Experience
Project Manager
Turkmenistan Airlines
Turkmenistan Airlines
EASA/TCO reauthorization, IOSA consulting, blacklisting
Lufthansa Airline Operations Excellence
Lufthansa Airline Operations Excellence
Punctuality improvement in maintenance and flight operations, as well as other operational interfaces ( ground operation, fuelling, catering, boarding, etc)
Maintenance Efficiency
Interjet
Unmanned Air Vehicle
Lufthansa Group
Representative of the Lufthansa Group in International Committees, defining future UAV regulations
Maintenance Efficiency
Oman Air
Safety audit for Star Alliance
Avianca do
Project expert
Lufthansa Group Holding
Innovation Management, aviation regulation
SEM Business Plan Maintenance Centre
SEM
Crotone – South Italy
Project Director
Azul Linhas Aereas Brazil
Base Maintenance Efficiency
Project Director
Lufthansa Passenger Airline/ Lufthansa Technik
Value Stream Design Maintenance Planning OCAPI (project within worldwide LH SCORE change management)
Project Director
Middle East VIP carrier
Business Plan VIP Business Jet operation within IPO transaction
Project Director
Czech Airlines Technic CSAT
Assessment and restructuring CSAT – MRO organisation
Project Director
Lufthansa Cargo / Jettainer
ULD provider
Tender Process for entire ULD handling management
Managing Consultant, Aviation Consulting
Lufthansa Consulting GmbH
Project Director
Saudi Arabia VIP Carrier
Operational enhancement
Diagnosis and implementation
Project Director
HeliOne (subsidiary of Canadian Helicopter CHC)
Helicopter MRO assessment, including SMS in maintenance and overhaul
Project Director
Afriqiyah Airways
Safety Assessment
Project Director
Germania
Airbus / Boeing Aircraft Fleet Rollover Evaluation
Project Director
Yakutia Airlines
IOSA consulting
Principal Airline Operations and Maintenance & Engineering
Lufthansa Consulting GmbH
Project Director
AZAL Azerbaijan Airlines
IOSA Consulting
Head of Project
SonAir
Airline strategy and Operations Enhancement for Son Air, the airline of the National Oil Company Sonangol
Project Manager
Petrobras
Aviation Safety Improvement for Brazilian Petrobras Helicopter Offshore Operation
- Phase 1: Diagnosis
- Phase 2: Implementation
- Phase 3: Review of Safety Programme
- Phase 4: Update Aviation Strategy
Project Director
Jordan Civil Aviation Authority
Technical Assistance for the European Commission DGTREN, Jordan DGCA
Project Expert
European Commission
Benchmarking of European Air Navigation Service Providers ANSP's, Project within the Single European Sky SES Initiative, Study in a joint consortium with Booz Allen & Hamilton, London
Project Manager
Government of Madagascar
VIP aircraft delivery for the President of Madagascar: Purchase, Modification, Certificate of Export, Entry-into-service (EIS)
Managing Consultant
Lufthansa Consulting GmbH
Head of Business Unit Airline Operations
Project Expert
Mexican Directorate of Civil Aviation
Reorganization of Mexican Directorate of Civil Aviation, Aviation Safety and Security Department
Project Expert
Sheremetyevo International Airport (SVO)
Development and Re-Draft of SVO Airport emergency plan, Russian standard AP emergency plan, full-scale exercise
Project Expert
Commonwealth of Independent States (CIS)
Moldova, Caucasian Republics, Kazakhstan, Uzbekistan, Mongolia
EU-Tacis Program. Aircraft control training and air routes development, CAA and ATC improvement and restructuring incl. technical assistance to all CIS Civil Aviation Authorities
Project Expert
Kuwait Airways
Several flight operation improvement programs:
- flight dispatch reorganization
- flight ops procedures
- flight ops management training
- JAR seminars
- etc.
Project Manager and Senior Consultant Aviation
Lufthansa Consulting GmbH
Helicopter Safety and MRO database for Royal fleet
Royal Flight
Royal Flight
Network Management
Lufthansa Passenger Airline
Lufthansa and European MRO alliance with Air France, Iberia, Alitalia
Engineer Technical Division
Lufthansa German Airlines
Project Manager: Aircraft Maintenance Control System
ATLAS – coordinator / European overhaul and maintenance cooperation
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Aerospace and Defense, Professional Services, Energy, Tourism, Government and Administration, and Transportation.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Operations, Strategy, Information Technology, Procurement, and Research and Development.
Frequently asked questions
Have questions? Find more information here.
Ingo is based in Frankfurt, Germany and can operate in on-site, hybrid, and remote work models.
Ingo speaks the following languages: German (Native), English (Advanced), Portuguese (Intermediate), Spanish (Elementary).
Ingo has at least 36 years of experience. During this time, Ingo has worked in at least 17 different roles and for 32 different companies. The average length of individual experience is 1 year. Note that Ingo may not have shared all experience and actually has more experience.
Based on recent experience, Ingo would be well-suited for roles such as: Project Manager, Lufthansa Airline Operations Excellence, Maintenance Efficiency.
Ingo's most recent position is Project Manager at Turkmenistan Airlines.
Ingo is most experienced in industries like Aerospace and Defense, Professional Services, and Energy. Ingo also has some experience in Tourism, Government and Administration, and Transportation.
Ingo is most experienced in business areas like Project Management, Operations, and Strategy. Ingo also has some experience in Information Technology, Research and Development, and Procurement.
Ingo holds a Master in Business Administration and Industrial Engineering from Technical University Darmstadt.
Ingo is immediately available part-time for suitable projects.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 27 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Fred K.
Last position:
Project Manager Digital Restructuring at Northrop Grumman LITEF GmbH
Assignment focus: Leading digital restructuring in a highly regulated Defence and Aerospace environment. Focus areas: improving data flows and data quality, introducing paperless data collection in production, integrating machine data for automatic SPC calculation and process control, as well as cybersecurity analyses.
Main objectives:
- Analyze, structure and improve data flows and data quality in production
- Introduce paperless data collection in manufacturing areas
- Integrate machine data for automatic SPC data calculation and process control
- Implement digital restructuring while meeting regulatory requirements in the Defence environment
Measures and results:
- Analyzed and structured existing production data flows as a basis for control and reporting
- Established mechanisms to ensure data quality and availability across manufacturing areas
- Introduced paperless data collection in production — replacing manual and paper-based processes
- Integrated machine data for automatic SPC data calculation (control charts, Cp/Cpk) and real-time process control
- Conducted cybersecurity analyses in the production and IT environments
Area of responsibility: Project management for digital restructuring, paperless production, data management and data quality in a highly regulated Defence and Aerospace environment.
Stefan S.
Last position:
Interim COO at Moteg GmbH (POCLAIN)
Interim COO
Revenue €5 million, 30 employees
Industry: e-mobility, commercial vehicles/construction machinery/public transport
- Interim company management
- Led the transformation process, including integration into the POCLAIN matrix organization
- Introduced business standards and routines
- Assessed and updated the QM system
- Implemented statutory corporate requirements
- Introduced weekly and monthly reviews
- Optimized SCM and supply chains
- Developed the company strategy and objectives
- Introduced project management to visualize and manage projects
- Implemented statutory ASU requirements following the BG audit
- Created roadmaps for all departments
Results achieved:
Implemented planning and management methods. Successfully implemented the change management process. Introduced and implemented risk management and Hoshin Kanri to develop company objectives and implement defined measures. Created emergency plans for all processes and areas. Active stakeholder management
Jörn B.
Last position:
Process Optimization Consultant at Tandler GmbH
- Improving processes in the purchasing area
- Digitizing purchasing processes
- Optimizing end-to-end manufacturing processes
Andreas L.
Last position:
Interim Head of Call and Service Center at Famicord Group
- Europe's largest stem cell bank; company revenue: 78 Mio. EUR; employees 700; personnel responsibility: 18; duration: 6 months
- Interim takeover of all teams in the areas of sales/inside sales, order management and service
- Separation of the order business in Germany/Austria into two GmbHs under my leadership, while also integrating an acquired company into the German operational business
- Additional creation of new KPIs and adjustment of processes with internal interfaces and customers
- Requirements management for the introduction of the new CRM
- Full implementation of the above-mentioned operational integration and separation of the areas
- Improvement of KPIs in call accessibility, first-contact resolution rate and response time
- Established newly introduced customer feedback management
- Structured handover of the area to my successor
Rüdiger S.
Last position:
Manufacturer of busbar systems for power and data transmission
- Review and assessment of the existing situation
- Identification and definition of implementation measures to close existing gaps
Stephan J.
Last position:
Technical Writer at pro-beam
Technical writer at a special-purpose machine manufacturer, implementing the requirements of the EU Machinery Regulation in the technical documentation and moderating FMEAs. Role: Technical Writer and FMEA Moderator
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Project Manager
Nearby freelancers
Professionals working in or nearby Frankfurt, Germany

