Shopfloor management: Applying 5S and Lean Management, visual shopfloor management and KPIs, analyzing and reducing types of waste, preventing errors through Poka-Yoke design
- Quality management: Screening quality documents, preparing audit documents, implementing customer requirements, and providing back-office support for supplier qualification
Back-office support
BOMAG GmbH
- Created documents according to VDA 6.2, VDA 6.3, and VDA 2
- Streamlined or established process flows for supplier qualification
- Created work instructions and presentations
NPI Manager and Industrial Engineer
WILO SE
- Design of production lines
- Leading Product Design rounds
- Leading Process Design rounds
- Process cost calculations
- Reducing product variety
- Sub-package lead for injection molding, painting, final assembly, and project controlling
Line Coordinator and Line Optimization
Aixtron SE
- Line optimization
- Setting up the Shopfloor Coordination department
- Conversion from assembly-line production to flow production
- Planning and implementing processes and setting up new workstations (CJ20N-Project Builder)
- Material substitution
- Employee training
- Harmonizing documentation
- SAP-based coordination
Industrial Engineer
SAS Autosystem GmbH
- Revising MTM analyses
- Planning and implementing processes and setting up new workstations
- Maintaining data and line balancing in TiCon
- Developing in-house rationalization and optimization scenarios
- Direct communication with customers and suppliers (e.g., VW Sachsen, Audi, Seat)
- Investigating quality-related issues and developing solutions
Medior Technology Consultant IE
SALT and PEPPER Technology GmbH & Co. KG
- Line optimization
- Setting up a department
- Determining standard times
- DMAIC and optimization projects
- Implementing processes according to ISO 9001
- Training employees in work-study methods
- Project management for large-scale projects
- Designing work processes based on Lean Six Sigma (Black Belt), REFA, MTM-1, and MTM-AUS
- New Product Implementation
- Shopfloor Management
Industrial Engineer for Work Study & Series Planning, Battery Assembly
Akkumotive GmbH & Co. KG
- Collecting basic data for individual stations across all lines
- Recording relevant workstations and optimizing them from a work-study perspective (ergonomics, anthropometry)
- Supporting the Mercedes Production System teams
- Developing in-house rationalization and optimization scenarios
- Training new employees (mentoring)
- Administrative work to set up the department (creating templates, establishing structures and reporting channels)
- Working with other departments and customers (process planning, MPS, logistics, maintenance)
Quality Manager for Metrology and Quality Assurance
Schieffer GmbH & Co. KG
- Preparation of EMPBs & PPAPs
- Tactile, optical, and manual measurements
- Preparation of work instructions
- Project management
- Sample approval according to VDA 2
- Quality assurance lead for material-handling systems
Student Assistant and Bachelor's Thesis Student in Metrology and Quality Assurance
Schieffer GmbH & Co. KG
- Preparation of measurement reports
- Employee training
- Conducting optical, tactile, and manual measurements
- Evaluation, design, and implementation of modules to optimize a CAQ system
- Training on the new system
Working Student in Industrial Engineering
Brand KG
- Independently preparing work instructions for the heat treatment process for springs and wire-bent parts
- Recording tool service life
- Recording and documenting machine parameters
Practical Semester in Quality Management Purchasing
Hella GmbH & Co. KGaA
- Preparing visit reports and summaries
- Assessing supplier information
- Corresponding with suppliers
Student Assistant in Administration and IT
Hochschule Hamm-Lippstadt
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Manufacturing, Automotive, and Education.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Quality Assurance, Operations, Project Management, Production, Product Development, and Information Technology.
Frequently asked questions
Have questions? Find more information here.
Dennis is based in Oelde, Germany and can operate in on-site, hybrid, and remote work models.
Dennis speaks the following languages: German (Native), English (Advanced), Spanish (Advanced), Russian (Advanced).
Dennis has at least 9 years of experience. During this time, Dennis has worked in at least 14 different roles and for 14 different companies. The average length of individual experience is 1 year and 7 months. Note that Dennis may not have shared all experience and actually has more experience.
Based on recent experience, Dennis would be well-suited for roles such as: Factory Planner and Overall Project Lead: Factory Planning, Staff role for TL at the operational level, Overall responsibility for SB20 production hall.
Dennis's most recent position is Factory Planner and Overall Project Lead: Factory Planning at EPRO Emerson.
In recent years, Dennis has worked for EPRO Emerson, Schaeffler, Vitesco Technologies, Wolf Consulting - Drive to Create, and BOMAG GmbH.
Dennis is most experienced in industries like Manufacturing, Automotive, and Education.
Dennis is most experienced in business areas like Quality Assurance, Operations, and Project Management. Dennis also has some experience in Production, Product Development, and Information Technology.
Dennis has recently worked in industries like Manufacturing and Automotive.
Dennis has recently worked in business areas like Operations, Project Management, and Quality Assurance.
Dennis holds a Bachelor in Industrial Engineering.
Dennis has 13 certificates. Among them, these include: AutoCAD, IPMA Level D, and Painting training by A&L Beschichtungstechnologie GmbH.
The availability of Dennis needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 26 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Andreas K.
Last position:
Founder and Managing Director (Shareholder) at PROPERIM GmbH
- Task force for backlog reduction
- Conducted value stream analysis
- Migrated Excel processes back into SAP
- Introduced shop floor management
- Performed total cost evaluation for processes and product groups/sites
Jörn B.
Last position:
Process Optimization Consultant at Tandler GmbH
- Improving processes in the purchasing area
- Digitizing purchasing processes
- Optimizing end-to-end manufacturing processes
Joseph A.
Last position:
Business Operations and ASPICE Quality Assurance at Freelance
- Conduct comprehensive assessments of operational processes to ensure alignment with ASPICE standards.
- Develop and implement quality assurance frameworks that enhance product and process quality.
- Collaborate with cross-functional teams to drive continuous improvement initiatives and foster a culture of quality.
- Provide training and support to teams on ASPICE requirements and best practices.
- Facilitate audits and assessments to identify non-compliance issues and develop corrective action plans.
Andreas K.
Last position:
Consultant / Interim Manager Engineering (Machining) at Neumayer Tekfor GmbH
Process optimization and automation
Development and documentation of savings potential to reduce manufacturing costs
Analysis of production processes to identify weak points
Coaching the Engineering department to improve ways of working and lean philosophy
Elimination of work steps with annual savings of approx. €150k
Increase in machine shift output from 3,600 to 4,250 pieces (18%)
Increase in shift output of two machines from 105 to over 120 pieces (14%)
Preparation for the integration of automated 100% inspections and laser marking into the machine process
Material optimization to stabilize machining processes
Tobias G.
Last position:
Owner at The Alternative Board Region Münster West und Kreis Coesfeld
- Business and executive coaching
- Business consulting
Klaus-Dieter B.
Last position:
Site Manager Lithium-Ion Battery at Porsche
- Independently managing the construction of global projects for lithium-ion coating lines
- Leading and coordinating international installation teams and subcontractors
- Ensuring compliance with contractually agreed installation and commissioning milestones
- Ensuring timely completion of outstanding items on site
- Regularly communicating with the project manager about current project status
- Leading daily internal site meetings and attending construction meetings with suppliers and customers
- Documenting processes and progress in weekly reports
- Responsible for occupational safety and health protection on site
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Factory Planner and Overall Project Lead: Factory Planning
Nearby freelancers
Professionals working in or nearby Oelde, Germany
