Hans-Werner (Werner) Mahlke-Project Management Green Steel

Check rate
Experience
Project Management Green Steel
Saar Stahl
- Conversion of furnace heating from coke gas to natural gas and subsequent changeover to a natural gas/hydrogen blend
- Utility supply and piping work (compressed air, cooling water, gas supply, electrical installation)
- Procurement and negotiations with suppliers
- Reporting to management
- Creation of layouts and project plans in MS Project
- Budget planning and monitoring
- Creation of various requirement and specification documents
- Topics: steel production, blast furnace, rolling mill, gas burner, hydrogen
Project Management Production Relocation
FRT Camtek
- Managed the project for relocating the production/assembly of surface measurement devices from Bergisch Gladbach to Rösrath
- Utility supply and piping work (compressed air, cooling water, vacuum, electrical installation)
- Procurement of cleanrooms and a temporary cleanroom tent
- Reporting to management
- Creation of layouts and relocation planning
- Budget planning and monitoring
- Project planning in MS Project
- Coordination with structural engineers and architects for the office building
- Creation of various requirement and specification documents
- Acceptance of all trades
- Negotiations with suppliers
Project Management Production Relocation
Poppe/Veritas Gießen-Gelnhausen
- Set up injection molding production in a rented hall, including infrastructure and departments (toolmaking, workshop, production, office)
- Utility supply and piping work (compressed air, cooling water, vacuum, emergency cooling, electrical installation)
- Reporting to management
- Planning of conveyor technology
- Creation of layouts and relocation planning
- Budget planning and monitoring
- Project planning in MS Project
- Knowledge of HOAI phases 2–8 and coordination of specialist planners
- Creation of various requirement and specification documents
- Selection of assembly and specialist companies as well as negotiations with suppliers
- Topics: fire protection, energy management, change of use, acceptance of all trades
Project Management Aircraft Landing Gear, Steering and Airbag Components
Voestalpine Annweiler am Triefels
- Product development from concept phase to technical implementation/series production
- Review and approval of requirement and specification documents
- Special machine construction for production systems
- Production management and schedules in MS Project and Excel
- Maturity tracking as well as cost tracking and budget preparation
- Customers: Tesla, Bilstein and BMW
Permitting Management
TESA Werk Hamburg
- Development of the necessary approval steps for a new paste production
- Application of the German Federal Immission Control Act (BImSchG)
- Preparation of building permit applications
- Fire protection measures
Project management for relocation projects and production relocation
Hitachi-ABB Hanau
- Planning and implementation of the move from Hanau to Karlstein
- Conversion of a logistics hall into a production site (4,500 m²)
- Utilities supply and piping work (compressed air, air conditioning)
- Plant engineering (test benches for switchgear, high-current test system, crane systems)
- Reporting to the management
- Creation of layouts, schedules, and project plans (MS Project)
- Budget planning and monitoring
- Knowledge of HOAI phases 2–8, coordination of specialist planners
- Creation of various requirement and specification documents
- Selection of assembly and specialist companies as well as negotiations with suppliers and the landlord
Authority engineering / saving wastewater costs in car wash systems
Diverse tenants nationwide
- Applying for the diverted water volumes with water authorities
- Recording the site conditions on location
- Preparing reports on evaporation
- Authority engineering and negotiations
- Multi-project coordination
Project management for various relocation projects and production relocation Materion
Heraeus Hanau
- Planning and implementation of expansion measures as part of "Vision 2020"
- Construction of a new hall (10,000 m²) in Alzenau and setup of the new production
- Plant engineering (target production, casting systems, melting furnaces, bonding)
- Piping work / utilities supply (closed cooling circuit with emergency cooling, compressed air, gas line)
- Reporting to the management
- Construction supervision and spatial changes
- Knowledge of HOAI phases 2–8, coordination of specialist planners
- Creation of layouts, requirement and specification documents
- Relocation planning, budget planning and monitoring as well as budget requests
- Schedules and conveyor technology
- Selection and negotiation with assembly and specialist companies
Project management for the reorganization of a vacuum brazing production
Mahle-Behr Mühlacker
- Reorganization of the vacuum brazing shop for air-oil coolers in the automotive industry
- Creation of layouts
- Budget planning
- Plant engineering: vacuum brazing system and conversion of a cooler test system (leak test, helium as test medium)
- Consolidation of two block manufacturers into one
- Creation of requirement and specification documents
- Selection of assembly company and negotiations with suppliers including price negotiations and SAP ordering
Project management glazing and plastic overmolding
Richard Fritz Besigheim
- Product development from the concept phase to technical implementation/series production
- Review and approval of requirement and specification documents
- Schedules in MS Project and Excel
- Maturity tracking and approval of drawings
- Cost tracking and customer support (Volkswagen, Seat, Skoda)
- Development of gauge and measurement concepts
Project Management Relocation of Knitting and Fabric Dryer Frames
Freudenberg Weinheim
- Relocation of 19 knitting machines and tenter frames from Iserlohn to Weinheim
- Added fabric dyeing and rewinding (knitted core to dye beam)
- CAD drawings and layouts
- Process transfer and construction supervision
- Piping construction (soft water supply, gas connection, cooling water, compressed air)
- Plant engineering: dyeing plant, tenter frames, rewinders, knitting machines
- Planning of dyeing plant, tenter frames and knitting area
- Process development for fabric dyeing and kappa calculation
- Preparation of requirement specifications and functional specifications
- Selection of relocation company and supplier management
- Scheduling in MS Project
- Infrastructure: building extension, utilities, climate control, crane runway
Project Management Planning of a Annealing Furnace for Anthracite Refinement
Rheinfelden Carbon
- Planning of an anthracite annealing furnace
- Preparation of CAD drawings
- Construction supervision and spatial changes
- Budget planning and obtaining quotes
- Negotiations with suppliers including price negotiations
Project Management Construction of a Production Plant in Russia and India
SAARGUMMI International
Setup of a new production plant for seals in Tutaev (Russia) and India
Optimization of production structures in existing plants
Plant engineering for extrusion lines and finishing
Piping construction (compressed air, gas)
Setup of the first extrusion line, ordering of equipment for the second line
Preparation of tool lists for four Ford projects and procurement of production equipment
Plant utilization studies and transport organization including customs clearance
Setup through the first pre-series delivery and run at rate
For India: preparation of layouts and obtaining quotes from suppliers
Project Management Plant Engineering - Food Industry
Cargill Salzgitter
- Expansion of the oil mill from 1,400 t/d to 2,000 t/d within six weeks
- Planning and preparation of requirement specifications as well as supplier selection
- Purchasing negotiations and handling of order confirmations and invoices
- Handling of hazardous materials and explosion protection (hexane)
- Scheduling and adherence to deadlines
- Complete utilities supply (gas, water, electricity, compressed air)
- Occupational safety rules in explosion-protected areas
- Piping construction and handling of P&ID diagrams
- Site supervision and logistics
Project Management Plant Engineering
H.C. Starck Goslar
- Modernization of a rotary kiln
- Relocation and expansion of a cooling system
- Relocation and expansion of boron molded part production
- Cost responsibility and preparation of requirement specifications
- Supplier selection and new purchase of capital goods
Project Management Plant Engineering Production Relocation Rail Superstructure
SAARGUMMI International
- Relocation and addition of equipment to a new hall after the sale to Vossloh
- Cost-conscious planning and procurement of new presses, formers, and tempering ovens
- Purchasing negotiations and handling of order confirmations
- Ensuring utilities supply (gas, water, electricity, compressed air)
- Obtaining BImSchG permits and hazard analyses
- Logistics and minimization of production downtime
- Quality assurance
- Relocation of production equipment to subsidiaries in the Czech Republic and Slovakia
Project Management & Project Management Plant Engineering
SAARGUMMI International
- Planning of a 25,000 m² plant for rubber production in Tutaev (Russia)
- Supplying the surrounding automotive industry with rubber profiles
- Ordering suppliers and service providers
- Purchasing negotiations and energy connections
- Fire protection, cooling system, workshop setup
- Quality assurance and obtaining operating permits
- Planning of five extrusion lines, a mixer line, hydraulic presses, and an Auma
Project Management & Project Management Plant Engineering Mixer Line
SAARGUMMI International
- Construction of a mixer line for the production of a rubber semi-finished product (costs: €3.7 million)
- Management and coordination (mixer, three rolling mills, strainer, sheet cooling system, weighing system)
- Expansion of the silo system and control via Siemens S7
- Supplier management and schedule coordination
- Preparation of specifications, orders, supplier selection
- Purchasing negotiations, cost control, and invoice processing
- Documentation and drawing management with AutoCAD
- Construction supervision and obtaining all permits (building permit, emission report under BImSchG)
- Commissioning of hydraulic presses and measurement and control technology
Project Management & Project Management
Speedoil Haag
- Optimization of filling technology, warehousing, and tank technology
- Supplier management and cost calculation
- Schedule coordination and control
- Commissioning and handover
- Team coordination (purchasing model making, sales, design, QM, testing department, series production)
Project Management & Project Management
FINA Mineralöl / Aral AG
- Approval process for a CHP plant under BImSchG
- Integration of a quality management system according to ISO 9000 et seq.
Deputy Head of Lubricants Plant Duisburg
FINA Deutschland
- Optimization of filling technology and tank systems with pneumatic control
- Construction supervision for a level indicator for the tank farm
- Development and introduction of a computer system for transport logistics, PPS, and booking software incl. inventory
- Coordination between the IT department and users
- Support with the introduction and certification of a quality management system (ISO 9002)
- Coordination between development and production, creation of documentation and manuals as well as job descriptions
- Preparation of annual financial reports
- Support for the SAP introduction and checking of data transfer
- SAP-based cost controlling
- Responsibility for occupational safety in the commercial and administrative areas
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Manufacturing, Chemical, Automotive, Energy, Utilities, and Food and Beverage.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Operations, Procurement, Logistics, Quality Assurance, and Production.
Skills
Project Management & Project Management
Energy Management
Plant Engineering
Factory Planning
Fire Protection
Automotive
Wastewater Technology
Occupational Safety
Quality Assurance
Windows Office
Ms Project
Autocad
Sap
Various It Systems
P&Id Flow Diagrams
Languages
Education
University of Applied Sciences Bochum
Dipl.-Ing. Mechanical Engineering, Production Engineering · Mechanical Engineering · Bochum, Germany
Repair Works of the German Federal Railway
Apprenticeship as a machine fitter · Machine Fitter · Duisburg, Germany
Certifications & licenses
TÜV Süd
Energy Manager
TÜV Saarland
Federal Institute for Occupational Safety
Statistics
Experience
Expertise
Qualifications
Profile
Frequently asked questions
Have questions? Find more information here.
Hans-Werner is based in Weiskirchen, Germany.
Hans-Werner speaks the following languages: German (Native), English (Advanced).
Hans-Werner has at least 23 years of experience. During this time, Hans-Werner has worked in at least 19 different roles and for 18 different companies. The average length of individual experience is 1 year and 1 month. Note that Hans-Werner may not have shared all experience and actually has more experience.
Based on recent experience, Hans-Werner would be well-suited for roles such as: Project Management Green Steel, Project Management Production Relocation, Project Management Aircraft Landing Gear, Steering and Airbag Components.
Hans-Werner's most recent position is Project Management Green Steel at Saar Stahl.
In recent years, Hans-Werner has worked for Saar Stahl, FRT Camtek, Poppe/Veritas Gießen-Gelnhausen, Voestalpine Annweiler am Triefels, and TESA Werk Hamburg.
Hans-Werner is most experienced in industries like Manufacturing, Chemical, and Automotive. Hans-Werner also has some experience in Energy, Utilities, and Food and Beverage.
Hans-Werner is most experienced in business areas like Project Management, Operations, and Procurement. Hans-Werner also has some experience in Logistics, Quality Assurance, and Production.
Hans-Werner has recently worked in industries like Manufacturing, Automotive, and Chemical.
Hans-Werner has recently worked in business areas like Project Management, Operations, and Procurement.
Hans-Werner holds a Bachelor in Mechanical Engineering from University of Applied Sciences Bochum.
Hans-Werner has 3 certificates. These include: Fire Protection Officer, Energy Manager, and Occupational Safety Engineer.
The availability of Hans-Werner needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 7 Sep 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Project Management Green Steel
Nearby freelancers
Professionals working in or nearby Weiskirchen, Germany