Experience
Interim SQM Plastics
Thyssenkrupp Automotive
- Supplier management
- SQI audits
- Sustainability
Interim Head of Assembly
VAT Group AG
- Planning support
- Prioritization
- Employee recruitment
- Cleanroom
- Assembly supervision
Interim Operation Manager
SwissOptic AG, Jenoptik
- Head of Operations
- Production management
- Implementation and monitoring of KPIs
- Shopfloor management
- Maintenance
- SCM
- Production planning and process optimization
- Extended management team
Interim SCM Manager
Metzner Maschinenbau GmbH
- Planning support
- Prioritization
- Assembly supervision
- Progress monitoring
Interim Project Manager
Dietz-Technoplast GmbH
- Project management for Porsche Panamera leather-trimmed interior and seat parts
- Task force meetings
Interim Launch Manager
Magnetfabrik Bonn
- Task force with Bosch
- Process optimization proposals
- Project management
Interim Launch Manager
Möller-Tech, AKKA, UTPB
- Analysis of manufacturing problems
- Start-up difficulties
- Process optimization proposals
- PPAP
Interim Process Analyst
U-Shin
- Process optimization of laser welding for electronic tailgate openings
- Assessment of two laser welding systems
- Process optimization proposals
Interim Project Manager
Ulbrichts GmbH
- Development and project management of galvanized emblems
- Process optimization
Interim Supplier Manager
Mayer GmbH
- Supplier assessment and development
- Value analysis
- Process optimization
- Certification 16.949
Interim Lecturer
FAIN GmbH, IHK
- Webinars for future industrial foremen on plastics and rubber
- Training sessions
- Preparation for the master craftsman examination
Commodity Manager
KION Group AG
- Supplier evaluation and development
- Identifying and implementing cost reduction opportunities
- Supplier selection for new projects
- Manufacturing analyses
- Savings opportunities
- Production control for problem suppliers
- Process assessment and evaluation
Supplier Manager
Thyssenkrupp Presta
- Supplier evaluation and development
- Process optimization
- Audits
- Progress monitoring
Interim PLT
BMW AG
- Assessment and optimization of the injection molding production and assembly of door trim panels
- Maintenance and servicing proposals
Interim Production Manager
Freeglass GmbH & Co KG
- Process and workflow optimization during the launch of a new project
Interim Project Manager
Faurecia Angell-Demmel GmbH
- Development support for the interior of the new BMW Z4
- Process optimization
- International tool management
- Production launch at the Legnica plant in Poland
Interim Market Research
Bublon GmbH
- Use of the lightweight filler Bublon in plastics, paints and adhesives
Interim M&A
Hannover Finaz GmbH
- Assessment of a potential investment opportunity
- Technical and specialist support and consulting
Interim Development
Huawei R&D München
- Fundamental development for new antenna generations
- Support with all plastics-related questions
- 3D-MID
- Organosheets
Interim Project Manager
Murrplastik Produktionstechnik
- Development of a throttle valve, prototype construction and transfer to series production (Audi)
- Project management for actuators and U-boxes
- Coordination with various OEMs
- Parts costing
- Assembly process
- Tool management for prototypes and series production
- FMEA
- Supplier management
Interim Assembly Manager
Adoma
- Assembly management
- Shift planning and employee management
- Process optimization
- Cleanroom production of hygiene products for schools and dentists
- Printing and sterilization of these products
- GMT
Interim Project Manager
Becker Kunststofftechnik
- Project management of interior parts for the Audi Q7
- Coordination with external development and system supplier for the dashboard
- Coordination and approval by OEM Audi
- Tool management
Freelance Interim Management
IngBOlz GmbH
- Member and partner in various networks such as DDIM, DÖIM, VRIM, ABTF
Interim Development
Mayser Sicherheitstechnik
- Development and evaluation of a new joining technology
- Testing on a laboratory scale and transfer to a series product
- Production support
- Quality assurance and testing
- Assembly cost calculation
- Procurement of alternative materials
Site Manager Ehingen
Mohr-Präzisionsteile, GM Tec, KAP A
- Site management
- Restructuring with relocation of machines and automation systems
- Procurement of new and optimization of existing production cells
- Technical support for the site in Belarus
- Owner of toolmaking
- Plant structure planning
- Infrastructure expansion
- International SCM
- Reporting to the Managing Director
- Approx. 125 employees
Head of Technology and Sales
HTP-Motion, HTI
- Project management for the Porsche Panamera interior, optimization of 2K parts
- Site management, project management and sales
- Production and assembly support
- Cleanroom production and assembly of dental equipment and mixing components
- Development, in-house mold design and toolmaking
- Tool management
- Application engineering
- Material selection
- Reporting to management across sites
- Regular coordination with Tier 1 suppliers
- PPAP, APQP
- Responsibility for the Porsche Panamera interior
- Approx. 25 direct reports
- Approx. 125 employees at the site
- Closure of the plant, relocation to the Austrian and Slovakian plants
Tool Project Manager
Gardena, Husqvarna
- Project management for electronic tire pressure sensors, APQP, PPAP (OEM)
- Development and production of child seats, optimization based on crash tests (Römer)
- International customer support and project management
- Sales support, application engineering and plastic-compatible part design
- Support for in-house development and management of external developers
- Part costing
- Tool management
- PPAP coordination with international customers
Head of Market and Technology
Magura, MBG
- Project management for an automated production line for overmolded magnets
- Restructuring / establishment of the Plastics Profit Center, plastic brake components
- Establishment of the Plastics Technology Profit Center
- Restructuring from a hierarchical to a process-oriented structure
- Establishment of an independent quality assurance department
- Application engineering and plastics support internally and externally
- In-house mold design and toolmaking
- Mechatronic assemblies in cooperation with the in-house Bebro-Electronic
- Establishment of plastics production in the Czech Republic
- Establishment of an online presence, network
- Negotiations with customers and suppliers
- Specifications, procurement and negotiation of equipment and automation systems
- Budget and sales responsibility
- Reporting to management
- 4 direct reports
- Profit center with approx. 60 employees
- 3-shift operation
- Automotive and pneumatic customers
Deputy Department Manager
Hilti - Plastics Technology
- Personnel planning for 3-shift, 7-day operation
- Maintenance of more than 100 injection molding machines
- Establishment of an electronic production planning board with production data collection support
- Support for work preparation, production and assembly
- Regular management meetings
- Team member for new developments, including costing and project management
- 4 directly reporting foremen
- Approx. 100 production employees
Group Manager
Geberit AG
- Development support through plastic-compatible part design, material selection and rheological calculations
- Part costing and competitor analyses
- Technological support for the main plant and subsidiaries
- Introduction of new production processes (2K, GID, LSR)
- Process optimization
- Management team member in development
- Approx. 800 employees, more than 100 injection molding machines
- Presses and hollow-body blow molding systems
- Establishment of an expert system
- Reporting to managing directors and division managers
- Management of a group of 5 direct reports
Operations Assistant
HB – Plastic, SFS-intec
- Order planning, production support, tool design, tool management
- Set up quality assurance (Q101)
- Coordination with Tier 1, safety components (belt systems)
- Assembly support
- Application engineering
- Reporting to management
- Set up skin punching production
- Approx. 50 employees
Technical Clerk
Austrian Research Institute, ÖFI
- Set up plastics in construction with a civil engineer
- Industrial and research projects
- Renovation monitoring at Albertina Wien
- Crack-bridging coatings
- Polymer concrete
Industry experience
See where this freelancer has spent most of their professional time.
Experienced in Manufacturing, Automotive, Professional Services, Construction, Healthcare, and Telecommunication.
Business area experience
See which departments and functions this freelancer has contributed to most.
Experienced in Production, Product Development, Project Management, Quality Assurance, Operations, and Strategy.
Frequently asked questions
Have questions? Find more information here.
Robert is based in Widnau, Switzerland.
Robert speaks the following languages: German (Native), English (Advanced), French (Elementary).
Robert has at least 42 years of experience. During this time, Robert has worked in at least 26 different roles and for 32 different companies. The average length of individual experience is 1 year and 4 months. Note that Robert may not have shared all experience and actually has more experience.
Based on recent experience, Robert would be well-suited for roles such as: Interim SQM Plastics, Interim Head of Assembly, Interim Operation Manager.
Robert's most recent position is Interim SQM Plastics at Thyssenkrupp Automotive.
In recent years, Robert has worked for Thyssenkrupp Automotive, VAT Group AG, SwissOptic AG, Jenoptik, and IngBOlz GmbH.
Robert is most experienced in industries like Manufacturing, Automotive, and Professional Services. Robert also has some experience in Construction, Healthcare, and Telecommunication.
Robert is most experienced in business areas like Production, Product Development, and Project Management. Robert also has some experience in Quality Assurance, Operations, and Strategy.
Robert has recently worked in industries like Professional Services, Manufacturing, and Automotive.
Robert has recently worked in business areas like Strategy, Operations, and Production.
Robert holds a Master in Executive MBA from Donau Universität Krems.
Robert has 1 certificate: Lean Six Sigma Yellow Belt.
Robert is immediately available full-time for suitable projects.
Daily rate distribution
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Average rates for similar positions
Rates are based on recent contracts and do not include FRATCH margin.
The average daily rate is the mean of all daily rates from recent contracts of comparable freelancers on our platform.
The median daily rate is the middle value of all daily rates — half of comparable freelancers charge less, half charge more. Unlike the average, it is barely affected by outliers.
Calculated based on our freelancers’ daily rates as of 27 Nov 2026. Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.
Similar freelancers
Discover other experts with similar qualifications and experience
Andreas A.
Last position:
Project Manager for Network and Infrastructure Project Migration EU/US/MEX at Klöckner & Co SE
- Implementation of a Network Access Control (NAC) security system at 106 locations in the USA, Mexico, and three European countries to safeguard facilities against cyberattacks.
- Management of infrastructure renewal in the core network in the USA and Mexico, transitioning to a new hardware provider.
- Optimization of LAN, WAN, and WLAN infrastructure, including division of network topology into dedicated VLAN segments for IT and OT separation.
- Development of project scope definition considering technical and organizational business requirements.
- Integration of local IT resources and external suppliers to capture functional, temporal, and financial requirements.
- Specification of work packages for US/EU NAC system implementation and modernization of the US core network.
- Acquisition of necessary approvals for project execution and budgeting from the board.
- Creation of rollout plans, inventory data collection, data validation, and drafting detailed project definitions.
- Development of a central project control application.
- Execution of pilot implementations to test developed solutions.
Atif T.
Last position:
Director of Operations (Interim) at Hyva
- Took full responsibility for P&L, R&D, HR, finance and quality at Hyva Italy
- Reduced downtime by 30% through efficient optimization of production planning
- Increased productivity by 20%
- Initiated control mechanisms like whiteboards to improve transparency and efficiency
- Enhanced employee satisfaction through clear structures and effective leadership
- Reduced headcount by approximately 15%, from 224 to 199, without impacting productivity
- Achieved cost savings of €1.35 million through vehicle leasing and closing an external warehouse
- Organized weekly strategy meetings with department heads and stakeholders to foster collaboration and strategic alignment
Stephan J.
Last position:
Interim Project Management Office Advisor at Noske-Kaeser Equans
Project management process harmonization between French parent company (Equans Group, Axima Marine) and German manufacturing company (Noske Kaeser) for marine refrigeration and air conditioning systems.
Andreas T.
Last position:
Transformation Consultant at Bank-regulated environment (NDA)
Subproject Lead – Nearshoring Transformation
Project context: Support of a transformation program for relocating operational services to an international nearshore model
- Subproject lead
- Assessment of existing organizational and operating models
- Conducting GAP analyses
- Development of a sourcing readiness model
- Coordination of various departments
- Management of external partners
- Documentation of organizational changes
- Monitoring of the service provider / nearshoring partner
Jo N.
Last position:
Sterbfritz Plant Technical Manager at OPmobility
- Interims Technical Manager during a sick leave replacement.
- Led the development team and took over technical development topics in the plant.
- Conducted successful de-escalation activities for two customers across two sites (mother plant and SILS).
- Trained new team members and performed assessment and development reviews at management and team level.
- Performed capacity and strategy reviews, including production relocation activities.
- Managed internal projects and supported struggling suppliers.
Nenad C.
Last position:
Interim Manager in Project Management, Manufacturing, Infrastructure, Process Flow and OEE – Production and Test Lab at Trench Group Austria
- Coordinated projects to expand the production and testing of coils for electrical power technology used in substations
- Analyzed business cases for manufacturing concepts and saved €1.9 million as a result
- Planned and implemented infrastructure projects, including a test lab, with internal departments, structural engineers, architects, fire protection and sound insulation specialists, authorities and test technology development; saved €50,000 and met project deadlines
- Procured container buildings efficiently
- Coordinated the internal project team in a focused and people-oriented manner and did not shy away from conflicts: layout planning, development, test technology, OEE, production management and management
- Analyzed the plant’s process flow and OEE and saved €200,000 in additional building costs
- Implemented project management tools in the specialist department
- Ensured transparent communication and reporting, thereby enabling decisions by senior management
Experts recently working on similar projects
Freelancers with hands-on experience in comparable project as a Interim SQM Plastics
Nearby freelancers
Professionals working in or nearby Widnau, Switzerland

