I Putu Gede Sukadana-Commissioning and Start-up Team Lead
Check rate
Experience
Commissioning and Start-up Team Lead
ENI
- Managed commissioning and start-up activities for OPT LNG and FLNG projects in Dubai, Oman, and Congo.
- Participated in technical bid evaluation (TBE) and HAZOP, reviewed and approved commissioning methodologies and checklists.
- Reviewed systemization procedures, boundary limits, CCMS database population, handover schema, energization, loop checks, cause and effect tests, flushing, chemical cleaning, drying, inertization, first fill, catalyst loading, leak tests, and start-up scheduling.
- Witnessed FAT for telecom, electrical, control, and process equipment; managed N₂ leak tests and purging; led pre-start-up safety review (PSSR) and early start-up readiness.
- Performed dynamic tests and start-up of utility and process systems including RO, N₂ generation, inlet gas separator, fuel gas system, MRU, GSU, GDU, DPCU, liquefaction, refrigeration, boil-off gas, LNG storage and transfer, compressors, export, flash gas, and condensate systems.
- Managed performance testing of critical equipment, hydrotesting, leak testing of pipelines, evaluated facility performance, and registered lessons learned.
- Achievements:
- Completed FAT for critical equipment in Dubai, Oman, and Sharjah.
- Supported construction completion and delivered all commissioning deliverables.
- Completed function tests, dynamic tests, SAT activities, electrical power generation and distribution tests, loop checks, cause and effect tests for DCS, ESD, FGS.
- Completed mechanical run tests, remote start, operational sequencing, auto mode initiation for compression, N₂ generation, heating medium, water, flare, drain, and cooling systems.
- Achieved hydrocarbon start-up (50–100% flowrate) for LNG treatment, flash gas, and condensate systems.
- Completed 72-hour performance tests for booster and refrigeration compressors and plant acceptance tests.
- Safely loaded and unloaded LNG.
Completions & Commissioning Manager
Amec Foster Wheeler
- Led commissioning and start-up for brownfield CPP rejuvenation project in Brunei, upgrading DCS, ESD, FGS, electrical distribution, HVAC, and export gas compressor systems.
- Prepared systemization, QEDI database, pre-commissioning and commissioning procedures, completion sequences, critical path, milestones, and offshore strategy.
- Implemented Operation Readiness and Assurance (ORA) and Flawless Project Delivery (FPD); provided shutdown window plans and maximized activity efficiency.
- Witnessed FAT, static and function tests, SAT, dry, wet, dynamic commissioning, and performance testing for three export gas compressors.
- Managed handover documentation, integrated outstanding action tracker, isolation schemes, safeguarding logic tests, quality assurance, technical integrity verification, and pre-start-up audits.
- Ensured availability of critical, commissioning, and initial operating spares; completed training for new equipment and DCS; coordinated third-party vendors and operations support.
- Achievements:
- Completed operating test procedures and start-ups for brownfield areas.
- Safely energized electrical distribution and completed loop tests, cause and effect, third-party interface and communication tests.
- Completed flushing and N₂ leak tests; achieved 72-hour performance test for export gas compressors.
Client Commissioning Site Leader
Qatar Petroleum
- Led commissioning and start-up for offshore Bul Hanine redevelopment (phase-1b) including wellhead topsides, manifold platform, PS3 modifications, flowlines, umbilicals, and pipeline.
- Reviewed and commented on operating test procedures, commissioning sequences, and start-up plans; chaired offshore EPC contractor tests for pre-commissioning, hot commissioning, and handover.
- Identified and ensured completion of pre-start-up audit requirements across documentation, safety, process operation, electrical, control, telecom, and training.
- Achievements:
- Delivered key performance indicators and witnessed electrical energization and performance tests.
- Managed and witnessed DCS, ESD, FGS loop tests, cause and effect, interface/communication, and redundancy tests.
- Completed N₂ leak tests, purging, hot commissioning, gas lift start-up, performance tests, and black start procedures.
Completion and Commissioning Manager
Saipem
- Managed pre-commissioning, commissioning, and start-up for FPSO hull, topside, living quarters, pipeline, RO system, and integrated tests with subsea and ORF.
- Reviewed engineering design deliverables (sub-systems lists, ITR A/B, PIMS certificates) and developed commissioning sequence, strategy, constructability, and manpower plans.
- Delivered commissioning philosophy, execution procedures, and handover plans; reviewed leak test markups, flushing, and OTPs; implemented HAZID and SIMOP risk reductions; managed MOC impacts.
- Ensured PSSR, HSE risk assessments, and mitigation plans; energized electrical distribution; performed loop checks and cause and effect tests for ICSS.
- Conducted hydrocarbon gas compressor tests and FPSO start-up sequences including flare ignition, receiving facilities, export compression, production ramp-up, condensate stabilization, export, and MEG regeneration.
- Achievements:
- Populated PIMS database and delivered systemization and markups.
- Completed commissioning execution and start-up as scheduled.
Completion and Commissioning Manager
PT Wijaya Karya
- Led pre-commissioning, commissioning, and start-up for LNG plant including systemization, QEDI database, OTPs, execution plans, and milestone tracking.
- Chaired commissioning team, directed tests, developed recovery plans, defined impact mitigations, and implemented ORA.
- Reported progress, participated in PSSR audits, assisted operations during start-up; commissioned fuel gas, AGRU, dehydration, mercury removal, fractionation, liquefaction, and storage systems.
- Tested combined cycle turbine generator and Centum 3000 control system.
- Achievements:
- Delivered LOSH markups, QEDI database, check/test sheets, certificates, and multiple OTPs.
- Safely started up LNG plant and combined cycle generator; completed 72-hour export compressor performance test.
Commissioning and Start-up Manager
PT Tripatra Engineering
- Managed commissioning and performance tests for onshore oil and gas treatment facilities including storage, pumps, gas treatment, compression, fuel gas, lift, CO₂ injection, boilers, RO, water injection, telecom, pipelines, FSO, buildings, HVAC, and ASU.
- Performed load tests and certifications for gas and steam turbine generators and distribution; conducted loop checks, cause and effect matrix tests, interface, communication, leak, and N₂He tests.
- Developed pre-commissioning, commissioning, and start-up plans; set up Zenator database; monitored subsystem handovers; managed vendor mobilization; supported critical systems start-up; delivered commissioning philosophy, strategy, and specifications.
- Achievements:
- Populated systemization database and delivered handover procedures.
- Completed dynamic commissioning procedures, load tests for generators and switchgear with government certification.
- Completed DCS interconnection, ESD tests (levels 0–3), 72-hour compressor and CO₂/water injection performance tests, and first oil start-up.
Pre-Commissioning Coordinator/Leader
Total
- Coordinated pre-commissioning for Sisi Nubi & Peciko and South Mahakam wellhead platform projects including subsea pipelines, CCVT, PCS, ESD, FGS, instrument calibration, PSV, SDV, BDV, pumps, and chemical systems.
- Developed pre-commissioning philosophy and specifications; reviewed systemization, database setup, and procedures; monitored contractors for milestones using OPERCOM, ICAPS, and PRODOM methodologies; witnessed all discipline pre-commissioning activities.
- Reported status and progress.
- Achievements:
- Delivered systemization, ICAPS database, check/test sheets, certificates, and pre-commissioning execution ahead of schedule.
Engineer/Lead Mechanical Completion
McDermott International
- Led mechanical completion for FPSO Esso Kipper Tuna and CPP SUTUVANG projects; served as piping engineer for LNG V project.
- Managed pre-commissioning and commissioning of topside equipment including turbines, compressors, separators, chemical systems, power distribution, DCS, ESD, FGS, and instrument calibration.
- Achieved MC sign-off through ITR A three-party walk-downs, punch list clearance, ITR B function tests, and OTPs; provided MC and commissioning skylines; performed cleaning, hydro/ pneumatic tests, blowing, reinstatement, function, and dynamic tests.
- Achievements:
- Populated PIMS database and delivered systemization and pre-commissioning procedures.
- Completed pre-commissioning and offshore commissioning ahead of schedule with 0.65 productivity.
Mechanical / Commissioning Engineer
NMS Labroy Group
- Conducted testing for cargo gas/oil ship FPSO projects including slug catcher, pig trap, separator, condensate stabilization, export compressor, fuel gas, mooring, and ballast systems.
- Reviewed technical drawings; prepared testing plans and procedures; coordinated multidisciplinary teams; managed supervisors and technicians; ensured schedules, manpower, tools, and consumables; resolved testing issues.
- Achievements:
- Delivered testing procedures and completed safety-critical tests for rotating, static equipment, and systems on schedule.
Industry Experience
See where this freelancer has spent most of their professional time.
Experienced in Energy.
Business Area Experience
See which departments and functions this freelancer has contributed to most.
Experienced in Operations, Project Management, and Quality Assurance.
Summary
Over 15 years of experience in Mechanical Completion, Commissioning, Startup, and Handover. Completed Oil and Gas projects (LNG, FLNG, FPSO, Topside platforms, RO system, Pipeline, and buildings). Experienced as a client commissioning site leader (CSL) at ENI, Qatar Petroleum, and TOTAL.
Experienced as a contractor EPCC commissioning manager for four projects. Implemented working as a Team, OPERCOM methodology, quality assurance, project risk assessment, and solution. Managed commissioning and facilitated the construction, quality manager, and collaborated with engineering in determining the appropriate requirements for the equipment and plant. Completed 10 complex projects safely, effectively, met technical objectives, and within budget.
Skills
Commissioning Methodology And Strategy (Opercom)
Completions Management System (Cms)
Operation Readiness And Assurance (Ora)
Criticality Rating Assessment (Cra)
Operating Manual
Check Sheets & Procedures
Safety And Health Management System
Static & Rotating Equipment
Electrical (Power Generation, Transformer, Distribution & Ups)
Icss Control & Automation (Dcs, Esd & Fgs)
Process And Utility
Pims Database Software
Icaps Database Software
Edms (Electronic Document Management System)
Ms Project
Visio
Powerpoint
Ms Word
Excel
Languages
Education
Institute of Technology Sepuluh November (ITS)
Bachelor's degree in Marine Engineering · Marine Engineering · Surabaya, Indonesia
Certifications & licenses
Operation & Control Booster Compressor
JEREH Site Training
Automation Control Commissioning & Start-up
Engineering Canada
Electrical and Power Commissioning & Start-up
Engineering Canada
Mechanical Process Commissioning & Start-up
Engineering Canada
Plant Commissioning and Start-up
Commissioning Academy
Eptw Training Level 3
Qatar Petroleum
H2s/Ba-Opito- Venture Gulf Training Centre
Gulf Training Centre
T-Bosiet Opito- Venture Gulf Training Centre
Gulf Training Centre
9 Key Elements Of Successful Plant Commissioning
Consulting, INC.-Panama
PIMS Database Software & Administrator
Omega PS Singapore
Process Engineering & Hazop
Iforbit Madyan Persada
Process-Commissioning & Balance Energy
Iforbit Madyan Persada
Advanced Interpersonal Communication
Surabaya Technika Cipta
Safeguarding Plc (PCS, ESD, And FGS)
Surabaya Training
High Voltage Electrical Safety Operational
Prosafe Binatama
Advanced Leadership & Effective Supervisory
Surabaya Training
Certification Osh Expert Of Electrical (AK3)
DEPNAKERTRANS
Instrumentation & Control (PCS/ESD/FGS)
Mairodi Mandiri
Electrical Power Distribution & Testing
JP Consultant
Pipelines & Piping Process
JP Consultant
Project Management Professional (PMP)
Surabaya Training
Multiple Training (Confine Space, Sea Survival, Working At Height And Risk And Human Factors)
Konsultrain Service
Planning Essential
Global Learn McDermott
Rotating Equipment
Fiqry Jaya Manunggal
Statistics
Experience
Global Experience
Expertise
Qualifications
Profile
Frequently asked questions
Have questions? Find more information here.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
Similar Freelancers
Discover other experts with similar qualifications and experience
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Commissioning and Start-up Team Lead
Nearby freelancers
Professionals working in or nearby Westminster, Congo, the Democratic Republic of the