Experience
Project and Construction Management
Günter Zinnitsch
- Project volume: €5.5 million
- Tenant fit-out for a bank in an existing building, which was being fully renovated by the owner in parallel
- Project duration: 7 months
- Tender procedure under public procurement law
- Service phases: construction supervision planning, project realization phase 8, and commissioning management
- Tasks:
- Advising the client
- Project and cost control (AHO 4–5)
- Commissioning management
- Relocation management
Project and Construction Management
Günter Zinnitsch
- Project volume: €68.0 million
- New-build production facility for industrial plants
- Project duration: 15 months
- Tendering process
- Service phases: project realization phase 2–8 and commissioning management
- Tasks:
- Advising the client
- Project and cost control (AHO 1–5)
- Commissioning management
- Relocation management
- Managing the preparation of documentation for the operating permit
Project and Construction Management
Günter Zinnitsch
- Project volume: €72.0 million
- Construction of a data center with 12 MW, external dimensions approx. 50.00 m × 55.00 m
- Project duration: 10 months
- Tendering process
- Service phases: project realization phase 5–8 and commissioning management
- Tasks:
- Leading the project team (specialized site supervisors for structural, civil, building services, electrical, instrumentation and safety engineering)
- Project and construction management
Cost Estimator
Günter Zinnitsch
- Project volume: €245.0 million
- Data center with dimensions (data center section 172.14 m × 153.94 m and office section 100.87 m × 18.09 m), parapet height 22 m, two storeys
- Project duration: 10 months (tender process/shell construction)
- Service phases: bid preparation based on HOAI phase 4
- Tasks:
- Cost calculation for cost groups 300/500 and parts of 400
Project Management
Günter Zinnitsch
- Project volume (timber hybrid): €28.0 million
- New-build student residence with office and fitness area, gross floor area 10,600 m²
- Project duration: 10 months
- Service phases: HOAI 1–4
- Tasks:
- Project development (requirements definition, economic viability calculation, tendering under public procurement law, architectural competition, building permit procedure)
Project and site management
Günter Zinnitsch
- Project volume: €18.0 million
- Renovation and expansion of a clinic / campus development, GFA 8,600 m²
- Project duration: 18 months
- Service phases: HOAI 6–8
- Tasks:
- Project and site management (HOAI 5–9)
- Tendering and awarding under public procurement law
- Commissioning
Project and site management
Günter Zinnitsch
- Project volume: €22.5 million (cost groups 200–700)
- New build and renovation of an AKG in Bensheim
- Project duration: 60 months
- Service phases: HOAI 2–8
- Tasks:
- Planning
- Change management
- Tendering and awarding under public procurement law
- Implementation and site management
- Commissioning
- Challenge: Building during ongoing school operations, interim states, coordination with school management
Project and site management
Günter Zinnitsch
- Project volume: €35.0 million
- New build of 170 residential units with underground garage in Karlsruhe, GFA 13,300 m²
- Project duration: 26 months
- Service phases: HOAI 2–8
- Tasks:
- Planning and plan review
- Tendering and awarding of design and construction services (public procurement law)
- Implementation and change management
- Commissioning
Overall project management
Günter Zinnitsch
- Project volume: €45.0 million
- Logistics center at Hamburg airport, GFA 22,000 m² logistics area, 9,000 m² office area
- Project duration: 36 months
- Service phases: HOAI 2–8
- Tasks:
- Planning
- Tendering and awarding
- Implementation and change management
- Commissioning
Overall building project management
Günter Zinnitsch
- Project volume for cruise terminal: €25.0 million
- Cruise Center Steinwerder Hamburg, GFA 22,000 m²
- Project duration: 19 months
- Service phases: HOAI 1–8
- Tasks:
- Project development
- Planning and plan review
- Tendering and awarding
- Implementation, site management, and change management
- Commissioning
Project and Construction Management
Günter Zinnitsch
- Project volume: €175.0 million
- Strandkai Hamburg, GFA 88,700 m² including underground car park and mezzanine level
- Project duration: 48 months
- Service phases: HOAI 1–7
- Tasks:
- Project development
- Coordination of planning and plan review
- On-site facility management
- Procurement strategy, tendering and awarding of shell construction and technical trades
- Technical consultation for buyers
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Construction, Education, Manufacturing, and Healthcare.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Project Management, Procurement, and Operations.
Frequently asked questions
Have questions? Find more information here.
Günter is based in Hamburg, Germany and can operate in on-site, hybrid, and remote work models.
Günter speaks the following languages: German (Native), English (Advanced).
Günter has at least 9 years of experience. During this time, Günter has worked in at least 4 different roles and for 1 company. The average length of individual experience is 1 year and 2 months. Note that Günter may not have shared all experience and actually has more experience.
Based on recent experience, Günter would be well-suited for roles such as: Project and Construction Management, Cost Estimator, Project Management.
Günter's most recent position is Project and Construction Management at Günter Zinnitsch.
In recent years, Günter has worked for Günter Zinnitsch.
Günter is most experienced in industries like Construction, Education, and Healthcare. Günter also has some experience in Manufacturing.
Günter is most experienced in business areas like Project Management, Procurement, and Operations.
Günter has recently worked in industries like Construction, Healthcare, and Manufacturing.
Günter has recently worked in business areas like Project Management, Procurement, and Operations.
The availability of Günter needs to be confirmed.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 27 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Tim C.
Last position:
Interim Site Manager at ECOnnect Energy AS
ECONNECT Energy is bridging the energy distribution gap with marine infrastructure solutions and services for the loading and offloading of LNG, Ammonia and Carbon Capture. ECONNECT Energy has developed a cost-efficient system for safe transfer of LNG, ammonia and CO2 between vessels and storage tanks, bypassing the need for building excessive jetties, quays or dredge large areas. ECONNECT Energy is rooted in the Norwegian maritime and energy tradition and builds upon decades of experience. The core competencies are cryogenic liquids, maritime engineering, and naval architecture as well as business development within the LNG, renewable fuel and carbon capture industries.
Stakeholder and relationship management: main point of contact for clients, subcontractors, and relevant authorities, maintaining good working relationships to ensure smooth project execution
Construction management: overseeing and managing all aspects of the project site, ensuring efficient and effective execution of the project plan
HSEQ responsibility: planning and execution phase for the onshore connection
Progress tracking: monitoring project progress and reporting, with immediate notification of any deviations from the project plan
Supervision of contractors and suppliers: supervising contractors and suppliers to ensure compliance with project standards and schedules
Nils H.
Last position:
Senior Advisor to CTO at McPhy Energy Energy S.A.
Head of Project Engineering: Led 6 teams through rapid growth, doubling headcount within 11 months; managed 3 team leads and 30+ engineers
Set up and led capacity forecast, project capacity alignment, outsourcing, and subcontracting of work packages for the Technology Unit (Engineering, R&D, Product Development)
Established quality metrics for the department’s engineering output and integrated them into bonus objectives for team leads and engineers
Conducted annual appraisals, objectives and bonus discussions, and personal development plans for 7 direct reports
Head of Program Management: Led the largest internal development program for next-generation 4 MW hydrogen electrolysis stacks. Result: “Go” for next phase “Basic Engineering”
Led a strategic make-or-buy study for core components (cathodes). Result: Component & manufacturing technologies down-selected and approved for next phase
Project Director "Green H2 Atlantic" in Sines, Portugal: Managed 100 MW project for a client consortium (EDP, Galp, ENGIE, Vestas, Bondalti, Martifer), funded with €30 m by the European Commission’s “Green Deal” and invited for grant preparation of “Innovation Fund”
Led and coordinated R&D activities under the “Green Deal” with contributors (ENGIE, DLR, ISQ) on topics such as standardization of test protocols, primary grid service, and advanced hydrogen management system
Supported “Green Deal” reporting and applications for various EU grants (e.g., Innovation Fund)
Led technical due diligence from OEM perspective, coordinating approx. 12 departments to respond to an external technical advisor
Corporate Partnerships: Established technological partnerships within the European hydrogen industry under IPCEI (Important Project of Common European Interest)
Andreas K.
Last position:
Project Manager at Winkelmann Building+Industry / Reflex Winkelmann
As part of a greenfield project, a new production plant is being built in Slovakia to produce industrial media storage for OEMs and distributors once completed.
Procurement and industrialization of production equipment for prefabrication.
Design, procurement, installation and integration of complete production lines based on stamping, forming and welding technology with integrated, labor-reducing processes.
Establishment of a production environment under strategic aspects according to the latest state of the art.
Overall and continuous communication with the entire greenfield team, adjacent departments and plant and executive management.
Development of concepts together with key suppliers and identification of ratio potentials along manufacturing process chains using value stream analyses.
Collection, assessment and application of process data such as throughput times, manufacturing times, setup times, wait and idle times using time and multimoment studies as well as surveys.
Forward-looking design of production systems and processes with the goal of implementing automated and competitive process solutions as part of comprehensive supply chain management.
Planning of production workflows, definition of manufacturing methods, design of the overall layout and workstations.
Determination and recording of process cost rates, overhead rates, cost evaluation of production processes, machine hourly rates, depreciation as well as expected share of claims and rework costs to optimize manufacturing costs.
Continuous optimizations of product designs for their adaptation into automation-oriented production environments until the plant's SOP.
Multi-project management for the engineering, design, procurement, installation and process integration of all relevant trades with respect to plant engineering, lifting equipment, production equipment and QA installations.
Ongoing establishment of an overall concept in constructive, plant engineering, logistical, IT and QA aspects.
Joel B.
Last position:
Senior Construction Supervisor for LOS D3a and D3b at SudOstLink
- Leading a team of 28 staff (BBB, HBB, ÖBB, IBB, ABB, GBB, öBÜ, SiGiKo, excavation supervisors, resident management)
- Coordinating and managing site activities
- Preparing reports for the client and progress reports
- Overall coordination and management of the assigned construction section (approx. 50 km)
- Schedule and invoice review as well as cost control
- Monitoring the execution of load-bearing structures for compliance with stability proofs
- Coordinating all parties involved in site monitoring
- Creating, updating, and monitoring a schedule (bar chart)
- Reviewing invoices, checking measurements and comparing with contract sums including claims
- Organizing acceptance of construction works, identifying defects and giving acceptance recommendation to the client
- Applying for official approvals and participating in them
- Systematic compilation of documentation, drawings and calculated results of the project
Andrés G.
Last position:
Freelancer at ALGK-BAUPRO
- Scope of work [link]
Birgit D.
Last position:
Interim Manager / Consultant at Lotsenbüro, mobile Bauten GmbH
- Setting up a purchasing department
- Tenders for framework agreements
- Negotiations and annual supplier meetings
- Support in searching for and hiring the new strategic buyer
- Preparing the existing software for use in purchasing
- Close coordination with production and warehouse regarding requirements
- Developing forms and contracts
- Defining the structure and processes in purchasing and the interfaces with other departments
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Project and Construction Management
Nearby freelancers
Professionals working in or nearby Hamburg, Germany
