Experience
Cable Expert
BRO-Engineering
- Cable installation on SüdLink Los 1 HVDC Onshore Project with Jacobs/TenneT Glückstadt.
Root Cause Analysis Provider
BRO-Engineering
- Provided root cause analysis on cable protection systems for a German offshore windfarm.
Cable Design Expert
BRO-Engineering
- Developed and installed Ostwind 4 Baltic Sea on- and offshore HVDC project with 50Hertz Berlin.
Cable Package Manager
BRO-Engineering
- Led the Formosa II windfarm cable repair project in Taichung, Taiwan.
O&M Package Manager
BRO-Engineering
- Supported Skyborn Renewables for development of the OWFs HAIXIA (Taiwan) and SAIKAI (Japan).
Operations Manager & Cable Expert
BRO-Engineering
- Operations manager and certified cable expert for photovoltaic systems.
- Specialized in operation and maintenance of offshore wind farms, foundation development, subsea cable systems manufacturing and installation.
Operations Manager
b.offshore GmbH
- Technically and commercially responsible for design, mechanical/electrical engineering and offshore execution of new builds, retrofits, periodic testing and maintenance services of offshore windfarms.
Senior Project Manager
Tractebel DOC Offshore GmbH
- Served as cable expert and cable package manager for inner array and export cable projects.
- Managed cable package for LEMS (Les Éoliennes en Mer Service) in Paris: Îles d’Yeu et de Noirmoutier and Dieppe Le Tréport, France.
- Acted as technical expert for RTE HVAC export cables in St. Nazaire, Fécamp and Courseulles.
O&M Operations Manager / Deputy COO
WindMW
- Managed daily OWF operations including gearbox, main bearing and blade replacements, periodic testing, turbine service and troubleshooting (Siemens SWT-3.6).
- Conducted NCR and root cause analysis for blade erosion, converter failures, yaw failures and cable protection failures.
- Reported KPIs.
- Provided technical support during due diligence for company acquisition (Northland Power: Nordsee One, Gemini, Deutsche Bucht).
- Supported sale and comparative study of OWFs for CTG Xiangshui, China.
- Developed and sold projects for Nördlicher Grund OWF.
Cable Package Manager
WindMW
- Responsible for the inter-array cable package of Meerwind Süd/Ost OWF, Germany.
- Conducted cable factory audits at Norddeutsche Seekabelwerke, Telefonika Bydgoszcz (Poland), JDR Hartlepool and NKT.
Senior Project Manager Electrical Grid
BARD Offshore
- Managed subsea cable supply and installation and air lift diving operations.
- Performed root cause analysis of cable damages.
Project Manager
Norddeutsche Seekabelwerke
- Managed telecom, oil & gas and renewable energy subsea cable projects: BARD Offshore 1, Alpha Ventus, Statoil Heidrun-Norne-Bronnoysund and Sleipner-Grane, BP Azerbaijan Central Azeri, Chirag, Shah Deniz and Deep Water Gunashli, Faroer SHEFA-2 Cable, Nigeria GTS4 RUMUJI-BONNY, Kashagan offshore oilfield project, ARCOS repair & maintenance.
- Developed monopile cable protection system (CPS) and double-stopper cable pull-in.
Project Engineer
Benteler Automotive
- Started as suspension CAE (finite element analysis) designer.
- Promoted to core engineering group leader at Ford Motor Company UK for the B-Car rear suspension module.
- Worked under L1 work visa for three years in Kalamazoo, MI, USA.
Toolmaker Apprentice
NKT Nordenham
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Energy, Telecommunication, Automotive, and Manufacturing.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Product Development, Project Management, Operations, Production, Quality Assurance, and Procurement.
Frequently asked questions
Have questions? Find more information here.
Dirk is based in Nordenham, Germany and can operate in on-site, hybrid, and remote work models.
Dirk speaks the following languages: German (Native), English (Advanced), French (Elementary).
Dirk has at least 37 years of experience. During this time, Dirk has worked in at least 13 different roles and for 8 different companies. The average length of individual experience is 3 years and 8 months. Note that Dirk may not have shared all experience and actually has more experience.
Based on recent experience, Dirk would be well-suited for roles such as: Cable Expert, Root Cause Analysis Provider, Cable Design Expert.
Dirk's most recent position is Cable Expert at BRO-Engineering.
In recent years, Dirk has worked for BRO-Engineering, b.offshore GmbH, and Tractebel DOC Offshore GmbH.
Dirk is most experienced in industries like Energy, Telecommunication, and Automotive. Dirk also has some experience in Manufacturing.
Dirk is most experienced in business areas like Product Development, Project Management, and Operations. Dirk also has some experience in Production, Quality Assurance, and Procurement.
Dirk has recently worked in industries like Energy.
Dirk has recently worked in business areas like Project Management, Operations, and Production.
Dirk holds a Bachelor in Mechanical Engineering, Power Engineering.
Dirk has 8 certificates. Among them, these include: Dekra Certified Expert For Photovoltaic, Gwo Fire Awareness, and Gwo First Aid.
The availability of Dirk needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 26 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Max B.
Last position:
Project Manager, Plant Certification and Declarations of Conformity for 1–8 MWp Rooftop PV Projects at Solcom GmbH
- Technical management of parallel rooftop PV projects (Type A/B) from project planning through construction to completed plant certification
- Analysis of project requirements based on on-site inspections, planning reviews and evaluation of tender and project documents, and preparation of the findings for the internal planning department
- Derivation of work packages and milestones for each project, including structured filing in the client’s project documentation (SharePoint)
- Coordination of the planning phase between planning, procurement and executing trades
- Preparation of specifications and bills of materials as the basis for preparing quotations, and monitoring the timely submission of offers
- Coordination and monitoring of the construction phase, including schedule tracking and ensuring implementation in line with the plans
- Preparation and continuous updating of project schedules and project budgets across all projects
- Tracking of milestones, work packages and project progress, as well as early documentation and escalation of schedule and budget deviations to the overall project management
- Preparation of technical analyses of existing and planning data for each plant as the basis for the entire certification process
- Review, verification and compilation of all certification-relevant evidence: technical data sheets, manufacturer approvals, component documentation, test reports, type certificates and simulation results
- Assessment of the completeness and compliance of manufacturer documentation with applicable standards, identification of missing evidence, and requesting and tracking missing documents from manufacturers and installers
- Preparation and technical review of declarations of conformity for the grid connection of the plants
- Preparation of complete plant certification documentation for Type A/B in accordance with the applicable VDE application rules, the grid operators’ technical connection requirements (TAB) and the requirements of the certification bodies
- Review and documentation of protection concepts, as well as definition of the certification scope for each plant in technical coordination with the grid operators
- Submission of documents to grid operators and accredited certification bodies, follow-up on queries through final approval, and deadline management across parallel procedures
- Management of interfaces between the client, manufacturers, installers, grid operators and certification bodies, as well as complete project documentation with status overviews, communication logs and approval documents
Hasan K.
Last position:
Electrical Engineer - Design of Special Machines - Low-Voltage Switchgear at DSD HILGERS Stahlbau GmbH
Software: E-Plan Pro Panel, MS-Office.
- Design, revision and sizing of switchgear based on consumer lists (EMSR, power distribution, etc.)
- Design of control and main circuits
- Installation planning for electrical components (control cabinets, switches, cable types, terminals, etc.) for control cabinets
- Preparation of specifications and construction descriptions
- Creation of electrical schematics and electrical bills of materials in E-Plan P8
- Sizing, definition and standardization of electrical components
- Creation of documentation
- Creation of technical documents for manufacturing, assembly and service
- Macro creation
Dietmar D.
Last position:
Zertifizierter Sachverständiger für Elektrotechnik nach DIN 17024 at Sachverständigenbüro de Vries
- Bau und Liegenschaftsverwaltung NRW: Acceptance of photovoltaic systems
- Agrarservice Graf von Hardenberg: Acceptance of photovoltaic systems
- BVB 09 Dortmund: Defect report for a conversion project
- City of Duisburg: Defect report for the city center access barriers
- Freelancer as VEFK at LEONI Bordnetzsysteme GmbH, Kitzingen
- Project management for various projects at Aurubis AG, Lünen
Tobias K.
Last position:
GIS User Forum 2024 at TU Darmstadt
Bülent Ö.
Last position:
Freelance Overall Project Manager at energyconsult GmbH
- Project planning and lead engineering
- Coordination and negotiations with, among others, grid operators, substation suppliers, cable and civil engineering companies
- Analysis, description and documentation of engineering and documentation processes
- Calculation of cable cross-sections from the wind turbines to the substation
- Engineering and specification of cable types, requests for quotations and awarding of contracts to suppliers
- Specification of cable routes, requests for quotations and awarding of contracts to suppliers
- Specification of cable civil engineering work, requests for quotations and awarding of contracts to suppliers
- Civil engineering design
- Planning and monitoring of schedules and dependencies
- Coordination of the different trades
- Participation in project meetings
- On-site inspections of facilities when required
- Regular on-site appointments
Rüdiger S.
Last position:
Manufacturer of busbar systems for power and data transmission
- Review and assessment of the existing situation
- Identification and definition of implementation measures to close existing gaps
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Cable Expert
Nearby freelancers
Professionals working in or nearby Nordenham, Germany