Experience
Project management proof of concept for the introduction of new DWDM technology
Deutsche Telekom
Sub-project management for the POC
Requirements for network management coupling
Coordination of internal project teams
Evaluation of lab and test results
Proof of concept
Validation of the technical specification
Preparation for RFQ
Personal break
Sabbatical / Personal break
- Personal break for professional and personal development
- Travel, further training, language course
- Strengthening intercultural communication, self-management and creativity
Program management FTTX rollout areas
PlusNet
Program management of FTTX projects at Plusnet
Process analysis and optimization for fiber optic projects
Route and backbone planning
Setup of test management
Coordination of network expansion
Analysis of work processes
Assessment of subcontractors regarding performance, approach and quality in fiber optic projects
Quality management
Training and testing
Building a fiber rollout process ready for scale
Process optimization of internal teams and their workflows
Requirements management for new IT tools for FTTX projects
Test management system
Project management for the basic infrastructure of the FTTH area Probstei
Westenergie
- Project management of the FTTH project for BZV Probstei
- Implementation of 6,500 FTTH connections, 2 POP locations, 122 NVT, 314 km route length
- Responsible for a project budget of approx. €35 million
- Coordination of network expansion
- Review of route planning
- Route review for environmental protection aspects (water protection, waste, nature reserves)
- Reporting to management
- Contract negotiations with subcontractors
- Coordination and negotiations with local politicians and authorities
- Approval of processes with the national road maintenance authorities
- Quality management
- Measurement review based on GIS files
Project management for the basic infrastructure of the FTTH area Angeln
Innogy SE
- Project management of the FTTH project for BZV Angeln
- Implementation of 5,500 FTTH connections, 8 POP locations, 570 km route length
- Responsible for a project budget of approx. €75 million
- Network planning
- Coordination of network expansion
- Route review for environmental protection aspects (water protection, waste, nature reserves)
- Reporting to management
- Contract negotiations with subcontractors
- Coordination and negotiations with local politicians and authorities
- Approval of processes with the national road maintenance authorities
- Quality management
- Measurement review based on GIS files
DWDM Network Planning Regional Network
Vodafone Kabel Deutschland
Management and planning of DWDM network expansion for the regional backbone networks
Network planning of DWDM capacities
Creation of the final planning in Vodafone Kabel Deutschland's PIA system
Coordination of internal and external subcontractors
Quality management
Reporting
Creation of additional gigabit capacities in the backbone rings through redesign and new planning of DWDM resources
Project Management Network Expansion New Development Areas
Vodafone Kabel Deutschland
Project management of network expansion
Route planning for new development areas
Review of the final planning
Commissioning of subcontractors
SAP purchasing processes
Coordination of internal and external subcontractors
Quality management
Reporting to management
Infrastructure development for new development areas
Project Management VPN Network Expansion for Hospital Locations
1&1 Versatel
Project management of the VPN project Paul-Gerhard-Diakonie
Fiber optic connections between two main data centers of PGD
Development of 45 additional sites with fiber optic and/or other connections
Implementation of a complex VPN network across all sites
Coordination of network expansion
Reporting to management
Coordination of internal and external subcontractors
Quality management
Training and testing
Building the infrastructure for PGD's VPN network
Direct connection between the main data centers via fiber optic
Interim Manager and Head of Network and Civil Engineering Department
Cableway Nord GmbH
Project responsibility from the tender phase to handover to the customer for new build activities, maintenance and repair tasks, as well as subsequent connection work
Environmental protection issues in civil engineering (water protection, waste, nature reserves)
Coordination and support of on-site activities with own employees and service providers
Calculation and preparation of offers
Tracking of KPIs and testing
Regular exchange with authorities, institutions and associations
Communication with clients as technical contact person
Responsibility for quality and occupational safety requirements
Monitoring project development in terms of deadlines and costs
Close cooperation with management
Efficient management of the civil engineering and network construction department
Increase in cost efficiency
Improvement of the specified KPIs
Project Management Basic Infrastructure FTTH Northern Germany
Deutsche Glasfaser GmbH
Project management of the FTTH project Schleswig-Holstein
Implementation of 23,000 FTTH connections
Responsible for about €6 million project budget per year
Environmental protection issues in civil engineering (water protection, dyke protection, nature reserves)
Planning of the fiber optic network
Coordination of network expansion
Reporting to management
Contract negotiations with subcontractors
Discussions and negotiations with local politicians and authorities
Approval of processes with the national road maintenance authorities
Quality management
Training
Building the infrastructure for "Fiber to the Home" FTTH for more than 10,000 buildings
Customer retention with speeds of up to 1000 Mbit/s
Service improvement through the use of own network infrastructure
Analyst
Takko Fashion
As-is analysis of the IT departments
Identifying optimization potential
Consulting and concept development
Requirements analysis and validation
Complete analysis and presentation of IT processes
Process improvements
Suggestions for a new tool landscape incl. migration
Project Manager Web-based Workorder Tool
Vodafone
Project management of an international Vodafone team
Consulting and concept development
Requirements analysis and validation
Quality management
Introduction of the tool
Training and test management
Project duration: 36 months
Project team: 25 international employees from 5 countries
Project Manager Introduction of IP-based mobile transmission devices
E Plus / Telefónica
Implementation of IP Mobile Access Devices at over 300 locations in Germany
Consulting and concept development
Coordination of specialist departments and external suppliers
Nationwide rollout in Germany
Testing
Project duration: 12 months
Project team: 25 employees
Project Manager FTTB test area HH Eimsbüttel
HanseNet/Telefonica
Project management and coordination of the introduction phase
Cost analysis
Creation of product specifications and tender documents
Contract negotiations
Requirements management (identification, formulation, validation)
Coordination of specialist departments and external suppliers
Management of civil engineering and network construction
Coordination of subcontractors
Service design and process management
Test management
Setup of a test area for FTTB for over 500 buildings
Pilot rollout for end customers with speeds of up to 100 Mbit/s
Service improvement and savings on network lease costs
Subproject Manager Process Management Database Netsite
HanseNet/Telefonica
Project management in the access area
Consulting and concept development
Coordination of specialist departments and external suppliers
Requirements analysis and validation
Quality management
Introduction of processes
Test management
Identification of ACCESS processes for the transition to a site database
Requirements gathering and formulation for implementation
Requirements Manager
NetCologne
Carrying out requirement prerequisites and analysis
Documenting work packages and effort estimates
Requirements documentation
Carrying out and leading testing
Project Manager for the introduction of IP DSLAM in the Greater Northern Germany area
HanseNet/Telefonica
Implementation of IP DSL access devices at 188 locations
Planning and provision of the infrastructure for triple-play applications
Increasing the utilization of IP technology up to the terminal
Use of VoIP in network nodes
Offering integrated products for customers
Project duration: 8 months
Project team: 15 employees
Senior Technician for Data Center Setup
Level(3) Communication
Technical manager of the data center
Requirements analysis for the operations manual
Emergency planning and security systems
Planning and establishment of the operations organization
Facility management
Project duration: 8 months
Project team: 20 employees
Environmental Protection Technician
Ingenieurbüro Garbade und Kastner
- Inspection of sewer systems for existing and new construction facilities and their acceptance
- Camera inspections, testing and reports of pipe systems
- Planning and implementation of small wastewater treatment plants
- Consulting on construction projects regarding environmental matters
- Water and surface water analyses
- Waste consulting
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Telecommunication, Construction, Utilities, and Fashion.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Quality Assurance, Information Technology, Operations, Procurement, and Research and Development.
Frequently asked questions
Have questions? Find more information here.
Sven is based in Mureck, Austria and can operate in on-site, hybrid, and remote work models.
Sven speaks the following languages: German (Native), English (Advanced).
Sven has at least 24 years of experience. During this time, Sven has worked in at least 19 different roles and for 16 different companies. The average length of individual experience is 1 year and 3 months. Note that Sven may not have shared all experience and actually has more experience.
Based on recent experience, Sven would be well-suited for roles such as: Project management proof of concept for the introduction of new DWDM technology, Personal break, Program management FTTX rollout areas.
Sven's most recent position is Project management proof of concept for the introduction of new DWDM technology at Deutsche Telekom.
In recent years, Sven has worked for Deutsche Telekom, Sabbatical / Personal break, PlusNet, Westenergie, and Innogy SE.
Sven is most experienced in industries like Telecommunication, Construction, and Utilities. Sven also has some experience in Fashion.
Sven is most experienced in business areas like Project Management, Quality Assurance, and Information Technology. Sven also has some experience in Operations, Research and Development, and Procurement.
Sven has recently worked in industries like Telecommunication and Utilities.
Sven has recently worked in business areas like Project Management, Quality Assurance, and Operations.
Sven holds a Bachelor in Mechanical Engineering from FHTW Berlin.
Sven has 3 certificates. These include: ITIL 3, Prince2 Foundation, and Prince2 Practitioner.
The availability of Sven needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 26 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Andreas A.
Last position:
Project Manager for Network and Infrastructure Project Migration EU/US/MEX at Klöckner & Co SE
- Implementation of a Network Access Control (NAC) security system at 106 locations in the USA, Mexico, and three European countries to safeguard facilities against cyberattacks.
- Management of infrastructure renewal in the core network in the USA and Mexico, transitioning to a new hardware provider.
- Optimization of LAN, WAN, and WLAN infrastructure, including division of network topology into dedicated VLAN segments for IT and OT separation.
- Development of project scope definition considering technical and organizational business requirements.
- Integration of local IT resources and external suppliers to capture functional, temporal, and financial requirements.
- Specification of work packages for US/EU NAC system implementation and modernization of the US core network.
- Acquisition of necessary approvals for project execution and budgeting from the board.
- Creation of rollout plans, inventory data collection, data validation, and drafting detailed project definitions.
- Development of a central project control application.
- Execution of pilot implementations to test developed solutions.
Thomas C.
Last position:
External Consultant to Program Management / SCRUM Master at MVV Energie AG / Soluvia IT Services GmbH
Streamline – Implementation of S/4 HANA Utilities in cooperation with Accenture
Advising and coaching the Program Lead (OPL)
Planning and supporting the execution of all organizational and technical activities to transition from SAP IS-U to SAP S/4 HANA Utilities
Communicating and coordinating with the stakeholders and committees involved (core team, program management, steering committee)
Project and process management
Coaching stream leads in the main project
Requirements management for connecting interfaces to connected systems (non-SAP systems)
Risk management
Resource and capacity planning
Advising the existing migration, testing, interface/connected systems, and training teams
Advising on the management of the SAP systems cutover
Planning and managing necessary post-migration activities, including verification, documentation, and corrections
Team coaching and servant leadership: Supporting one or more Scrum teams as a coach, facilitator, and servant leader
Promoting self-organization, personal accountability, and continuous improvement
Facilitating and continuously improving Scrum events (Daily, Planning, Review, Retrospective)
Ensuring compliance with Scrum values, principles, and practices
Identifying and actively managing impediments to maintain team productivity
Working with Product Owners, Agile Coaches, and leaders to resolve structural barriers
Supporting agile scaling in areas such as SAFe, LeSS, or Nexus
Helping shape agile transitions as part of MVV's digital strategy
Building an agile mindset across the organization through training, workshops, and leading by example
Working with other Scrum Masters and Agile Coaches in the company-wide Agile Chapter
IT systems: ERP: SAP IS-U, SAP S/4 HANA Utilities
Thomas P.
Last position:
Subproject lead for the program of the PM-Summit 2024 as a volunteer at PMI Germany Chapter e.V.
- Relaunch of the project management conference “PM-Summit” of PMI Germany Chapter e.V.
- Call for Papers and evaluation
- Onboarding of speakers
- Program composition
- Uploading the program to the website with presentation titles and speaker information
- Conducted the Call for Papers and completed and published the program
- Tools & technologies: Miro, MS Teams, Office
Thomas L.
Last position:
Interim Director of Telecommunications Operations at Plusnet
- Leading and restructuring operations departments
- Transforming into a digital ISP
- Managing support for telecommunications services (FTTx, xDSL, voice, DWDM, access)
- Network operations center (NOC)
- Managing customer satisfaction
Majk K.
Last position:
Program Manager Core, Aggregation, Edge Network 4.0 at Deutsche Glasfaser GmbH
- Roll-out of 12 core locations in Germany (covering core routers, route reflectors, border routers, CGNAT, Sedges)
- Roll-out of 40 aggregation locations in Germany (covering aggregation routers and BNG functionality)
- Roll-out of 230 edge locations in Germany (covering several edge routers per site)
- Network topology (re-) planning (core-to-core, core-to-agg, edge rings planning) including carrier management
- BNG (customer) migration to new network infrastructure including IT support
- Lawful interception and LIMS
- Network documentation with FNT Command, ServiceNow
- Network engineering handover to operations, process management
- Commercial and technological management, supplier management
- Management of architecture and design progress (HHLD, HLD, LLD)
Georg D.
Last position:
Senior Project Manager at Apleona GmbH
- Project review, restructuring and PM for the migration of a total of 12,000 Windows workstation systems (650 applications) from SCCM or Empirum/Matrix42 to MS-Intune following a merger.
- Took over a significantly delayed and poorly managed project in the role of “firefighter”.
- Completely revised and adjusted/updated the planning of the customer and the service provider involved.
- Introduced planning baselining and the recording/mitigation of current risks.
- Introduced an efficient, partly automated planning/reporting interface between MS-Project Planning (service provider) and Jira (customer).
- Restructured meetings to increase efficiency and eliminate redundant appointments.
- Completed the analysis and design phase and prepared basic data for migrations from the heterogeneous systems of the two merged companies.
- Started the User Acceptance Test (UAT).
- Technologies: MS Autopilot, Zero Touch.
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Project management proof of concept for the introduction of new DWDM technology
Nearby freelancers
Professionals working in or nearby Mureck, Austria