Experience
Freelancer
ALGK-BAUPRO
- Scope of work [link]
Project Director Infrastructure
VINCI GeoInfrastructure GmbH Deutschland
- Project – SuedOstLink, Lot C1, Cable Route
- 90 km cable trench
- 80 crossings (cut & cover, HDD, microtunnelling)
65 large joint bays (muff houses)
10 soil treatment plants
Project Director Tunnelling
Implenia Construction GmbH
- Project – Crossing River Elbe Hamburg
- TBM CREG EPB OD 4300 segment lining, 1.2 km
- 2 shafts with diaphragm walls Ø 23 m, depth 39 m
- Buoyancy protection base plate with anchor
- Steel construction for culvert for district heating supply and return pipe ID 800
- Passage through alternating glacial sediments with up to 45 m water pressure
Division Manager & Head of Technical Department
Gebrüder Karstens GmbH & Co KG
- Numerous projects in infrastructure building, road construction, pipeline construction
- Head of construction equipment
- Up to 60 employees
Project Director & Managing Director Tunnelling, Head of Tunnel Department
Vianini Lavori SpA – Lovön Samverkan AB Joint Venture
- Construction time 71 months (start blasting Oct 2017)
- 5 Atlas Copco boomer
- 2 stationary crushing plants + 3 mobile crushing plants
- 2 concrete batching plants (120 m³/h)
- 9 million tons granite hard-rock excavation with vehicle-conveyor-belt-seaborne mucking system
- Access tunnel (80 m², 6 km), main tunnel (130 m², 14 km), junctions up to 200 m²
- 8 ventilation chambers (>22 500 m³), 8 shafts (raise boring 45 m–110 m, Ø 9.8 m)
- Conventional rock pre-support (NATM) with grouted anchors, wire mesh, shotcrete
- Tunnel inner lining: 3 road lanes with concrete impact walls and waterproof membrane roof sealing
Project Director Tunnelling, Head of Tunnel Department
Ed. Züblin AG – Division International Tunnelling
- Construction time 50 months (start drilling end of 2016)
- TBM Atlas Copco OD 3900 hard-rock double-gripper with rail-bounded muck removal (13.5 km)
- Conventional support (NATM) with grouted anchors, wire mesh, shotcrete
- Access tunnel by road header Sandvik MT 720 (1.3 km, 29 m²)
- Site installation, steel lining and grouting of 100″ pipe (14.1 km total)
- David surge shaft: vertical shaft by raise boring/drill & blast (Ø 4 m–5.5 m, depth 290 m)
- Excavated volume: 225 000 m³ / 585 000 t
- Personnel up to 120, contract volume > €200 million
Senior Construction Manager Tunnelling
Royal BAM Group - Wayss & Freytag Ingenieurbau AG
- EPB boring machines ID 1600–2400 and ID 2800 with slurry transport and fluid support
- Annulus overcut with centralised bentonite lubrication system
- Start/reception shafts with secant bored piles/diaphragm walls Ø 12 m–25 m, depth 17 m–36 m
- Reinforced concrete jacking pipes ID 1600–2800 (OD 2100–3600), max string length 1450 m with 9 intermediates
- Total length 51 km, bends down to 500 m radius, max jacking force 21 000 kN
- Crossings of motorways, canal, railways in soft rock (7 MPa), groundwater pressure up to 3.6 bar
- Personnel up to 70, contract volume > €400 million
International Senior Project Manager
Meyer & John GmbH & Co. KG
- Pipe jacking with open shield and tunnel scraper
- Full face boring with slurry transport and bentonite face support
- Annulus overcut with centralised bentonite lubrication
- Compressed air site, sheet-piling start/reception shaft (13 m×7 m×16 m)
- Jacking pipes ID 3100 (OD 3800) and GRP ID 800 (OD 870), total length 650 m, 3 intermediates
- Bend radius infinite, max jacking force 6000 kN, crossing harbour bay in interbedded sand, clay, peat, 1.6 bar water pressure
- Personnel up to 20, contract volume €1.3 million
International Senior Project Manager
Meyer & John GmbH & Co. KG
- Full face boring with slurry transport and bentonite support
- Annulus overcut with centralised bentonite lubrication
- In-situ concrete start/reception shaft (6 m×4.5 m×6 m)
- Jacking pipe ID 1200 (OD 1720), length 120 m, 4 intermediates
- Bend radius infinite, max jacking force 8000 kN, crossing motorway A7, hard sandstone (70 MPa)
- Personnel up to 8, contract volume €250 000
International Senior Project Manager, TBM Tunnel Manager
Meyer & John GmbH & Co. KG
- Full face boring with slurry transport and bentonite support
- Annulus overcut with centralised bentonite lubrication
- In-situ concrete start/reception shaft (6 m×4.5 m×6 m)
- Jacking pipe ID 1200 (OD 1720), length 1050 m, 7 intermediates
- Bend radius infinite, max jacking force 8000 kN, inner-city hard limestone (40 MPa)
- Personnel up to 15, contract volume €2.4 million
International Senior Project Manager, TBM Tunnel Manager
Meyer & John GmbH & Co. KG
- Full-face manned boring with slurry transport and bentonite support
- Annulus overcut with centralized bentonite lubrication
- In-situ concrete launch/reception shaft (9 m×6.5 m×12 m)
- Jacking pipe ID 2200 (OD 2680), length 750 m, 4 intermediates
- Infinite bend radius, max. jacking force 12 000 kN, motorway and railway crossings, 0.6 bar water pressure
- Personnel up to 20, contract value €3.3 million
International Senior Project Manager, TBM Tunnel Manager
Meyer & John GmbH & Co. KG
- Herrenknecht Direct Pipe system for 48″ PE-coated steel gas pipeline
- Pipe thruster force 7500 kN, bend radius 1900 m, length 250 m
- Launch/reception shafts with steel sheet piles (Larson L 603)
- Personnel up to 8, contract value €150 000
International Construction & Production Manager
STRABAG S.E. - STRABAG International GmbH
- Rehabilitation and upgrade of Tripoli International Airport road (TIAR), 2×4 asphalt lanes, 25 km
- Milling and asphalt paving: 260 000 t; 50 km concrete barrier
- Geotechnical investigation, quarry licensing and operation with crushing plants
- Construction of asphalt plant (240 t/h) and concrete plant (60 m³/h)
- Transport department setup (30 trucks), staff camp for 350
- Personnel up to 240, contract value €180 million
International Construction Manager Tunnel Equipment
FOGTEC Brandschutz GmbH & Co. KG
- Design and manufacture of tunnel fire protection with high-pressure water mist (240 bar)
- 1.5 MW pump capacity, 45 km stainless steel piping ID 10 mm–276 mm
- Installation of smoke and fire detection systems with Ethernet control
- Sites: Madrid M30, Oviedo A5, Granada railway station
- Personnel up to 60, contract value €23.5 million
Construction Manager
TBS-Bau GmbH
- Development and construction of Fallersleben residential area: 250 single-family houses + 70 multi-family residences
- Development and construction of Hannover-Krohnskamp residential area (Expo 2000)
Project Manager
Heilit + Woerner Bau AG
- Pile foundation for the River Saale bridge in Jena (24 bored piles Ø 1.8 m, depth 36 m)
- Renovation and extension of Erfurt Airport runway (145 000 m²)
- Underground cable ducts (1 500 m), embankments on highways A9, A4, A71
- Toxic waste landfills with 2–4-layer mineral sealing (40 000 m²–80 000 m²)
Project Manager Geotechnical Engineering
Jena-Geos-Ingenieurbüro GmbH
- Soil investigations and geotechnical foundation consulting
- Soil and rock mechanics, engineering geology, geosynthetics, environmental geotechnics
- Head of soil mechanics laboratory
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Construction, Real Estate, Manufacturing, Energy, and Utilities.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Operations, Production, Research and Development, and Product Development.
Frequently asked questions
Have questions? Find more information here.
Andrés is based in Waren (Müritz), Germany and can operate in on-site, hybrid, and remote work models.
Andrés speaks the following languages: German (Native), English (Advanced), Spanish (Advanced), Arabic (Elementary), Hebrew (Elementary).
Andrés has at least 33 years of experience. During this time, Andrés has worked in at least 14 different roles and for 13 different companies. The average length of individual experience is 2 years. Note that Andrés may not have shared all experience and actually has more experience.
Based on recent experience, Andrés would be well-suited for roles such as: Freelancer, Project Director Infrastructure, Project Director Tunnelling.
Andrés's most recent position is Freelancer at ALGK-BAUPRO.
In recent years, Andrés has worked for ALGK-BAUPRO, VINCI GeoInfrastructure GmbH Deutschland, Implenia Construction GmbH, and Gebrüder Karstens GmbH & Co KG.
Andrés is most experienced in industries like Construction, Real Estate, and Manufacturing. Andrés also has some experience in Energy and Utilities.
Andrés is most experienced in business areas like Project Management, Operations, and Production. Andrés also has some experience in Research and Development and Product Development.
Andrés has recently worked in industries like Construction, Energy, and Utilities.
Andrés has recently worked in business areas like Operations and Project Management.
Andrés holds a Master in Geology from Technische Universität Clausthal.
Andrés has 2 certificates. These include: Driving licence: B and Qualification under RAB 30 (Modules B & C) in progress.
The availability of Andrés needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 26 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Joel B.
Last position:
Senior Construction Supervisor for LOS D3a and D3b at SudOstLink
- Leading a team of 28 staff (BBB, HBB, ÖBB, IBB, ABB, GBB, öBÜ, SiGiKo, excavation supervisors, resident management)
- Coordinating and managing site activities
- Preparing reports for the client and progress reports
- Overall coordination and management of the assigned construction section (approx. 50 km)
- Schedule and invoice review as well as cost control
- Monitoring the execution of load-bearing structures for compliance with stability proofs
- Coordinating all parties involved in site monitoring
- Creating, updating, and monitoring a schedule (bar chart)
- Reviewing invoices, checking measurements and comparing with contract sums including claims
- Organizing acceptance of construction works, identifying defects and giving acceptance recommendation to the client
- Applying for official approvals and participating in them
- Systematic compilation of documentation, drawings and calculated results of the project
Dr Ing Over D.
Last position:
Pipeline Construction Manager at ILF
ETL 180 - Construction of 90 Km gas pipeline between Hamburg and Bremen. Supervision of welding, pipe lowering, coating, bending work and pressure testing. Quality assurance. Steel pipe with a diameter of 1,4 m and a wall thickness of 21mm.
Wilhelm H.
Last position:
Project Manager / Senior Consultant at Anseres GmbH
- Review of BVA sites – compliance audits under VS-NfD framework conditions
- Application of BSI IT Baseline Protection and NdB user obligations
- Conducting security and compliance audits of Federal Office of Administration sites
- Documentation of results in the context of VS-NfD
- Representing the client in workshops and meetings with other federal authorities
- Representing the client to the BSI and aligning security requirements
Mahmoud T.
Last position:
Strategy Consultant, Organizational Developer at Netcom BW / EnBW
- Analysis of the fiber optic market with a focus on FTTH
- Advising senior management on strategy planning for the next 10 years
- Reviewing product portfolios and services
- Identifying cost-saving opportunities
- Planning restructuring measures as part of a transformation program
- Designing a program structure "Fit For Profit" to implement the planned restructuring and meet strategic objectives
Michael R.
Last position:
Project Manager at Infrawave
Project planning, construction schedule control, and resource coordination
Management of subcontractors, site managers, and suppliers
Application and tracking of traffic regulation orders (VRAO) and excavation permits
Quality assurance, health and safety (HSE), and compliance with technical standards
Budget control, contract management, and VOB-compliant change order management
Complete construction documentation, including as-built records and billing documents
Implementation of 3D GIS-supported construction progress processes
Development of a finance dashboard in collaboration with IT
Acceleration of permit approvals through optimized coordination with municipalities
Optimization of material and resource logistics
Introduction of structured site and progress reports
Kuno W.
Last position:
Managing Director at KW Ingenieur GmbH
- Project management for hydraulic structures
- Rehabilitation of weir structures
- Rehabilitation concepts
- Tendering
- Scour hole repairs
- Tendering, billing, and change order negotiations
Nearby freelancers
Professionals working in or nearby Waren (Müritz), Germany

