Green Steel Project Management
Saar Stahl
- Conversion of furnace heating from coke gas to natural gas, followed by conversion to a natural gas/hydrogen mix
- Utility supply and piping (compressed air, cooling water, gas supplies, electrical installation)
- Procurement and negotiations with suppliers
- Reporting to senior management
- Creating layouts and project plans in MS Project
- Budget planning and monitoring
- Creating various specifications and requirements documents
- Topics: steel production, blast furnace, rolling mill, gas burners, hydrogen
Production Relocation Project Management
FRT Camtek
- Managing the project to relocate the production/assembly of surface measuring devices from Bergisch Gladbach to Rösrath
- Utility supply and piping (compressed air, cooling water, vacuum, electrical installation)
- Procurement of cleanrooms and a temporary cleanroom tent
- Reporting to senior management
- Creating layouts and relocation plans
- Budget planning and monitoring
- Project planning in MS Project
- Liaising with structural engineers and architects for office buildings
- Creating various specifications and requirements documents
- Acceptance of all work
- Negotiations with suppliers
Production Relocation Project Management
Poppe/Veritas Gießen-Gelnhausen
- Setting up injection molding production in a rented hall, including infrastructure and departments (toolmaking, workshop, production, office)
- Utility supply and piping (compressed air, cooling water, vacuum, emergency cooling, electrical installation)
- Reporting to senior management
- Planning material handling systems
- Creating layouts and relocation plans
- Budget planning and monitoring
- Project planning in MS Project
- Knowledge of HOAI Phases 2–8 and coordination of specialist planners
- Creating various specifications and requirements documents
- Selecting installation contractors and specialist companies, and negotiating with suppliers
- Topics: fire protection, energy management, change of use, acceptance of all work
Project Management for Air Suspension, Steering and Airbag Components
Voestalpine Annweiler am Triefels
- Product development from concept phase through technical implementation and series production
- Reviewing and approving specifications and requirements documents
- Special-purpose machine engineering for production equipment
- Production management and schedules in MS Project and Excel
- Tracking project maturity and costs, and preparing budgets
- Customers: Tesla, Bilstein and BMW
Permitting Management
TESA Werk Hamburg
- Developing the required permitting steps for a new compound production process
- Applying BImSchG
- Preparing building permit applications
- Fire protection measures
Project Management for Relocation Projects and Production Relocation
Hitachi-ABB Hanau
- Planned and carried out the move from Hanau to Karlstein
- Converted a logistics hall into a production facility (4.500 m²)
- Utilities and pipework (compressed air, air conditioning)
- Plant construction (test stands for switchgear, high-current test system, crane systems)
- Reporting to senior management
- Created layouts, schedules and project plans (MS Project)
- Budget planning and monitoring
- Knowledge of HOAI phases 2–8; coordination of specialist planners
- Created various specifications and requirements documents
- Selected installation and specialist contractors, and negotiated with suppliers and the landlord
Permitting support / Reducing wastewater costs at car washes
Various tenants nationwide
- Applied to water authorities for approval of wastewater volumes
- Assessed conditions on site
- Prepared reports on evaporation
- Permitting support and negotiations with authorities
- Multi-project coordination
Project Management for Various Relocation Projects and Materion Production Relocation
Heraeus Hanau
- Planned and carried out expansion measures as part of "Vision 2020"
- Built a new hall (10.000 m²) in Alzenau and set up the new production facility
- Plant construction (target production, casting systems, melting furnaces, bonding)
- Pipework / utilities (closed-loop cooling system with emergency cooling, compressed air, gas line)
- Reporting to senior management
- Construction supervision and spatial changes
- Knowledge of HOAI phases 2–8; coordination of specialist planners
- Created layouts, specifications and requirements documents
- Relocation planning, budget planning and monitoring, and budget applications
- Schedules and materials handling systems
- Selected and negotiated with installation and specialist contractors
Project Management for the Reorganization of a Vacuum Brazing Operation
Mahle-Behr Mühlacker
- Reorganized the vacuum brazing operation for automotive oil coolers
- Created layouts
- Budget planning
- Plant construction: vacuum brazing system and modification of a cooler test system (leak testing, helium as the test medium)
- Combined two block production machines into one
- Created specifications and requirements documents
- Selected an installation contractor and negotiated with suppliers, including price negotiations and SAP purchasing
Project Management for Glazing and Plastic Overmolding
Richard Fritz Besigheim
- Managed product development from concept through technical implementation and series production
- Reviewed and approved specifications and requirements documents
- Created schedules in MS Project and Excel
- Tracked project maturity and approved drawings
- Tracked costs and maintained customer relationships (Volkswagen, Seat, Skoda)
- Developed gauge and measurement concepts
Project Management for Relocation of Knitting Machines and Stenter Frames
Freudenberg Weinheim
- Relocation of 19 knitting machines and stenter frames from Iserlohn to Weinheim
- Added fabric dyeing and rewinding (knitting beam to dyeing beam)
- CAD drawings and layouts
- Process transfer and construction supervision
- Pipework (soft water supply, gas connection, cooling water, compressed air)
- Plant construction: dyehouse, stenter frames, rewinders, knitting machines
- Planning of dyehouse, stenter frames and knitting department
- Process development for fabric dyeing and Kappa calculation
- Preparation of specifications and scopes of work
- Selection of relocation company and supplier management
- Scheduling in MS Project
- Infrastructure: building extension, utilities, climate control, crane runway
Project Management for Planning an Annealing Furnace for Anthracite Refining
Rheinfelden Carbon
- Planning of an anthracite annealing furnace
- Preparation of CAD drawings
- Construction supervision and layout changes
- Budget planning and obtaining quotes
- Negotiations with suppliers, including price negotiations
Project Management for Construction of Production Plants in Russia and India
SAARGUMMI International
Set up new production plants for seals in Tutaev (Russia) and India
Optimized production structures at existing plants
Plant construction for extrusion lines and finishing
Pipework (compressed air, gas)
Set up the first extrusion line and ordered equipment for the second line
Prepared tool lists for four Ford projects and procured production equipment
Plant capacity studies and transport organization, including customs clearance
Oversaw setup through the first pre-series delivery and Run at Rate
For India: prepared layouts and obtained quotes from suppliers
Project Management for Food Processing Plant Construction
Cargill Salzgitter
- Expanded the oil mill from 1.400 to/d to 2.000 to/d within six weeks
- Planned and prepared specifications and selected suppliers
- Conducted purchasing negotiations and processed order confirmations and invoices
- Handled hazardous materials and explosion protection (hexane)
- Scheduled work and ensured timelines were met
- Managed all utilities (gas, water, electricity, compressed air)
- Followed workplace safety regulations in explosion-protected areas
- Managed pipework and worked with P&IDs
- Supervised construction sites and logistics
Project Management for Plant Construction
H.C. Starck Goslar
- Modernized a rotary kiln
- Relocated and expanded a cooling system
- Relocated and expanded boron molded parts production
- Managed costs and prepared specifications
- Selected suppliers and purchased new capital equipment
Project Management for Plant Engineering and Production Relocation of Track Superstructure
SAARGUMMI International
- Relocated and added operating equipment to a new hall following the sale to Vossloh
- Planned and procured presses, forming machines and tempering furnaces with cost efficiency in mind
- Negotiated purchases and processed order confirmations
- Ensured the supply of gas, water, electricity and compressed air
- Obtained BImSchG permits and conducted hazard analyses
- Managed logistics and minimized production downtime
- Ensured quality
- Relocated production equipment to subsidiaries in the Czech Republic and Slovakia
Project Management & Project Leadership for Plant Engineering
SAARGUMMI International
- Planned a 25,000 m² rubber manufacturing plant in Tutaev (Russia)
- Supplied rubber profiles to the surrounding automotive industry
- Ordered from suppliers and service providers
- Negotiated purchases and arranged energy connections
- Managed fire protection, cooling systems and workshop equipment
- Ensured quality and obtained operating permits
- Planned five extrusion lines, a mixing line, hydraulic presses and an Auma
Project Management & Project Leadership for Plant Engineering – Mixing Line
SAARGUMMI International
- Built a mixing line to produce a rubber semi-finished product (cost: €3.7 million)
- Led and coordinated the mixer, three rolling mills, strainer, sheet cooling system and weighing system
- Expanded the silo system and controlled it using Siemens S7
- Managed suppliers and coordinated schedules
- Prepared specifications, placed orders and selected suppliers
- Negotiated purchases, controlled costs and processed invoices
- Managed documentation and drawings using AutoCAD
- Supervised construction and obtained all permits (building permit, emissions report under BImSchG)
- Commissioned hydraulic presses and measurement and control technology
Project Management & Project Leadership
Speedoil Haag
- Optimized filling technology, warehousing and tank technology
- Managed suppliers and cost estimates
- Coordinated and monitored schedules
- Commissioned and handed over equipment
- Coordinated teams across purchasing, model making, sales, design, QM, the testing department and series production
Project Management & Project Leadership
FINA Mineralöl / Aral AG
- Managed the permitting process for a CHP plant under BImSchG
- Integrated a quality management system in accordance with ISO 9000ff.
Deputy Head of Duisburg Lubricant Plant
FINA Deutschland
- Optimization of filling technology and tank systems with pneumatic controls
- Supervision of construction of a level indicator for the tank farm
- Development and implementation of a computer system for transport logistics, production planning and control (PPS), and booking program, including inventory
- Coordination between the IT department and users
- Support for the introduction and certification of a quality assurance system (ISO 9002)
- Coordination between development and manufacturing, preparation of documentation and manuals, as well as job descriptions
- Preparation of annual financial statements
- Support for the SAP implementation and review of data transfer
- SAP-based cost controlling
- Responsibility for occupational safety in operational and administrative areas
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Manufacturing, Chemical, Automotive, Energy, Utilities, and Food and Beverage.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Operations, Procurement, Logistics, Quality Assurance, and Production.
Skills
Project Management
Energy Management
Plant Engineering
Factory Planning
Fire Protection
Automotive
Wastewater Technology
Occupational Safety
Quality Assurance
Windows Office
Ms Project
Autocad
Sap
Various It Systems
P&Ids
Languages
Education
Fachhochschule Bochum
Diplom-Ingenieur Maschinenbau, Fertigungstechnik · Mechanical Engineering · Bochum, Germany
Ausbesserungswerk der Deutschen Bundesbahn
Training as a Machine Fitter · Machine Fitter · Duisburg, Germany
Certifications & licenses
TÜV Süd
Energy Manager
TÜV Saarland
Bundesanstalt für Arbeitssicherheit
Statistics
Experience
Expertise
Qualifications
Frequently asked questions
Have questions? Find more information here.
Hans-Werner is based in Weiskirchen, Germany.
Hans-Werner speaks the following languages: German (Native), English (Advanced).
Hans-Werner has at least 23 years of experience. During this time, Hans-Werner has worked in at least 19 different roles and for 18 different companies. The average length of individual experience is 1 year and 1 month. Note that Hans-Werner may not have shared all experience and actually has more experience.
Based on recent experience, Hans-Werner would be well-suited for roles such as: Green Steel Project Management, Production Relocation Project Management, Project Management for Air Suspension, Steering and Airbag Components.
Hans-Werner's most recent position is Green Steel Project Management at Saar Stahl.
In recent years, Hans-Werner has worked for Saar Stahl, FRT Camtek, Poppe/Veritas Gießen-Gelnhausen, Voestalpine Annweiler am Triefels, and TESA Werk Hamburg.
Hans-Werner is most experienced in industries like Manufacturing, Chemical, and Automotive. Hans-Werner also has some experience in Energy, Utilities, and Food and Beverage.
Hans-Werner is most experienced in business areas like Project Management, Operations, and Procurement. Hans-Werner also has some experience in Logistics, Quality Assurance, and Production.
Hans-Werner has recently worked in industries like Manufacturing, Automotive, and Chemical.
Hans-Werner has recently worked in business areas like Project Management, Procurement, and Operations.
Hans-Werner holds a Bachelor in Mechanical Engineering from Fachhochschule Bochum.
Hans-Werner has 3 certificates. These include: Fire Safety Officer, Energy Manager, and Occupational Safety Engineer.
Hans-Werner will be available full-time from February 2027.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 6 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Green Steel Project Management
Nearby freelancers
Professionals working in or nearby Weiskirchen, Germany