Experience
Project Manager
Industrial and Trading Company
- Development of a planning system (planning the planning) for the entire company.
- Development and implementation of a digital, AI-supported strategic and operational management system for the entire company.
Project Manager
Bank (XXX)
- Development of a concept to ensure compliance rules and legal/regulatory requirements are met.
- Coordination of the concept and its implementation with the departments involved and the central executives in the Board division (Compliance, Legal, Audit, etc.).
Project Manager
Bank (XXX)
- Design of a contribution margin management system for a bank.
- Design and setup of the implementation project.
Project Manager
Bank (XXX)
- Restructuring.
- Optimization of process management and control.
Project Manager
Service Digitization Development (XXX)
- Design, development and implementation of an “eConsulting management consulting platform” as self-consulting, with digital processing of management consulting projects.
Project Manager
Filial-Universalbank Oberösterreich (XXX)
- Restructuring of business process management.
- Introduction of multifunctional business process management with optimizations.
Project Manager
International Automotive Corporate Group
- Analysis of the AS-IS business processes across the entire corporate group and development of optimized TO-BE processes with the stakeholders.
- Development of a strategic target concept.
- Tender for PLM software (Product Lifecycle Management) to manage the group’s entire value chain, integrating all existing IT systems.
- Implementation of organizational and operational changes in the company, combined with phased change processes to develop the corporate culture.
- Integration of all IT systems into an end-to-end, integrated, data-driven management system (SAP, CAD, etc.).
Project Manager
Manufacturing of Pressure Capsules (XXX)
- Conducted a company diagnosis to assess the company’s situation.
- Developed reorganization initiatives.
Project Manager
Cash & Carry Retail Chain (XXX)
- Conducted a business and process analysis.
- Developed a liquidity and earnings management system.
Project Manager
Manufacturing and Distribution of Pressure Capsules and Special Pressure Vessels
- Weakness analysis.
- Documentation of AS-IS processes across the international corporate group (process modeling).
- Development of future TO-BE processes with all departments and companies.
- Preparation of an IT requirements catalog for the introduction of an ERP system (SAP).
- Support during implementation.
- “PASS NEU” project to redesign production control.
Consultant
Capital Market Modernization Azerbaijan (XXX)
- Supporting capital market modernization.
- Developing and implementing a knowledge management system.
Subproject Manager
State Bank of Vietnam and Banking Group
- World Bank project.
- Analyzing the current situation of the entire bank, including all regional offices and representative district and local banks.
- Developing a strategic concept to restructure and reposition the entire bank.
- Preparing an operational implementation concept to reorganize the bank across all key business areas and corporate functions.
- Developing the new organizational structure.
- Developing and optimizing business processes (using lending as an example).
Project Manager
Public Hospital (XXX)
- Conducting a business diagnosis and analyzing all areas of the hospital.
- Conducting a hospital stress test.
- Developing a reorganization concept to reposition the hospital.
Subproject Manager
Pensionsversicherungsanstalt Österreich (XXX)
- Standardizing all types of insurance across all pension insurance providers in Austria.
- Redefining business processes for all types of insurance.
- Digitizing business processes and developing the new software systems (project “zepta”).
Subproject Manager
State Bank of Nigeria (XXX)
- Conducting a due diligence analysis of the bank.
- Preparing the decision-making basis for purchasing the bank.
Project Manager
VGH Versicherungsgruppe Hannover (XXX)
- Introduction of quality-oriented business process management.
- Restructuring of the electronic organizational manual in Lotus Notes.
- Design and introduction of business process management.
- Training of management, departments, and the business areas involved.
- Modeling of business processes, including time and cost components.
- Simulation and optimization of processes with a focus on quality management.
- Implementation of process cost accounting.
- Preparation of decision-making materials for the Executive Board based on process cost calculations (quantitative and qualitative).
- Preparatory work for the introduction of the Balanced Scorecard.
- Creating a basis for process-based decisions on whether IT developments should be carried out internally or externally, or not carried out at all.
- Preparation and introduction of quality management based on ISO 9001 and support with the initial certification (10/2005).
- Expansion of quality management to other business areas and support with ISO 9001 and ISO 20000-ITIL certification (10/2006).
Project Manager
Private Hospital (XXX)
- Development of the risk management system.
- Risk monitoring, risk assessment, and introduction of risk management.
- Design and introduction of risk monitoring based on the Strategy Map and Balanced Scorecard, with a focus on key risks.
Project Manager
International Logistics Group (XXX)
- Development of new procurement structures.
- Integration of the purchasing organizations of the three companies.
- Modeling of purchasing processes, involving all business functions.
- Modeling of the new processes, including process costs and times.
- Development of optimized target processes.
- Support with organizational and IT implementation.
Project Manager
Bundesliga Football Club and Subsidiaries (XXX)
- Support with redesigning the club's structures and organizational setup.
- High-level structuring of business processes.
Project Manager
International Insurance Group (XXX)
- Development of business processes for all management, value-adding, and support processes.
- Restructuring of the organizational setup.
- Preparation of job descriptions.
- Development of the foundations for quality management (ISO 9001).
- Conducting, evaluating, and analyzing employee and customer surveys.
- Creation of the information system as an intranet website.
Project Manager
Religious Hospital (XXX)
- Developing the new strategy.
- Assessing the current situation.
- Conducting surveys of employees, patients and referring physicians.
Lecturer
University of Applied Sciences Technikum Wien
- Business Informatics, Faculty of Computer Science.
- Member of the Business Informatics Master's Examination Committee.
- Teaching and supervising Master's theses.
Project Manager
Croatian Stock Exchange (XXX)
- Defining the strategic direction and developing the business model.
- Introducing process management.
- Modeling and optimizing core processes.
- Restructuring the organizational structure.
- Implementing project management.
- Supporting the implementation of the new strategy, processes and structures.
- Developing a management information system based on the Balanced Scorecard (monitoring and control system).
Project Manager
International DIY Retail Chain (XXX)
- Restructuring the company and its organizational structure.
- Modeling business processes.
- Introducing activity-based costing.
- Simulating and optimizing processes.
- Making optimization decisions (outsourcing services, eliminating unnecessary functions, etc.).
- Safeguarding business processes through quality management (ISO).
Project Team Member
Bonus Collection and Customer Loyalty Systems (XXX)
- Structuring and establishing the company.
- Designing and optimizing business processes.
- Documenting the entire system.
- Setting up controlling and an early warning system.
Project Manager
Industrial Transportation Company (XXX)
- Intelligent Transportation Systems (ITS), Electronic Toll Collection (ETC).
- Introduction of an information security system in accordance with ISO 27001.
- Preparation for ISO 27001 certification.
- Support during certification and follow-up work.
Project Manager
VGH Versicherungsgruppe Hannover (XXX)
- Introduction of quality-focused business process management.
- Restructuring of the electronic organizational manual in Lotus Notes.
- Design and introduction of business process management.
- Training for management, departments, and involved business units.
- Modeling of business processes, including time and cost components.
- Simulation and optimization of processes with a focus on quality management.
- Implementation of process cost accounting.
- Preparation of decision-making documents for the executive board based on process cost calculations (quantitative and qualitative).
- Preparatory work for the introduction of the Balanced Scorecard.
- Providing a basis for decisions on whether IT developments should be handled internally or externally, or not carried out, based on processes.
- Preparation and introduction of quality management based on ISO 9001 and support with initial certification.
- Expansion of quality management to other business units and support with ISO 9001 and ISO 20000-ITIL certification.
Project Manager
Private Bank (XXX)
- Realignment of the bank in line with the new corporate strategy.
- Realignment and optimization of business processes across all bank divisions and product groups for the bank and the investment company.
- Restructuring of the organizational structure and changing and redefining the business divisions and banking functions for the bank and the investment company.
Project Team Member
Microfinance Capacity Building Initiative – East Africa (XXX)
- Projects in Kenya, Uganda, Tanzania, Ethiopia, Rwanda, and Burundi.
- Structuring a knowledge database to document ongoing project information and results.
- Ensuring internal communication within the international project team.
- Creating and implementing a knowledge database in a web application (internet and extranet solution).
Project Team Member
Food Industry (XXX)
- Establishment of an operational holding company with divisions for services, trade, real estate, and production.
- Establishment and implementation of group controlling.
- Strategic direction and structuring of the holding company.
- Modeling of business processes.
- Development of a franchise system.
Project Manager
Automotive Industry (XXX)
- Development of the core business process landscape.
- Modeling of business processes.
- Development of process cost accounting.
- Optimization of business processes.
- Support in selecting a new ERP software system.
Subproject Manager
Russian Stock Exchange (XXX)
- Restructuring of the Moscow Stock Exchange to create modern structures and processes.
- Documenting procedures as business processes.
- Developing a Code of Practice for process and quality management.
- Developing an internal information system (intranet).
- Ensuring implementation through the introduction of quality management (ISO 9000).
- Conducting and evaluating employee surveys.
Project Manager
International EU Universal Bank (XXX)
- Development of the organizational structure and processes.
- Developing an electronic organization manual on the intranet to ensure the bank's security and management.
- Structuring the business process map for all bank activities (value-adding, management, and support processes).
- Defining business processes for all banking products in Austria and abroad.
- Preparing guidelines and procedures for employees based on the business processes.
- Defining the organizational structure, including job descriptions, responsibilities, etc.
- Introducing the ISO 9001 quality management system and preparing for certification.
Project Lead
Universal Bank Austria (XXX)
- Reorganization of the Payments and Internal Services departments.
- Implementation of a cost reduction and efficiency improvement program.
- Establishment of a centralized, end-to-end purchasing function.
- Support for implementation measures.
Subproject Manager, Project Manager
Logistics Group (XXX)
- Modeling business processes in the corporate customer area.
- Developing optimized target processes.
- Developing an IT implementation plan.
- Developing and implementing a cost reduction and efficiency improvement program in the corporate customer area.
- Project “bill.it”.
- Project to ensure invoicing (commissioned by Internal Audit).
- Optimization of parcel handling for mail-order businesses.
Project Manager
Mobile Network Operator Market Entry (XXX)
- Developed a logistics concept.
- Prepared business operations in Austria.
Project Manager
Universal Bank Restructuring, Ukraine (XXX)
- Reorganized the universal bank.
- Focus areas: lending and payment transactions.
- Ensured adequate staffing by reorganizing the Human Resources department.
- Documented business processes.
- Supported the rollout across branches nationwide.
Project Manager
Marketing Consulting Company (XXX)
- Optimized business processes.
- Developed a marketing evaluation system.
- Developed a marketing certification system (Triple-A-Marketing).
Project Manager
Universal Bank Restructuring, Kyrgyztan (XXX)
- Comprehensive reorganization of the entire bank (head office and all regional directorates and branches).
- Developed a concept for strategic realignment.
- Developed target business processes and rules for employees.
Project Manager
Universal Bank, Russia (XXX)
- World Bank project.
- Reorganized the entire bank.
- Direct areas of responsibility: lending, payment transactions, organization, IT, and Human Resources.
- Developed AS-IS and TO-BE business processes.
- Optimized processes based on process cost calculations.
- Trained employees on site and at partner bank Raiffeisen-Zentralbank in Vienna.
Project Manager
Grenzbereich Shopping Center (XXX)
- Supported the setup and operation of the food and non-food supermarket.
- Optimized purchasing and product ranges, logistics, pricing, etc.
Subproject Manager
Universal Bank Kazakhstan (XXX)
- World Bank Central Asia Region.
- Worked on projects in the organization and IT departments of a major bank in Kazakhstan.
- Reorganized the bank in coordination with the consulting team.
Subproject Manager
Mobile Network Operator Austria (XXX)
- Designed the new mobile network in Austria—from the decision through to full operation across all business areas.
- Developed workflows and modeled the related business processes.
- Secured the processes through internal and external Service Level Agreements.
- Analyzed and optimized the direct sales process.
- Outsourced the business unit to four companies.
- Integrated the external companies through business processes and Service Level Agreements.
- Managed direct sales using a comprehensive, up-to-date controlling system (ensuring delivery within 48 hours).
Project Manager
Housing Cooperatives Vienna and Lower Austria (XXX)
- Reorganized the companies.
- Supported the introduction of new software.
Project Manager and CEO
Setup of a Food and DIY Store Chain (XXX)
- Conducted macro and micro location analyses.
- Designed the stores.
- Planned the setup of the stores with the member companies.
- Defined product ranges, led supplier negotiations, and managed operational purchasing.
- Planned and managed the stores, and managed store operations and logistics.
- Managed the day-to-day operations of the supermarkets and DIY stores.
Project Manager
Bank (XXX)
- Professional support in modeling AS-IS and TO-BE processes.
- Support in developing a new IT system.
Project Manager
DIY and Building Materials Retailer (XXX)
- Company analysis.
- Development of reorganization plans.
Project Manager
Private Bank Asset Management (XXX)
- Defining rules and procedures for business processes.
- Defining securities processing in the asset management company and its interfaces with the parent bank.
- Managing securities processing at the parent bank.
- Carrying out optimization calculations.
- Introducing the ISO 9000 quality management system.
- Ongoing external process reviews and internal audits to ensure continuous quality.
- Preparing for and supporting annual certification audits.
Project Manager
Investment Fund of a Private Bank (XXX)
- Setting up the investment fund of a universal bank from scratch.
- Defining all processing procedures, including those for securities.
- Processing at the universal bank.
- Implementing business process management.
- Modeling business processes.
- Optimizing business processes.
- Ensuring quality through ISO 9001 implementation, certification, and ongoing external support.
Project Manager
Military Vehicle Manufacturer / Defense Conversion Project
- PPS Detva (1994-1996).
- Converting production from defense products to construction machinery for USAID.
- Analyzing the entire company.
- Developing reorganization programs for engineering / production, logistics, planning, purchasing, marketing, sales, and administration.
- Organizing visits to Western European companies to learn about best practices.
- Conducting training in purchasing, sales, and production planning.
Project Manager
Universal Bank and Wealth Management Austria (XXX)
- Designed and developed an alternative sales channel for a universal bank (mobile sales, among others).
- Defined alternative business processes together with the bank.
- Established a sales subsidiary.
- Searched for, selected and trained new employees for the bank’s sales subsidiary, and conducted assessment centers.
- Fine-tuned and optimized business processes during live operations.
- Developed and implemented controlling tools to manage the company in a timely manner.
Project Manager
International Commodity Trading (XXX)
- Analyzed business areas.
- Prepared a requirements catalog for new ERP software.
Project Manager
Investment Fund (XXX)
- First privatization wave in Czechia.
- Reviewed and assessed 53 target companies (agricultural industrial companies) in Czechia/Moravia.
- Assessed the companies and selected the investee companies for the investment portfolio of an Austrian major bank’s investment fund.
Project Manager
Universal Bank (Group Subsidiary) (XXX)
- Comprehensive reorganization of the entire bank, including headquarters and all branches.
- Introduced business process management.
- Modeled business processes across all bank areas.
- Optimized banking areas.
- Focus areas: credit, deposits, securities, derivatives, investment funds, treasury, payment transactions, account management, controlling, risk management, accounting, compliance, organization/IT, insurance, building savings, coin trading.
Project Manager
International Trade and Finance Bank (XXX)
- Restructured financing and trade operations.
- Optimized business processes in the financing area.
- Reorganized international trade processing processes.
- Prepared a functional specification for a tender for new IT systems.
Project Manager
Universal and Real Estate Financing Bank (XXX)
- Reorganization of the Internal Services departments.
- Development of reorganization measures.
Project Manager
Data and Valuables Security Center (XXX)
- Organization of the security center for storing valuables at Palais Auersperg.
- Organization of the data security center and transport of IT data from the customer to the security center and back.
Project Manager
Universal Bank Austria (XXX)
- Reorganization of Internal Services/Printing.
- Development of a cost reduction program.
- Establishment of a central purchasing department for the entire bank/group.
- Support with implementing cost reduction measures.
- Training of employees with purchasing responsibilities.
Project Manager
Brick and Plastics Production (XXX)
- Reorganization of the group of companies.
- Organizational integration into Wienerberger AG.
Project Manager
Austrian Universal Banking Group, Raiffeisen Central Institution
- Reorganization and realignment of the branch organization, focusing on loans and securities.
- Modeling of business processes with optimization approaches.
- Support with the relocation of a site.
Project Manager
Photo Quick-Lab Chain (XXX)
- Cost accounting and pricing.
- Development of the business model.
- Expansion planning.
Project Manager, Head of Materials Management
Glass Industry (XXX)
- Reorganization of the logistics area (purchasing, transport, production planning).
- Introduction of a new purchasing organization.
- Optimization of production planning and control.
- Support with the introduction of standard order processing software.
Project Manager
Ministry of Education (XXX)
- Reorganization of the media service.
- Conducting organization and optimization workshops.
Project Manager, Head of Internal Audit and Organizational Development
Heinzel Group Europe, Paper Industry (XXX)
- Implementation and management of internal group auditing and organizational development.
- Implementation of an internal control system (IKS) and establishment of an internal audit system.
- Conducting various organizational projects.
Project Lead
Illuminated Signage (XXX)
- Development of the business model.
- Planning of business operations.
Project Manager
Tour Operator / Tour Operator (XXX)
- Restructuring of operational processes and organizational structure.
- Cost optimization of package deals, flight operations, and hotel offers.
- Calculating sales priorities to maximize contribution margins for each departure date, destination, and hotel.
Project Manager
Legal Publisher and Bookshop (XXX)
- Feasibility study on digitizing legal literature (laws, court rulings, etc.) for digital media.
- Concept for direct data access to a legal database.
- Development of an information and KPI system for company management.
Project Manager
Bank Subsidiary Management Consultancy (XXX)
- Establishment of a management consultancy division.
- Delivery of various consulting projects for corporate clients of the Erste Österreichische Spar-Casse.
Project Manager
Food Industry (XXX)
- Conducted a company analysis.
- Developed an efficiency improvement plan.
Project Manager
Agricultural Trading (XXX)
- Conducted a company analysis.
- Developed an efficiency improvement plan.
Project Management
Photo industry (XXX)
- Conducted an organizational and personnel assessment.
- Conducted an employee survey.
- Developed an organizational and personnel development plan.
Project Manager
Paper industry (XXX)
- Conducted a personnel assessment.
- Implemented a personnel development program.
Project Manager
Pharmaceutical industry (XXX)
- Conducted a company assessment to identify areas for improvement.
- Supported the implementation of a reorganization.
Project Manager
Paper industry (XXX)
- Conducted a personnel assessment to identify reorganization measures.
- Developed a personnel development plan.
- Oversaw the long-term implementation of the personnel development plan.
Project Manager, Assistant to the Managing Director
Automobil-Club Österreich (XXX)
- Conducted a company analysis and developed an efficiency improvement program.
- Developed and implemented an employee engagement program.
- Planned and conducted a management workshop.
- Conducted member opinion surveys.
Project Manager
Buchverlag (XXX)
- Conducted a company analysis.
- Developed a reorganization plan.
External Examiner and Researcher
Middlesex University London
- Conducted research on the digitization of knowledge-related and knowledge-intensive work.
- Served as an External Examiner for doctoral examinations.
University Lecturer, Organizational Director and Secretary General
Wirtschaftsuniversität Wien
- University Lecturer and Organizational Director for the Post Graduate Management university program.
- Research project on “New Methods of Creditworthiness Assessment” commissioned by the Austrian banking sector.
- Secretary General of the Institute for Business and Administrative Management at the Interdisciplinary Institute for Business Management.
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Banking and Finance, Education, Manufacturing, Automotive, Professional Services, and Retail.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Operations, Strategy, Information Technology, Research and Development, and Finance.
Frequently asked questions
Have questions? Find more information here.
Heinz is based in Vienna, Austria.
Heinz speaks the following languages: German (Native), English (Advanced).
Heinz has at least 54 years of experience. During this time, Heinz has worked in at least 12 different roles and for 69 different companies. The average length of individual experience is 1 year and 9 months. Note that Heinz may not have shared all experience and actually has more experience.
Based on recent experience, Heinz would be well-suited for roles such as: Project Manager, Consultant, Subproject Manager.
Heinz's most recent position is Project Manager at Industrial and Trading Company.
In recent years, Heinz has worked for Industrial and Trading Company, Bank (XXX), Service Digitization Development (XXX), Filial-Universalbank Oberösterreich (XXX), and International Automotive Corporate Group.
Heinz is most experienced in industries like Banking and Finance, Education, and Manufacturing. Heinz also has some experience in Automotive, Professional Services, and Retail.
Heinz is most experienced in business areas like Project Management, Operations, and Strategy. Heinz also has some experience in Information Technology, Research and Development, and Finance.
Heinz has recently worked in industries like Education, Automotive, and Banking and Finance.
Heinz has recently worked in business areas like Research and Development, Project Management, and Product Development.
Heinz holds a Doctorate in Business Administration from Middlesex University London and a Master in Management Consultancy from FH Burgenland, incite / Austrian Institute of Management.
Heinz has 1 certificate: CMC Certified Management Consultant.
Heinz is immediately available for suitable projects.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 27 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Chrisabel P.
Last position:
AI Systems & Product Strategy Expert at Webmeisterin
I build. I advise. I think in systems. After years leading digital transformation at scale — Accenture, BP, Lidl — I made a deliberate choice: trade platform dependency for structural independence. My focus is at the intersection of AI systems, product strategy, and venture thinking. I work with operators and founders who want to move fast without losing control — of their data, their stack, their direction.
Alexander P.
Last position:
Owner & Lecturer at Artellico / Own company for AI governance and data products
- Consulting and interim management at the intersection of IT operations and regulation
- Impact assessment and implementation planning for NISG 2026 and the EU AI Act, including risk management and reporting and evidence processes
- Training for governing bodies and employees on regulatory obligations
- Teaching assignments in Data & Information Management and Human-Machine Interaction at Hochschule Burgenland, since 2023
- Supervision of Master's theses and participation on examination boards
- Industry talks for businesses and educational institutions
- Design and development of data and AI products, platforms and pipelines
- Privacy-first architectures and Zero-Knowledge encryption, cloud-native on EU infrastructure
- Integration with bank account systems using SEPA direct debit mandates and message formats under ISO 20022 (pain.008, camt.053)
- MLOps and AIOps in live operations
- Own applications under my own brand: shared codebase, separate deployment for each target device
- AI-assisted software development (vibe-coding), complete agentic pipelines, code generation, implementation, automated testing, CI/CD and release cycles
- Professional publications on the EU AI Act, NIS2, DORA, CRA and CER as an integrated governance system
- Professional publications on data sovereignty, cloud economics and industrial image processing
- AI governance / compliance: data quality, Responsible AI, EU AI Act readiness, risk classification, AI ethics
Oliver V.
Last position:
Interim Manager and Management Consultant at Self-employed
- Developed a market entry strategy for the claims division of an insurance services provider.
- Analyzed and optimized existing claims processes.
- Defined management metrics and KPIs to improve performance and efficiency.
- Advised management on market positioning and process digitalization.
- Led an IT team of 13 employees as part of an interim vacancy cover.
- Ensured stable IT operations and managed external IT service providers.
- Led regulatory projects, particularly the implementation of the DORA regulation.
- Prepared and supported an IT security audit.
- Change management and conflict moderation in a challenging transformation environment (FI migration).
Zoran J.
Last position:
Technical Writer – Implementation of the BNPP IT PROD SEC Service Catalog at BNP Paribas Germany
Design, authorship and finalization of the IT PROD SEC service catalog with eight standardized security services (S-ID001–S-ID008).
Development of consistent service components & deliverables, RACI assignments and SLA and KPI definitions for each service.
Integration of BaFin document requirements under DORA into the service descriptions.
Coordination with IT, compliance, risk and operations teams to validate all service descriptions.
Specifically for governance & monitoring: definition of governance cadence, evidence delivery processes, audit support and definition of measurable KPIs and measurement methods.
Ensuring that all services are standardized, measurable and documented in an audit-proof manner.
Result: Approved service catalog with eight services as a binding basis for delivery, governance and audits; transparent SLAs/KPIs for each service and DORA/BAIT/MaRisk-compliant documentation with clear responsibilities and evidence trails.
Technologies and tools: Confluence, Jira, ServiceNow, Microsoft PowerPoint, Microsoft Visio, Office 365.
Matthias O.
Last position:
IT Project Manager at IT service provider
Implementation of anti-money laundering requirements under AMLA/KYC for an international major bank in Munich
Services provided:
- Clarification of the assignment and definition of the work package structure for the AMLA/KYC implementation project
- AI-supported project planning using a custom AI workflow for project management
- Preparation of the project management plan
- Resource and capacity planning
- Development of collaboration structures between the IT service provider and the bank client
- Agreement on responsibilities (RACI matrix)
- Management of 5 project members (core team)
- Project control, project monitoring, project reporting
- Communications management
- Escalation management
- Stakeholder management (11 stakeholders)
- Permanent member of the Steering Committee
- Project representation internally and externally
- Project reporting and management of decision-making bodies
- Project volume: 506 person-days (development effort)
- Risk management
- Quality management
- Organization and delivery of workshops
Methods: PMI PMBOK, EVM, GWG, DORA, BAIT, KANBAN, AML, AMLR, AMLA, GWG, KYC
IT environment: JIRA, Confluence, Sharepoint, Kantata Kimble, AI LLM Copilot, ChatGPT, anti-money laundering systems (custom-developed and SMARAGD)
Sandra K.
Last position:
Webinar Leader - Blackout Prevention and Preparation at SANDRA KLINKENBERG • Management Consultant, self-employed independent business consultant
- Webinar on Blackout - Brownout - Power failure - how do I recognise it and what can I do?
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Project Manager
Nearby freelancers
Professionals working in or nearby Vienna, Austria