Thorsten Henneberg-Construction, Sales and Project Manager SiGeKo
Check rate
Experience
OCM (Overall Site Manager) for HVAC
Engie Deutschland GmbH
- Overall planning and supervision of HVAC and sanitary installations across multiple construction phases.
- Leading installation teams and subcontractors.
- Ensuring adherence to schedules, budgets and quality standards.
- Coordination with other trades.
- Lean Construction Management, preparation and facilitation of the Last Planner method.
- Support in scheduling and facilitation of workshops in an IPA project environment.
- Planning, organizing and overseeing all HVAC and sanitary work on site.
- Managing in-house technicians and coordinating subcontractors.
- Ensuring all work meets quality standards, safety regulations and the project timeline.
- Liaising with other trades, authorities and the client representative.
- Preparing plans and reviewing billing.
- Monitoring the correct application of construction techniques and compliance with safety regulations.
Technical Site Manager Piping
Exyte Deutschland GmbH
- Reviewing plan documents in service phases 4 and 5.
- Lean Construction Management.
- Managing, coordinating and controlling piping subcontractors.
- Supervising assembly, isometrics, supports, welding and testing.
- Interface coordination with building services, construction, electrical and GMP-related trades.
- Quality assurance, progress monitoring and reporting.
- Participating in site walks, coordination meetings and approvals.
- Ensuring execution according to plans, specifications and safety requirements.
Construction Manager High-rise and TGA Coordinator on Client Side
Beiersdorf AG
- Refurbishment and expansion of an existing office complex for 400 employees.
- Renovation for a new company medical department (BÄD).
- Conversion and gutting of the old cafeteria into a modern fitness center with 21 showers for all staff.
- Construction management of high-rise works and TGA coordination on the client side.
- Lean Construction Management, preparation and facilitation of the Last Planner method.
- Support in scheduling and facilitation of workshops in an IPA project environment.
- Managing, advising, supervising and coordinating on-site work.
- Conducting risk assessments and planning, preparing and executing safety measures.
- Conducting and documenting site meetings.
- Collecting and evaluating technical proposals and coordinating with construction and project management.
- Reviewing plan documents for service phases 4 and 6.
- Providing operational support in defect management and document review.
- Independently creating, preparing and evaluating tenders.
- Reviewing measurements for price differences and billing for completeness and traceability of quantities, reducing according to VOB.
- Correspondence according to VOB (notices of delay, defects, cleanliness, site staffing, HSE violations).
- Participating in and leading site meetings.
- Completing and revising Beiersdorf AG documents.
HSE Officer and Subproject Manager for Owner Representation Fire Protection and Utility Systems
Landesbetrieb LBB Weilerbach
- Owner representation for fire protection and utility systems in the construction of the US hospital on the Ramstein Air Force base.
- Total project cost approx. €898 million.
- Supervising the organizational, technical and economic progress of the US military hospital project.
- Reviewing plan documents in service phases 4 and 5.
- Managing two technical centers and overall supply, including a 10 MW CHP plant.
- Verifying the fire protection concept.
- Planning and controlling district heating and gas supply stations, including route planning, pipeline installation and heat and gas transfer stations.
- Lean Construction Management, preparation and facilitation of the Last Planner method.
- Support in scheduling and facilitation of workshops in an IPA project environment.
Construction Manager TGA/High-rise, Building Automation, Instrumentation and Fire Protection
VTU-Ingenieure
- Refurbishment projects for Roche Pharmaceuticals in Penzberg (Magnet Particle Roche Molecular Diagnostics, projects MGP2 and Nukl2).
- Executed an extensive refurbishment including gutting within a 10-month construction period.
- Lean Construction Management and TGA/high-rise construction management, building automation, instrumentation and fire protection.
- Total project cost approx. €65 million.
- Managing and supervising two refurbishment measures (service phase 8) and plant shutdowns across all project phases (study, planning, execution).
- Main on-site contact for the construction management team of the general planner and subcontractors.
- Planning, scheduling and monitoring of timelines.
- Construction of new cleanrooms and supervising installation and handover until commissioning.
- Clarifying interfaces between users, external companies, general planner and authorities.
- Cost and change management.
- Organizing and conducting site inspections and approvals.
- Quality control and assurance.
- Lean Construction Management, preparation and facilitation of the Last Planner method.
- Support in scheduling and facilitation of workshops in an IPA project environment.
- Reviewing and approving measurements.
- Ensuring compliance with site regulations and risk management.
- Leading project teams with responsibility for resources, quality, schedules and budget.
- Participating in procurement activities.
Fire Protection Site Manager and HSE Coordinator
Baker Hicks AG
- Fire protection site manager and HSE coordinator for the new BDC Biberach - G131 building for the pharmaceutical company Boehringer Ingelheim.
- Total project value approx. €420 million.
- Fire protection site management including penetration planning and documentation for official approvals.
- Responsible for fire protection in heating, ventilation, air conditioning, and electrical.
- Claims management and defect management.
- HSE coordination.
- Coordinative consulting and support in preparing escape and rescue plans.
- Conducting safety briefings.
- Routine safety walks (several times daily) with written documentation and initiating or coordinating the resolution of HSE issues.
- Collaboration with the client's HSE coordinator and safety coordinator.
- Checking vehicles, machines, tools, and equipment to ensure optimal readiness.
- Participation in weekly HSE inspections with the client, safety coordinator, and Baker Hicks HSE.
- Monitoring and, if necessary, conducting toolbox meetings.
- Ensuring client HSE requirements and supporting Baker Hicks employees.
- Training and instruction for aerial work platforms (boom lifts and scissor lifts) according to DGUV SR100-500 chap. 2.10.
- Construction supervision for cleanrooms according to DIN EN ISO 14644-1.
- Monitoring the cleaning of rooms and handing them over to the client.
- Starting and documenting test runs.
- Lean Construction Management, preparation and facilitation of the Last Planner Method.
- Supporting scheduling and moderating workshops in the IPA project environment.
M&E Project Manager and HSE Officer
Zetcon AG
- M&E project manager and HSE officer for the expansion of a tram tunnel in Karlsruhe.
- New construction of a tram tunnel spanning 3.6 km with 7 stations and 21 elevators.
- Shell construction cost approx. €587 million.
- Interior finishing cost approx. €452 million.
- Checking planning by M&E design offices for DIN compliance, clash-free integration with other trades, and economic efficiency.
- Preparing reports on the planning review.
- Monitoring planning schedules.
- Conducting regular planning meetings, including report writing.
- Drafting and reviewing M&E specification documents for completeness and cost efficiency, and preparing review reports.
- Independently monitoring schedules and performing functional-technical checks on M&E trades and full interior fit-out (heating, ventilation, cooling/air conditioning, elevators, sanitary, high/low voltage, building automation).
- Creating defect reports for each trade.
- Conducting fire protection inspections, documenting and reporting execution defects.
- Regular inspections, documentation, and preparation for expert acceptance of fire protection for M&E systems and the entire building.
- Meetings with specialist firms and experts in fire protection, especially for custom solutions.
- Carrying out shaft inspections and checks with subcontractors, preparing and sending acceptance reports.
- Conducting pipeline inspections and creating corresponding reports.
M&E Site Supervisor as General Planner, HSE Officer, Fire Protection Site Manager
pki Ingenieure
- M&E construction supervision as general planner for the new dm headquarters in Karlsruhe-Durlach (about 2,000 employees) and a new parking garage with 1,500 spaces.
- M&E project value approx. €65 million, total project value approx. €125 million.
- New office and administrative buildings.
- Responsible for ventilation, air conditioning, cooling, sanitary, sprinkler systems, and fire protection.
- Monitoring schedules and performing functional-technical checks on M&E trades (heating, ventilation, cooling/air conditioning, sanitary).
- Creating defect reports.
- Carrying out shaft inspections and checks with subcontractors, preparing and sending acceptance reports to subcontractors and site managers.
- Conducting fire protection inspections, documenting and reporting defects.
- Preparation for expert acceptance of fire protection for M&E systems and the entire building.
- Meetings with specialist firms and fire safety experts, especially for special solutions.
- Conducting pipeline inspections and creating corresponding acceptance reports.
- Creating a maintenance schedule for M&E trades and instructing users.
- Creating documentation and adapting the revision plan for M&E trades.
M&E Project Manager including Instrumentation & Control, Building Automation, and Electrical (General Contractor)
Züblin AG
- M&E project management for general contractor new construction of a 99-unit residential building and an office/commercial building in Karlsruhe, and two 98-unit residential buildings in Heidelberg.
- Project in Karlsruhe: approx. €34 million.
- Projects in Heidelberg: approx. €52 million.
- Projects with CHP and transformer station, built to passive house standard with enhanced fire protection.
- Reviewing M&E design office plans for DIN compliance, clash-free integration with other trades, and cost effectiveness.
- Preparing reports on planning reviews.
- Monitoring planning deadlines.
- Conducting regular planning meetings, including report writing.
- Drafting and reviewing M&E specification documents for completeness and cost effectiveness, preparing review reports.
- Lean Construction Management, preparation and facilitation of the Last Planner Method.
- Supporting schedule planning and moderating workshops in the IPA project environment.
- Independently monitoring schedules and performing functional-technical checks on M&E trades (heating, ventilation, cooling/air conditioning, elevator, sanitary, high/low voltage, building automation).
- Construction supervision during the CHP installation in Karlsruhe.
- Creating defect reports, conducting fire protection inspections, and documenting defects.
- Regular inspections, documentation, and preparation for expert acceptance of fire protection for M&E systems and the overall building.
- Meetings with specialist firms and fire safety experts, especially for special solutions.
- Conducting shaft inspections and checks, preparing and sending acceptance reports to subcontractors and site managers.
- Conducting pipeline inspections and creating corresponding reports.
- Creating maintenance schedules for M&E trades and instructing users.
- Preparing documentation and adapting revision plans.
- Preparing reports, review reports, schedules, defect and acceptance reports, maintenance schedules, documentation, and revision plans.
Overall Project Manager and Planning Coordinator (GP/Client)
Ingenieurbüro Jansen
- Overall project management and planning coordination for the new build and renovation of the REWE logistics center in Buttenheim.
- Project value approx. €28 million.
- Responsible for foundation work, civil engineering, concrete and hall construction, interior fit-out, HVAC, and M&E.
- Preparing coordination and schedule plans for design and execution.
- Preparing defect notices in accordance with VOB.
- Lean Construction Management, preparation and facilitation of the Last Planner Method.
- Supporting scheduling and moderating workshops in the IPA project environment.
- Leading construction meetings.
- Independently monitoring deadlines for design and construction services.
- Functional-technical checks on the execution of new and renovation works for all trades (concrete construction, hall building, full interior fit-out, and M&E trades such as heating, ventilation, cooling/air conditioning, elevator, sanitary, high/low voltage, building automation).
- Creating defect reports.
- Conducting shaft inspections and checks, preparing and sending acceptance reports to subcontractors and the client.
- Conducting pipeline inspections and creating corresponding reports.
- Creating maintenance schedules for M&E trades and instructing users.
- Preparing documentation and adapting revision plans.
Project Manager for Building Services (General Planner)
Ingenieurbüro Goedde
- Project management of building services (TGA) as general planner for the new construction and renovation of Bremen Mitte Hospital.
- Focus on defect management in interior fit-out and HVAC/building services.
- Partial commissioning of installations and managing conflicts and acceleration in project management.
- Project's construction sum approx. €75M.
- Preparation of component lists according to VDI, DIN and safety requirements.
- Site supervision for the new operating rooms and labs in various building sections, including clean rooms according to DIN EN ISO 14644-1.
- Initiation and implementation of acceleration measures.
- Project management and partial building commissioning according to HBO.
- Creation and handling of defect notices for individual trades.
- Controlling and release of defect-free construction sections.
- Coordination of site managers and contractors.
- Correspondence under VOB with subcontractors and clients.
- Rejection and approval of change orders including correspondence.
- Preparation and execution of acceptance inspections with experts.
Project Manager for Building Services (General Contractor)
Real Innenausbau AG
- Project management of building services as general contractor for the renovation and modernization of the former Allianz headquarters on Weserstraße for Deutsche Bank.
- Defect management for interior finishing, HVAC and building services.
- Commissioning of all systems.
- Renovation of the entire office building in terms of building services and interior finishing according to the new operator's specifications.
- Construction budget approx. €23.6M.
- Reviewing plans from building services planning firms for DIN compliance, clash-free coordination with other trades and cost efficiency.
- Creation of reports for plan reviews.
- Scheduling oversight of planning steps.
- Conducting regular planning meetings including minutes.
- Preparing and checking specifications from building services planning firms for completeness and cost efficiency, including preparation of review reports.
- Surveying the entire existing building and checking for function and safety.
- Creating component lists according to VDI, DIN and safety requirements that no longer need approval.
- Conducting fire safety inspections, recording and reporting defects in execution.
- Preparing for expert acceptance of fire safety for building services systems and the entire building.
- Meetings with specialist companies and experts in fire safety, especially for special solutions.
- Overall project management and building commissioning according to HBO.
- Creation and handling of defect notices for trades.
- Controlling and release of defect-free construction sections.
- Coordination of site managers and executing companies.
- Cost controlling and correspondence under VOB with subcontractors and clients.
- Rejection and approval of change orders.
- Preparation and execution of inspections with experts.
Technical Director and Sales Manager
Deutsche Haus AG
- Technical director and sales manager of the joint-stock company.
- Scheduling oversight of planning steps.
- Conducting regular planning meetings with minutes.
- Preparing and checking specifications for completeness and cost efficiency, including review reports.
- Independently negotiating with building material suppliers, craft businesses, manufacturers, banks and insurers.
- Creating the master data for the costing software and defining cycle times.
- Training employees in the costing department.
- Determining which components appear in the offer at which development stage.
- Structuring fixed prices.
- Self-training in modern heating technologies (solar, biomass, geothermal, brine drilling), modern house design, economic and ecological construction methods, BUS technology in residential construction, insulation of exterior and interior walls, effective roof insulation, photovoltaic in residential construction.
- Creating sales kits for field service with price lists and demonstration materials.
- Creating training materials and independently training field staff.
- Conducting and evaluating candidate interviews.
- Customer consulting and house sales, supporting field service with closings.
- Putting together financing solutions for residential construction and training employees.
- Preparing construction sites.
- Negotiating with utility companies.
- Drafting contracts for craftsmen.
- Creating construction schedules.
- Monitoring incoming payments.
- Checking and approving invoices.
- Creating target-actual comparisons in the area of construction time.
Site Manager and Coordinator for Fire Damage Restoration
Ars-Mobi-Bausystem
- Site manager and coordinator for a complete fire damage restoration for an architecture firm in Bad Kreuznach.
- Restoration of a residential house and a warehouse.
- Construction cost approx. €0.95M.
- Preparing additional tenders and construction management for the fire restoration.
- Listing components with defects.
- Cost breakdown of the restoration measure with individual costs.
- Developing a restoration concept according to the surveyor's specifications.
- Creating a schedule with trade timelines.
- Controlling individual trades and approving the work.
- Reporting to the insurance company.
Project Manager for Steel Construction, Concrete Construction, Foundation Work, Civil Engineering and Building Services
Ars-Mobi-Bausystem
- Construction manager and project leader for an investor from Bad Kreuznach.
- Overall construction project to build an office and exhibition building with underground parking and park area in Grolsheim.
- Construction cost approx. €10M.
- Internet research and acquisition of subcontractors.
- Reviewing plans from building services, steel construction, interior fit-out and civil engineering planning offices for DIN compliance, clash-free integration and cost efficiency.
- Creation of protocols for plan reviews.
- Scheduling oversight of planning steps.
- Conducting regular planning meetings with minutes.
- Preparing and independently conducting negotiation meetings with subcontractors, suppliers and service providers.
- Billing and measurements under VOB.
- Correspondence with subcontractors under VOB.
- Advising the client on company selection and choosing subcontractors and service providers.
- Preparing tenders according to VOB and valid DIN standards using AVA software based on quantity data from planning documents and construction management.
- Sending out tender documents.
- Drafting and preparing contracts between the client and subcontractors, suppliers and service providers.
- Invoice review and payment approval.
- Developing a fire safety concept with specialists and adapting all building services work to this concept.
Project Manager for civil engineering, concrete construction, structural steel construction, special structures, sprinkler
Ars-Mobi-Bausystem
- Project management for an architecture firm in Bad Kreuznach.
- New construction of an office building with a separate apartment, an artist’s studio, and a warehouse in Bötzingen.
- Construction costs approx. €2.65 million.
- Further development of a patented steel construction system focusing on optimization and cost efficiency.
- Preparation of a detailed project description as a room book.
- Reviewing plans from building services (TGA) planning offices for DIN compliance, clash detection, and cost efficiency, and creating corresponding reports.
- Monitoring the schedule of planning steps.
- Conducting regular planning meetings, including meeting minutes.
- Preparing and reviewing the specifications from TGA planning offices for completeness and cost efficiency, and creating review reports.
- Quantity surveying as a basis for performance descriptions.
- Preparing tenders according to VOB and relevant DIN standards using AVA software.
- Coordinating and aligning the specifications of all trades.
- Creating cost overviews with analysis of the contributions of involved specialists.
- Conducting online research and acquiring subcontractors.
- Soliciting, reviewing, and evaluating bids.
- Preparing and analyzing price comparison tables for each trade.
- Preparing and independently leading negotiation meetings with subcontractors, suppliers, and service providers.
- Preparing cost estimates according to DIN 276 and controlling costs.
- Checking and evaluating bids and price comparisons against special requirements.
- Drafting and preparing contracts between the client and subcontractors, suppliers, and service providers.
- Overseeing and coordinating the execution of work.
- Setting up and updating a project schedule.
- Keeping a construction log.
- Inspecting completed work, identifying defects, and supervising the correction of defects.
- Reviewing invoices and determining costs, as well as approving checked invoices.
- Listing warranty periods.
- Preparing, monitoring, and updating payment plans and detailed time, cost, or capacity plans.
- Organizing official approvals and participating in the release of performance guarantees.
- Compiling graphic and textual documentation.
- Creating as-built drawings.
- Preparing equipment and inventory lists.
- Monitoring the facility and managing it, supervising maintenance and service work.
- Project handover.
- Acting as safety and health coordinator (SiGeKo) throughout the entire construction period.
- Additional tender preparation and construction supervision for a fire remediation project, including a remediation concept.
- Tendering and on-site supervision of 28 trades.
Construction Manager – Site Supervision and Claims Management
Singer Tiefbau GmbH
- Construction manager for a medium-sized construction company with about 25 employees.
- Tasks in construction management, site supervision, claim management, general construction, civil engineering, and specialized civil engineering.
- Compiling quantities based on delivery notes and measurements of materials actually installed.
- Preparing and issuing progress invoices according to VOB based on updated quantity lists.
- Creating cost calculation bases for each tender position.
- Written notification of quantity increases according to VOB Part B § 2.3 (2) and quantity decreases according to VOB Part B § 2.3 (3) to the client.
- Attending site meetings.
- Negotiating contracts with clients and suppliers.
- Negotiating change orders.
- Handling correspondence between the client, subcontractors, and suppliers.
Construction Manager – Project Management and Change Management
Wittenberger Stahlbau GmbH
- Construction manager for a medium-sized steel construction company with about 120 employees.
- Providing consulting services with focus on organizational restructuring.
- Analyzing mechanical work processes.
- Reviewing and analyzing the internal and external communication network.
- Reviewing and evaluating the existing handbook according to ISO 9001.
- Managing the purchasing and estimating departments.
- Advising on the introduction of an electronic estimating software.
- Managing the goods receiving and dispatch department.
- Assessing staff on their knowledge of DIN standards and VOB regulations.
- Managing the reporting to senior management.
- Reviewing reports and notifications from the executing company.
- Acquiring new potential clients and presenting to new customers.
- Overseeing new construction projects in southern Germany and leading their project management.
- Conducting contract, change order, and bid negotiations for future construction projects.
- Winning new clients, including BMW Munich and Dingolfing.
- Selecting a new facility in northern Bavaria and recruiting new staff on site.
- Analyzing the planned vs. actual status of existing hardware and software.
- Designing and creating an online presence.
Preparation for self-employment
Self-employment
- Developing a business concept for self-employment.
- Defining key tasks and areas of activity.
- Planning and executing necessary purchases.
- Drafting a financing plan.
- Designing the company lettering (corporate identity).
- Designing marketing letters and preparing an advertising campaign.
- Coordinating with a tax advisor and a lawyer.
- Presenting the concept to the employment office and the trade licensing office.
Lead Project Manager and Project Coordinator
DC Promotion
- Overall project management and project coordination for commercial building projects including fire protection and full building services (TGA).
- Complete renovation of a nightclub in Vohenstrauß (capacity 1,500 people, renovation costs approx. €850,000).
- Development of an experience gastronomy concept over 4,000 m² with three independent areas.
- New construction of a restaurant with 200 seats and a 200 m² terrace area.
- New construction of a gaming arcade and a nightclub.
- Creating quantity surveys.
- Preparing tenders and contracts for various trades.
- Reviewing plans from building services (TGA) planning offices for DIN compliance, clash detection, and cost efficiency, and creating corresponding reports.
- Monitoring the schedule of planning steps.
- Conducting regular planning meetings, including creating minutes.
- Preparing and reviewing the specifications from TGA planning offices for completeness and cost efficiency, and creating review reports.
- Tendering, awarding contracts, and site management for steel construction, stair and railing construction, tiling, ceiling cladding, sanitary installation, sprinkler systems, locking and security technology including fire protection, interior fitting including upholstery work, interior and exterior painting, graffiti work, as well as bar counter new construction and conversion.
Field Sales Representative
GaLa 3000
- Field sales for a software company providing payroll and estimation programs.
- Preparation of payrolls.
- New customer acquisition and telemarketing.
- Software demonstrations at customer sites.
- Creation and handling of customer analyses.
Full-time Distance Learning IT Manager
Teleakademie Mediadesign
- Full-time distance learning program to become an IT Manager by tele-learning with project phases for implementing interactive websites.
- Theoretical focus on marketing, online marketing, concept design, project management, and implementing database-driven websites and e-commerce systems.
- Programming skills in HTML, Basic, and JavaScript.
- Use of MS Office products such as Excel, Access, Word, PowerPoint, Project, and Exchange Server.
- Project work to develop a portal for the Upper Palatinate ([link]) for an advertising agency.
- Project work to build an online platform about educational opportunities in Regensburg (displaying all school types) for the Regensburg school authority.
Turnkey Construction Project Manager
Kerler GmbH
- Project manager in turnkey construction (residential and industrial buildings) as general contractor.
- Total construction volume of managed projects approx. €560 million.
- Preparation of marketing activities and project acquisition.
- Contract negotiations and closing contracts with large companies, subcontractors, joint venture partners, suppliers, and banks for short- and long-term financing.
- Responsible for personnel and budget policies in the design and turnkey construction department.
- Development and preparation of offers and change order proposals.
- Preparation of target vs. actual analyses for each project, per team, per machine, and for the entire division.
- Training of commercial staff in electronic recording of quantities, hours, and materials.
- New development of the purchasing department and establishing new contacts with foreign clients.
- Scheduling and logistics for the company vehicle fleet.
- Scheduling and coordination of subcontractors and site managers.
- Review of all planning including building services planning for compliance with DIN standards, clash avoidance, and cost efficiency, and creation of minutes.
- Monitoring planning deadlines.
- Conducting regular planning meetings with minute-taking.
- Preparation and review of specifications from building services planning offices, creation of review reports.
- Leading and preparing weekly meetings with site managers, purchasing, marketing, and management.
- Preparation of documents related to receivables and legal disputes.
- Negotiations with lawyers in legal proceedings.
- Note: Kerler GmbH dissolved its turnkey construction department in July 1998 and filed for insolvency in December 1999.
Site Manager and Division Manager for Earthworks and Civil Engineering
Zeidler GmbH
- Site manager and from 02/1996 division manager for earthworks and civil engineering (general contractor).
- Project value of responsible projects approx. €260 million.
- Responsible for rebuilding the company in East Germany.
- Preparation of marketing activities and acquisition of new construction projects.
- Contract negotiations and signings with clients, subcontractors, and suppliers.
- Review of planning by building services planning offices for compliance with standards, clash avoidance, and cost efficiency, and creation of minutes.
- Monitoring planning deadlines.
- Conducting regular planning meetings with minute-taking.
- Preparation and review of specifications from building services planning offices, creation of review reports.
- Project planning and management with up to 150 staff and project volume up to €4 million.
- Staff recruiting.
- Responsible for project billing with the client.
- Planning, preparation, and implementation of new process technologies.
- Procurement of new equipment.
- Preparation of service offers.
- Drafting of subcontractor contracts.
- In-house training for commercial and technical staff.
- Creation and leadership of working groups.
- Preparation of network plans for the projects.
- Site management tasks until 02/1996: project responsibility for the entire division, negotiations and signings with subcontractors and material suppliers, scheduling, logistics and project management, preliminary and final cost calculation, quantity compilation, and invoicing for individual trades and complete projects.
Technical Field Service
Horn Leichtmetallbau
- Technical field service representative in industrial and commercial construction, steel construction, fire protection, and facade construction.
- Presentation of the Horn Group to developers, architects, general contractors, and housing associations.
- Following up on offers.
- Managing a sales territory in Saxony, Berlin, and Thuringia.
- Contract drafting.
- Conducting negotiations with clients.
Apprenticeship as Draftsman in Structural and Civil Engineering and Distance Learning to Become a State-Certified Building
Various Educational Institutions
- Apprenticeship as a draftsman in structural and civil engineering.
- Distance learning to become a state-certified building technician in structural engineering.
- 12 months of classes in English, business administration, personnel management, technical mathematics, computer science, and quality management, as well as other subject-specific courses.
- Specialization in the specific application area during the remaining 32 months.
- Obtained the state-certified technician diploma and the general entrance qualification for universities of applied sciences, granting access to a technical university or university.
- Authorized to submit building plans as a state-certified building technician.
- Areas of study: business administration, quality and project management, information technology and technical communication (IT systems, CAD, software), construction law/building design, construction operations (planning, execution, bidding), surveying (cadastral data, horizontal and vertical surveying), structural design and analysis (planning, calculations, verifications), building structures and reinforced concrete construction, building services (heating and energy technology, water supply), planning and design, work preparation and project planning, tender management, project management, quality assurance and testing, work and business organization, team leadership and personnel management.
Further Training in the Commercial Field
KSZ Commercial Training Center
- Further training at the commercial training center in Weiden.
- Acquired basic knowledge in purchasing (ordering, inventory management with IT, pricing, material and invoice verification, discounts, contract types with suppliers).
- Acquired basic knowledge in sales (pricing, contribution margin calculation, contract types with clients).
Service Mechanic and Installation Supervisor in Building Services Engineering including Fire Protection
König GmbH Equipment and Ventilation Construction
- Service mechanic and later installation supervisor in equipment and ventilation construction, building services engineering including fire protection.
- Work in industrial and plant engineering, petrochemicals, turbine manufacturing, and power plant construction as a general contractor.
- Independently carried out new installations in plant and piping construction according to drawing specifications.
- Maintenance of ventilation and air conditioning systems.
- Consulting and instructing customers on new installations.
- Managed clients such as BMW (Munich and Landshut, expansion of the logistics center with a high-bay warehouse), ELF in Speyer (renewal of a petrochemical plant in pump station and distillation unit areas), Siemens (new construction, maintenance, and repair of power plant and turbine facilities), and Linde AG (expansion of petrochemical facilities).
- Coordinated construction sites in Europe and the Arab countries (including Abu Dhabi, Riyadh, Hofuf, Ha'il, Ras al-Khaimah).
- Fabrication and on-site installation of large special steel structures, including professional installation of all building services engineering.
- Training of in-house and external staff.
- Independently negotiated with international clients in change order management.
- Measurement of quantities and work for further processing of interim invoices.
- Participated in courses for gas welding and arc welding according to DIN EN 287.1, certified as a pipe welder.
- Ended employment after a workplace accident.
Apprenticeship as Heating and Ventilation Mechanic
Keck
- Training as a central heating and ventilation mechanic.
- Learning installation, maintenance, and servicing of heating and ventilation systems.
- Basics of building services and control technology.
- Practical work on construction sites in heating and ventilation systems.
Industry Experience
See where this freelancer has spent most of their professional time.
Experienced in Construction, Energy, Real Estate, Chemical, Education, and Healthcare.
Business Area Experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Procurement, Quality Assurance, Operations, Sales, and Product Development.
Summary
Qualification Profile: Experienced project manager and site manager with decades of expertise managing complex high-rise, industrial construction and building services (TGA) large-scale projects. Proven in the technical overall coordination of planning, execution and commissioning while meeting the highest quality, safety and deadline standards. Familiar with owner representation, service phase reviews and coordinating demanding building systems such as cleanrooms, building automation and energy systems. As a reliable contact for authorities, international clients and general contractors, he ensures cost-effective, compliant and operational project results. Leads installation and subcontractor teams with clarity, structure and responsibility. Stands for technical excellence, proactive risk management and reliable project management throughout the entire lifecycle.
Core Competencies
- TGA & utility systems
- Overall project management
- Owner representation
- Schedule & quality control
- HSE & occupational safety
- Cleanroom & special technology
- Claims & contract management
- Planning & service phase reviews
- High-rise & industrial site management
- Commissioning & handover
- Risk management
- Cost & budget control
- VOB & tendering
Selected major projects:
- OCM HVAC large-scale project ENGIE: Overall site management for HVAC and sanitary across multiple phases, managing installation teams and subcontractors as well as quality and schedules for the timely completion of complex installations.
- Office, fitness and company medical areas refurbishment Beiersdorf AG: Construction management and TGA coordination during ongoing operation, tendering, defect and HSE control for compliant completion of high-traffic functional areas.
- New USA military hospital Ramstein, LBB Weilerbach (€898 million): Owner representation for fire protection and utility systems, reviewing service phases 4 and 5, coordinating technical centers and a 10 MW CHP plant to ensure full supply capability.
- Pharma refurbishment Roche Penzberg, projects MGP2 and Nukl2 (€65 million): TGA construction management, building automation, instrumentation and fire protection in existing building remodel with new cleanroom construction for on-time cleanroom commissioning.
- New build and refurbishment REWE logistics center Buttenheim (€28 million): Overall project management on both client and contractor side for shell, interior fit-out and complete TGA with coordination of all trades for full operational handover of the logistics site.
- Karlsruhe tram tunnel, Zetcon (shell €587 million, interior fit-out €452 million): TGA and HSE project management, plan review, fire safety inspections and approvals for a 3.6 km tunnel with 7 stations to deliver operational TGA and fire safety infrastructure.
- New dm headquarters Karlsruhe Durlach, pki Ingenieure (TGA €65 million, total €125 million): TGA construction supervision, HSE and technical fire protection management for office complex and parking garage up to expert approval and reliable TGA systems.
Skills
- High-Rise And Underground Construction, Landscaping (Gala) Construction, Special Foundation Work, Concrete Construction, Hvacr, Building Services (Tga), Fire Protection Officer Sigeko
- Overall Project Manager
- Construction And Project Management Of Building Services (Tga), Instrumentation And Control Including Building Automation, Fire Protection, Commissioning And Handover To Client
- Plan Coordinator, Client And General Contractor Side, Feasibility Checks, Oversight Of Design Offices
- Plan Review For Din Compliance
- Site Coordinator On Client Side For Complete Shell Construction Including Concrete Structure, Foundation Work And Hvacr
- Project Manager On Contractor Side For Shell, Interior Fit-Out, Hvacr
- Cleanrooms And Cleanroom Ceilings, Din En Iso 14644-1 To 9
- Construction Cost Estimation, Order And Bid Calculation
- Change Order Cost Calculation, Change Management
- Creating Construction Schedules With Ms Project
- Commissioning Of Building Services (Tga)
- Tendering With Ava Software And Stl-Bau
- Procurement And Awarding Of Subcontractor Services
- Billing Of Services According To Vob
- Correspondence Under Construction Law, Hoai, Vob And Din Standards
- Defect Management With Correspondence And Documentation
- Sales Of Construction Technology Products
- Sales Management And Staff Training
- Lean Construction Management
- Brz, Dalux, Bim Models, Ms Project
- Nemetschek
- Ariba Construction Software
- Rib Construction Software
- Residential Construction, Single-Family Houses To Housing Complexes
- Nightclubs And Gaming Arcades
- Warehouses, Nursing Homes, Residential Complexes
- Industrial Buildings/Facilities
- Office Buildings, Pharmaceutical Industry
- School Buildings
- Shopping Centers
- Substations
- Gas Compressor Stations
- Power Plant Construction
- Hospitals
- Hotel Complexes
- Vob And Din Standards And Austrian Construction Law (ÖNorm)
- Conflict Management
- Procurement
- Controlling
- Billing
- Tendering And Awarding
- Concrete Construction
- High-Rise Construction
- Underground Construction
- Complete Building Services (Tga) Including Fire Protection And Sprinkler And Fire-Fighting Systems
- Hvacr
- Industrial Construction
- Commercial Construction
- Petrochemicals
- Steel And Hall Construction
- Power Plant Construction
- Project Management
- Site Management
- Damage And Defect Management
- Numerous Ava Programs
- Ms Project
- Ms Office
- Bim Planning
- Ms Project
Languages
Education
Teleakademie Mediadesign
IT Manager · Munich, Germany
Building and civil engineering draughtsman; State-certified construction technician
Kaufmännisches Schulungszentrum
Commercial training · Weiden in der Oberpfalz, Germany
Certifications & licenses
SCC certificate (Safety Certificate Contractors)
Safety Management
RAB 30, Annex C for SiGe coordinators
Academy BauA
RAB 30, Annex B for SiGe coordinators
Academy BauA
Occupational safety knowledge
Academy BauA
Statistics
Experience
Global Experience
Expertise
Qualifications
Profile
Frequently asked questions
Have questions? Find more information here.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
Similar Freelancers
Discover other experts with similar qualifications and experience
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a OCM (Overall Site Manager) for HVAC
Nearby freelancers
Professionals working in or nearby Stadelhofen, Germany
